Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Storage

1265 unique locations (3870 components) - Page 48 of 51

Birch Road, Colchester CO2 0EJ (2 components)

This CMU component represents the BESS system of a co-located (solar and storage) site (2)

Active • 2027-28 (T-4), 2025-26 (T-1)
10.68 MW
Birch House, Forge Lane, Moorlands Trading Estate, Saltash, PL12 6LX (2 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (2)

Active • 2028-29 (T-4), 2025-26 (T-1)
0.16 MW
Birch Holt Farm Burton By Lincoln LN1 2RG (1 component)

The CMU component at Leverton Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 9.8 MW export capacity and an import capacity of 5MW.

Inactive • 2018-19 (T-1)
Bilton Farm, Preston Road, Hull, HU11 4DZ (8 components)
• Battery Energy storage linked to solar farm (2)
• Solar farm
Active • 2024-25 (T-4), 2023-24 (T-1) ...
Bickley Solar Farm, Bickley Solar Farm, Albrighton, Wolverhampton, WV7 3AT (1 component)

This CMU component represents the BESS system of a co-located (solar and storage) site

Active • 2027-28 (T-4)
0.83 MW
Bicker Road Donington Spalding PE11 4XR (1 component)

Energy storage system providing capacity market, dynamic FFR and other balancing services.

Inactive • 2021-22 (T-4)
Bewsley Hill, Copplestone, Crediton, EX17 5LX (1 component)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2028-29 (T-4)
0.05 MW
Bevercotes Energy Park, West Drayton Avenue, Bevercotes DN22 8DB (2 components)

Battery storage (2)

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Bengrove Farm, Base Lane, Sandhurst, Gloucestershire, GL2 9NU (1 component)

CMU ID 22BEN4, a new build battery storage CMU

Active • 2026-27 (T-4)
8.66 MW
Belvedere Lane, Milton Keynes, MK17 9JH (2 components)
• 3 x 2MW Gas fuelled generator units to be installed on designated land within a compound at Belvedere Nurseries
• Grid-scale energy storage system based on Lithium Ion, capable of exporting 8MW for a 1 hour duration installed on designated …
Active • 2025-26 (T-4)
Bell Farm Loders Bridport DT6 3SA (1 component)

A 5MW Energy storage system located at Bell Farm, Bridport

Inactive • 2021-22 (T-4)
Beeston Park Farm, Ridge End Fold, Marple, Stockport, SK6 7EX (1 component)

A Battery Energy Storage System

Active • 2025-26 (T-4)
Beechgrove Farm, Axminster, Devon, EX13 5TX (1 component)

The CMU component at Breechgrove Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 10 MW export capacity and an import capacity of 10 …

Inactive • 2021-22 (T-4)
Battery Storage, Keel Drive, Slough, SL1 2YA (4 components)
• A 20MW New Build Battery Storage site (2)
• A 29.5MW New Build Battery Storage site
Inactive • 2023-24 (T-4), 2022-23 (T-3)
Battery Plant, Fideoak Mill, Fideoak, Taunton, TA4 1AF (5 components)

Battery Energy Storage System (3)

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Basingstoke Energy Storage Facility, Basing Road, Old Basing, Basingstoke, Hampshire, RG24 7AL (3 components)

New Build CMU comprising of battery storage and associated plant (3)

Active • 2027-28 (T-4), 2025-26 (T-1) ...
5.29 MW
Basing Road, Basingstoke, RG24 7AN (4 components)

New Build CMU comprising of battery storage and associated plant (3)

Active • 2026-27 (T-4), 2025-26 (T-4) ...
5.14 MW
Barton Hill Way, Torquay, TQ2 8JG (7 components)
• New Build CMU comprising of battery storage and associated plant (2)
• Existing CMU comprising of battery storage and associated plant
Active • 2026-27 (T-4), 2025-26 (T-4) ...
17.05 MW
Barnfield Road Swindon SN2 2DJ (2 components)

A new power plant, with associated civil works, switchgear and electrical connection. (2)

Inactive • 2021-22 (T-4), 2020-21 (T-4)
Barleylands Barleylands Road Billericay Essex CM11 2UD (1 component)

A 49.400 MW / 98.800 MWh battery energy storage system

Active • 2026-27 (T-4)
11.67 MW
Baglan Energy Park, Briton Ferry, Port Talbot, SA11 2GA (3 components)
• New build one-hour duration storage to replace diesel plant (2)
• One-hour duration Battery Storage Plant.
Active • 2025-26 (T-4), 2024-25 (T-1) ...
Back Lane, Chesterfield, S44 5XQ (8 components)
• A Battery Energy Storage System. (2)
• 10 x 1mw Battery Storage units to be installed on designated land at Back Lane - Connection offer is for …
Active • 2024-25 (T-4), 2023-24 (T-4) ...
B970, Boat of Garten, Highland, Scotland, PH24 3BY, United Kingdom (1 component)

New build 49.9MW / 99.8MWh battery energy storage system

Active • 2027-28 (T-4)
4.62 MW
Aylesford BES Site Old Church Road Burham Kent ME20 7PA (2 components)

29MW Battery Storage located at Aylesford. (2)

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Loading map...
Showing 25 locations