Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Storage

944 unique locations (3108 components) - Page 34 of 38

4.18 MW
Cirencester Solar Farm Witpit Lane Preston Cirencester GL7 5PW (To Witpit Lane entrance use GL7 5RJ) (5 components)

A 10MW/46.6MWh Battery Energy Storage System to be installed at Cirencester Solar Farm (3)

Active • 2025-26 (T-4), 2024-25 (T-1) ...
6.23 MW
Church Road, Chelmsford, CM2 8UN (1 component)

This CMU component represents the BESS system of a co-located (solar and storage) site

Active • 2027-28 (T-4)
3.72 MW
Church Hill Rd, Middleton-on-the-Wolds, Driffield YO25 9UG (6 components)
• 0.250MW Battery Energy Storage System (2)
• 0.25MW of Demand Reduction
Active • 2025-26 (T-4), 2024-25 (T-4) ...
Chinley House Farm, Dolly Lane, High Peak, Stockport, SK23 7NP (1 component)

A Battery Energy Storage System

Active • 2025-26 (T-4)
Childerley Farm, Dry Drayton, Cambridgeshire, United Kingdom, CB23 8BA (1 component)

New build BESS alongside new build solar farm.

Active • 2028-29 (T-4)
6.20 MW
Chesterfield Road, Swallownest, Sheffield, S26 4SX (2 components)
• Gas fired reciprocating engines
• New Build Generating CMU comprising of battery storage and associated plant.
Active • 2026-27 (T-4), 2021-22 (T-4)
2.84 MW
Chesterfield Road, Sheffield, West Yorkshire, S26 4XB (3 components)

New Build CMU comprising of battery storage and associated plant (2)

Active • 2028-29 (T-4), 2027-28 (T-4)
8.62 MW
Chapelton, Fraserburgh, Aberdeenshire, Scotland, AB43 7BL (1 component)

Battery energy storage system, together with associated equipment, infrastructure and ancillary works.

Active • 2027-28 (T-4)
4.62 MW
Chapel Farm, Luton Road, Charlton, Luton, LU4 9UJ (7 components)

49.5 MW Battery Energy Storage facility (3)

Active • 2025-26 (T-4), 2024-25 (T-4) ...
18.33 MW
Causeway Power, The Causeway Industrial Site, Maldon, CM9 4GG (1 component)

CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid

Active • 2026-27 (T-4)
1.18 MW
Catsbrain Farm, Stratton St Margaret, Swindon, SN3 4TD (8 components)

The CMU component at Catsbrain Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 20 MW export capacity and an import capacity of 20 … (3)

Active • 2025-26 (T-4), 2024-25 (T-4) ...
Catahoula Fields, Eglantine Lane, Farningham, Kent, DA4 9JL (1 component)

New Build CMU comprising of battery storage and associated plant

Active • 2027-28 (T-4)
0.68 MW
Castle Sports Complex, Albion Street, PE11 2AJ (1 component)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2028-29 (T-4)
0.05 MW
Castlelaurie Industrial Estate, Bankside, Falkirk FK2 7XF (1 component)

New build battery storage

Active • 2028-29 (T-4)
7.66 MW
Carnegie Road, Stoneycroft, Liverpool, Merseyside, Liverpool City Region, L13 7GD (1 component)

Standalone battery energy storage system

Active • 2026-27 (T-4)
9.93 MW
Carnegie Road, Liverpool, L13 7HY (1 component)

The CMU comprises lithium ion batteries housed in ISO containers used to house the converters

Active • 2025-26 (T-1)
1.36 MW
Carnegie Road, Liverpool L13 7HY (1 component)

The CMU comprises Lithium Ion batteries housed in ISO containers with additional containers used to house the converters.

Active • 2024-25 (T-4)
Carlton, Stockton-on-Tees, TS21 1EA (9 components)

Battery storage located at Carlton, Stockton-on-Tees, TS21 1EA with a nameplate capacity of 1.200 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU over 3 … (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
0.20 MW
Capenhurst Lane Cheshire CH66 2NT (1 component)

A 99.8MW battery storage system comprising approx 13 skids, to be installed at Capenhurst Lane

Active • 2025-26 (T-4)
Camsiscan Farm, Craigie, South Ayrshire, Scotland, KA1 5JT (4 components)
• An 87.500 MW Battery Storage Site Component.
• An 87.500 MW New Build Battery Storage Site Component
• An 87.500 MW New Build Battery Storage Site Component.
Active • 2028-29 (T-4)
55.20 MW
18.15 MW
Loading map...
Showing 25 locations