Storage
1265 unique locations (3870 components) - Page 49 of 51
Auchteraw Farm, Fort Augustus, PH32 4BT (4 components)
Atcost Road, Barking Riverside, London, England, IG11 0EQ (1 component)
Battery energy storage system
Askern CMM Generation, Campsall Road, Askern, Doncaster DN6 0BZ (4 components)
Ashorne Solar, Chesterton Fields Farm, Fosse Way, Ashorne Hill, CV33 9JY (1 component)
Battery Storage
Ashley Clinton Estate, Milford-on-Sea, Lymington, SO41 0LA (1 component)
A standalone 0.949MW BESS connected directly to the DNO network
Ashlett Creek, Fawley, Hampshire, SO45 1DT (1 component)
New Build CMU comprising of battery storage and associated plant
Ash Lane, Bramley, Little London, Basingstoke and Deane, Hampshire, RG26 5FL, United Kingdom (1 component)
New build 49.995MW / 99.990MWh battery energy storage system.
Ashbourne Airfield Site opposite to hanger 4 Ashbourne Airfield Industrial Estate Blenheim Road Ashbourne DE6 1HA (1 component)
5 MW Storage facility located at Ashbourne Airfield.
Arreton Valley Nusery, Hale Common, Arreton, Newport, Isle of Wight, PO30 3AR (1 component)
The CMU component will have a connection capacity of 2.52MW. BYD Battery
Arran View Jameston Farm Dalry North Ayrshire KA24 4EY (1 component)
13 x 3.800MW / 7.491MWh storage units installed on designated land within a brownfield site at Jameston Farm, Dalry, North Ayrshire, KA24 4EY
Ardochrig Substation, off Ardochrig Road, Whitelee Windfarm, South Lanarkshire, G75 0QN (4 components)
Ardencaple Farm, Rhu, Helensburgh, Argyll & Bute, G84 8JX (1 component)
A 50MW Distribution Connected Battery Energy Storage System
Arbroath Battery, East Muirlands Road, Arbroath, DD11 2QH (8 components)
A Pumping Station On The North East Side Of Pigeon Lane Fornham All Saints IP28 6JP (1 component)
CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network
Anglian Water Services Limited, Pineham, Milton Keynes, MK15 9PA (2 components)
CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (2)
Amersham Road Denham Buckinghamshire SL9 7AW (5 components)
A new power plant, with associated civil works, switchgear and electrical connection. (3)
Ambulance Station Queen Margaret's Road Scarborough YO11 2YH (1 component)
20 MW Storage facility located at Scarborough.
Altcar Training Camp Grange Road Ince Blundell, L38 7JE (2 components)
Battery Energy Storage System (2)
Aldon Road, Poulton - Le - Fylde, Lancashire FY6 8JL (2 components)
Albion Road, Dartford, Kent, UK, DA1 5PZ (6 components)
Albion Road, Dartford, Kent, DA1 5PZ (6 components)
battery storage (3)
Albion Road, Dartford DA1 5PS (2 components)
The CMU will be formed of multiple individual storage units controlled centrally and exporting to the distribution system. (2)
Albion Close, Worksop, S80 1RA (2 components)
Battery energy storage unit (2)
Airdrie WWTW, Sheepford, Cambroe, North Lanarkshire, ML5 4PZ (1 component)
45MW/45MWh BESS