Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Storage

1265 unique locations (3870 components) - Page 48 of 51

Unit 1 Guildford Road Industrial Estate Hayle TR27 4QZ (2 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (2)

Active • 2028-29 (T-4), 2025-26 (T-1)
0.16 MW
Unit 1 Junction Lane, Newton-le-Willows, Merseyside, WA12 8DN. (1 component)

The batteries are housed in 1 No ISO container with an additional container used to house converters. The batteries will be installed in the containers on-site and the complete battery …

Battery Storage Shaw-Energi Ltd Not Prequalified WA12
Inactive • 2021-22 (T-4)
Unit 23, Cocker Avenue, Poulton Industrial Estate, FY6 8JU (1 component)

CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid

Active • 2025-26 (T-4)
Unit 2, Cunliffe Site, Industrial Estate Road, Llangefni, LL77 7JA (1 component)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2028-29 (T-4)
0.05 MW
Unit 2, Sentinel House, Enigma Business Park, WR14 1GL (2 components)

Battery Energy Storage System (2)

Inactive • 2022-23 (T-4), 2021-22 (T-4)
Unit 30, New York Way, New York Industrial Park, NE27 0QF (1 component)

Battery Energy Storage System

Inactive • 2021-22 (T-4)
Unit 3, Honeyborough Industrial Estate, Neyland, Milford Haven, SA73 1SE (1 component)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2028-29 (T-4)
0.05 MW
Unit 3, Wallbridge Industrial Estate, Wallbridge, Stroud, Gloucestershire, GL5 3JU (2 components)

This CMU is formed of a battery bank and PCS capable of providing in excess of 2MW of power. The system is connected via switch gear and a transformer to … (2)

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Unit 5, Bloxwich Lane Estate, Walsall, WS2 8DL (3 components)

BESS System made of 35x1.25 MVA Inverters connected to Batteries in a designated warehouse. (3)

Active • 2025-26 (T-1), 2024-25 (T-1) ...
4.64 MW
Unit A ? Apex 30, 233-269 London Road, Stainess, TW18 4JU (2 components)

The CMU at Staines will be an energy storage facility with a maximum import and export capacity of 49.9MW. (2)

Inactive • 2022-23 (T-4), 2021-22 (T-4)
Unit G, Algernon Industrial Estate, North Shields, Tyne And Wear, NE27 0NB, United Kingdom (17 components)
• Existing 25 MW storage site using Lithium Ion Batteries (2)
• 25 MW storage site using Lithium Ion Batteries
Active • 2026-27 (T-4), 2025-26 (T-1) ...
11.75 MW
Units 1 And 2, Brook Hill Industrial Estate, Plymouth Avenue, Pinxton, Nottingham, NG16 6RA (1 component)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2028-29 (T-4)
0.05 MW
Units 2, 3, 4 And 4A Kinmel Park Industrial Estate, Bodelwyddan, LL18 5TY (1 component)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2028-29 (T-4)
0.05 MW
Unnamed Road Dunblane FK15 9RD (1 component)

9.999 MW Battery Storage unit located at Dunblane.

Inactive • 2021-22 (T-4)
Upton Lane, adjacent to Rownhams BSP Substation SO16 0XY (7 components)

10MW battery energy storage facility at Upton Lane, Rownhams (3)

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Uskmouth Power Station West Nash Road, Nash, Newport, Wales, NP18 2BZ (1 component)

AW1 Energy Storage Limited (AW1) will develop a Battery Energy Storage System (BESS) at land adjacent to the substation and will initially develop a 120 MW / 240 MWh BESS …

Active • 2028-29 (T-4)
20.10 MW
Uskmouth Power Station, West Nash Road, Newport, NP18 2BZ (2 components)

115MW battery energy storage system on a shared transmission connection

Active • 2028-29 (T-4)
16.12 MW
Valley Park Inverkip Road Greenock PA16 0AH (1 component)

18 MW storage battery located at Greenock

Inactive • 2021-22 (T-4)
Verge at Godstone Fire Station, Fosterdown, Godstone, RH9 8BQ (1 component)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2028-29 (T-4)
0.05 MW
Verge at Oldbrook Boulevard, Nr Rhodes Place, Milton Keynes, MK6 2LU (1 component)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2028-29 (T-4)
0.05 MW
Verge at Phoenix Road / Hadenham Road Junction, Lowestoft NR33 7NF (1 component)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2028-29 (T-4)
0.05 MW
Loading map...
Showing 25 locations