Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Storage

1265 unique locations (3870 components) - Page 45 of 51

Church Hill Rd, Middleton-on-the-Wolds, Driffield YO25 9UG (6 components)
• 0.250MW Battery Energy Storage System (2)
• 0.25MW of Demand Reduction
Active • 2025-26 (T-4), 2024-25 (T-4) ...
Church Farm Solar Farm Slapton Leighton Buzzard Bedfordshire LU7 9BX (2 components)

The CMU consists of a battery energy storage system, physically co-located at the site of, but distinct from an existing solar PV generator. (2)

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Church Bottom, Salisbury, SP4 6NN (3 components)
• 10 x 1mw Battery Storage units to be installed on designated land at Church Bottom - Connection offer is for …
• 19 x 1mw Battery Storage units to be installed on designated land at Church Bottom - Connection offer is for …
• 20 x 1mw Battery Storage units to be installed on designated land at Church Bottom - Connection offer is for …
Inactive • 2022-23 (T-4)
Chinley House Farm, Dolly Lane, High Peak, Stockport, SK23 7NP (1 component)

A Battery Energy Storage System

Active • 2025-26 (T-4)
Childerley Farm, Dry Drayton, Cambridgeshire, United Kingdom, CB23 8BA (1 component)

New build BESS alongside new build solar farm.

Active • 2028-29 (T-4)
6.20 MW
Chickerell substation, Weymouth, Dorset, DT4 9WW (1 component)

49.9MW Lithium Ion Batteries and power conversion system installed in a compound at Chickerell Substation.

Inactive • 2023-24 (T-4)
Chesterfield Road, Swallownest, Sheffield, S26 4SX (2 components)
• Gas fired reciprocating engines
• New Build Generating CMU comprising of battery storage and associated plant.
Active • 2026-27 (T-4), 2021-22 (T-4)
2.84 MW
Chesterfield Road, Sheffield, West Yorkshire, S26 4XB (3 components)

New Build CMU comprising of battery storage and associated plant (2)

Active • 2028-29 (T-4), 2027-28 (T-4)
8.62 MW
Chapelton, Fraserburgh, Aberdeenshire, Scotland, AB43 7BL (1 component)

Battery energy storage system, together with associated equipment, infrastructure and ancillary works.

Active • 2027-28 (T-4)
4.62 MW
Chapel Farm, Luton Road, Charlton, Luton, LU4 9UJ (7 components)

49.5 MW Battery Energy Storage facility (3)

Active • 2025-26 (T-4), 2024-25 (T-4) ...
18.33 MW
Causeway Power, The Causeway Industrial Site, Maldon, CM9 4GG (1 component)

CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid

Active • 2026-27 (T-4)
1.18 MW
Catsbrain Farm, Stratton St Margaret, Swindon, SN3 4TD (8 components)

The CMU component at Catsbrain Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 20 MW export capacity and an import capacity of 20 … (3)

Active • 2025-26 (T-4), 2024-25 (T-4) ...
Catahoula Fields, Eglantine Lane, Farningham, Kent, DA4 9JL (1 component)

New Build CMU comprising of battery storage and associated plant

Active • 2027-28 (T-4)
0.68 MW
Castle Sports Complex, Albion Street, PE11 2AJ (1 component)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2028-29 (T-4)
0.05 MW
Castlelaurie Industrial Estate, Bankside, Falkirk FK2 7XF (1 component)

New build battery storage

Active • 2028-29 (T-4)
7.66 MW
Castlebridge, Alloa, Clackmannanshire, FK10 3QA (1 component)

The CMU component at Castelbridge is an energy storage system comprised of batteries and will have an import and export capacity of 5MW.

Inactive • 2021-22 (T-4)
Carnegie Road, Stoneycroft, Liverpool, Merseyside, Liverpool City Region, L13 7GD (1 component)

Standalone battery energy storage system

Active • 2026-27 (T-4)
9.93 MW
Carnegie Road, Liverpool, L13 7HY. (3 components)

The CMU comprises Lithium Ion batteries housed in ISO containers with additional containers used to house the converters. (3)

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Carnegie Road, Liverpool, L13 7HY (1 component)

The CMU comprises lithium ion batteries housed in ISO containers used to house the converters

Active • 2025-26 (T-1)
1.36 MW
Carnegie Road, Liverpool L13 7HY (1 component)

The CMU comprises Lithium Ion batteries housed in ISO containers with additional containers used to house the converters.

Active • 2024-25 (T-4)
Carlton, Stockton-on-Tees, TS21 1EA (9 components)

Battery storage located at Carlton, Stockton-on-Tees, TS21 1EA with a nameplate capacity of 1.200 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU over 3 … (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
0.20 MW
Capenhurst Lane Cheshire CH66 2NT (1 component)

A 99.8MW battery storage system comprising approx 13 skids, to be installed at Capenhurst Lane

Active • 2025-26 (T-4)
Loading map...
Showing 25 locations