Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Storage

1265 unique locations (3870 components) - Page 47 of 51

Broadgate Whaplode Drove Spalding PE12 0TN (1 component)

Energy storage system providing capacity market, dynamic FFR and other balancing services.

Inactive • 2021-22 (T-4)
Broadfield Farm Northleach Cheltenham GL54 3PH (1 component)

A 5MW Energy storage system located at Cheltenham.

Inactive • 2021-22 (T-4)
BRLR, land east of Redhouse electricity substation, Heatherywood Road, Kirkcaldy, Fife, KY1 3NW. (1 component)

Battery energy storage system (1c rating, NMC lithium ion) comprising eight inverters with nominal power output rating of 2.0MW each (16.0MW total). The connection capacity of the BESS has been …

Active • 2028-29 (T-4)
1.05 MW
Bristol Road Gloucester GL2 5YA (2 components)

The CMU will be formed of multiple individual storage units controlled centrally and exporting to the distribution system.

Inactive • 2018-19 (T-1)
Bristol Avenue, Blackpool, FY2 0JF (6 components)
• New Build CMU comprising of battery storage and associated plant (2)
• Existing CMU comprising of battery storage and associated plant
Active • 2026-27 (T-4), 2025-26 (T-4) ...
18.87 MW
Brinksway, Stockport, SK3 0BY (2 components)

A Battery Energy Storage System (2)

Inactive • 2023-24 (T-4), 2022-23 (T-3)
Brindley Close, Cheney Manor, Swindon, SN2 2YW (1 component)

12MW Battery Storage located at Brindley Close in Swindon

Active • 2024-25 (T-4)
Breck Road, Wallasey, Liverpool (2 components)

The Burbo Bank battery is a 2MW/2MWh Battery located near the Burbo Bank offshore wind farm, and near Scottish Power Energy Network's Wallasey substation. (2)

Inactive • 2021-22 (T-4), 2019-20 (T-1)
Breach Farm, Swadlincote, Derbyshire, DE12 6RJ (8 components)

The CMU component at Breach Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 40 MW export capacity and an import capacity of 40 … (3)

Active • 2025-26 (T-4), 2024-25 (T-4) ...
Braehead Farm Riccarton Kilmarnock KA1 5LN (4 components)

A new battery storage system comprising batteries, containers, inverters, control systems and associated balance of plant. This will be constructed on agricultural land, approximately 250 Metres north of Kilmarnock Substation. …

Active • 2028-29 (T-4)
71.20 MW
Boundary Street, Wigan WN1 3AP (6 components)

The CMU will be formed of multiple individual storage units controlled centrally and exporting to the distribution system. (3)

Inactive • 2021-22 (T-4), 2019-20 (T-1) ...
Boscar Grange Farm York YO61 3NQ (5 components)

Battery Energy Storage system operating alongside solar farm (3)

Active • 2025-26 (T-1), 2024-25 (T-4) ...
3.68 MW
Borland Ave, Carlisle CA1 2TL (2 components)

2MW BESS (2)

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Bore Tree Baulk, Grimston, Dunnington, York,YO19 5HE (3 components)

New build battery storage (3)

Active • 2025-26 (T-4), 2024-25 (T-1) ...
Bootle Data Centre, Bridle Road, Bootle, L30 1PH (3 components)
• two 1.4MW caterpillar generators (2)
• 11MW of 60 minute frequency response, battery storage
Inactive • 2021-22 (T-4), 2018-19 (T-1)
Boot Lane, Sandbach, Cheshire CW11 3PY (2 components)
• 20MW of Battery Energy Storage Systems
• 26.000MW of Reciprocating Engines
Active • 2025-26 (T-4)
Bonnybridge WWTW, Larbert Rd, Bonnybridge, Stirling, FK5 0NP (1 component)

60MW/60MWh BESS

Active • 2026-27 (T-4)
7.09 MW
Bolney Substation, Wineham Lane, Bolney, Haywards Heath, BN5 9AW (1 component)

49.9mw Lithium Ion batteries and power conversion system on a compound at Bolney Substation

Inactive • 2023-24 (T-4)
Blueloop House, Ilchester Road, Yeovil, BA21 3AA (1 component)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2028-29 (T-4)
0.05 MW
Bluehouse Farm, Newton Bewley, Billingham, Durham, TS22 5PW (9 components)

Battery storage located at Bluehouse Farm, Newton Bewley, Billingham, Durham, TS22 5PW with a nameplate capacity of 1.200 MW. Connection capacity is calculated as the Average Output of the Existing … (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
0.20 MW
Bliney Road, off Grove Road / Grundisburgh Road Roundabout, Woodbridge IP12 4HH (1 component)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2028-29 (T-4)
0.05 MW
Blandford Road, Poole, BH16 6AB (5 components)
• A 25 MW Battery Storage Site
• A 25MW Battery Storage Site
• A 25MW New Build Battery Storage Site
Active • 2026-27 (T-4), 2025-26 (T-1) ...
18.78 MW
Blacklaw Windfarm, North Lanarkshire, ML2 9PJ (1 component)

1 x 75MW Lithium-ion battery with duration of 1 hour

Active • 2026-27 (T-4)
8.86 MW
Blackford, Aberdeenshire, AB51 8YN (2 components)

A 50MW New Build Battery Storage Site (2)

Active • 2028-29 (T-4), 2027-28 (T-4)
13.65 MW
Blackburn Meadows Power Station, Alsing Road, Tinsley, Sheffield, S9 1HF (3 components)

A site with a 10MW, 5MWh (2C) Lithium Ion Battery system, the system is connected to the distribution network via the same connection as a nearby biomass power station. The … (3)

Inactive • 2020-21 (T-4), 2019-20 (T-1) ...
Loading map...
Showing 25 locations