Storage
1265 unique locations (3696 components) - Page 5 of 51
Two Parcels Of Land Lying To The North West And South West Of Farm Road, Brackley NN13 7EB (2 components)
CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (2)
Twibell Street, Barnsley S71 1JE (2 components)
The CMU will be formed of multiple individual storage units controlled centrally and exporting to the distribution system. (2)
Trow Green Farm, Trow Green, St Brevials, GL15 6QP (3 components)
The CMU component at Trow Green Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 10 MW export capacity and an import capacity of … (3)
Trent Basin Nottingham NG2 4DS (2 components)
A 0.5MW Lithium Ion Battery based in Nottingham (2)
Tredington Fields Farm, Claydon Solar B, Tredington, Tewkesbury, GL20 7BS (2 components)
Battery Storage (2)
Traston Road, Newport, NP19 4PW (1 component)
A 18MW distribution connected energy storage plant comprising of batteries
Transport Yard, Parsonage Street, Oldbury, B69 4PH (4 components)
Todrig Farm Coldstream TD12 4JA (5 components)
A new battery storage system comprising batteries, containers, inverters, control systems and associated balance of plant. This will be constructed on agricultural land to the west of Eccles Substation and … (2)
Toddington Road, Harlington, Central Bedfordshire, England, LU5 6LD, United Kingdom (1 component)
The proposed battery plant would consist of a number of new highly efficient battery storage units plus ancillary equipment.
Titchfield Lane, Wickham, Fareham PO15 6DY (3 components)
CMU component consisting of a battery cell for electricity storage connected at Titchfiled Lane. New building BESS(Battery Energy Storage System) (3)
TIR John North Road, St Thomas, Swansea, SA1 7BG / SA1 8NZ (1 component)
New build one-hour duration storage to replace diesel plant
TIR John North Road, St Thomas, Swansea, SA1 7BG (2 components)
Timsbury Manor, Romsey SO51 0NE (1 component)
Lithium ion battery operating as a power plant. Change of use from redundant quarry.
Tiln Farm, Tiln Lane, Retford, Nottinghamshire, DN22 9JH (1 component)
A 25MW/25MWh Storage: minimum 1.0 hour duration battery facility which will share a future connection agreement with a future solar farm but electrically separate with its own independent Import and …
Tiln Farm BESS, Tiln Lane, Retford DN22 9JH (4 components)
Tillingdown Lane, Caterham, CR3 7JA (2 components)
Tiddlywink Yatton Keynell Chippenham Wiltshire SN14 7BY (1 component)
New Build Generating CMU comprising of a battery storage asset
Tickhill Road, Maltby, S66 7QR (1 component)
New Build CMU comprising of battery storage and associated plant
Thrybergh Weir Kilnhurt Mexborough South Yorkshire S64 5TJ (3 components)
1.200MW BESS (3)
Thrybergh Weir Kilnhurst Mexborough South Yorkshire S64 5TJ (7 components)
Three Cocked Hat Plantation Waplington Lane Allerthorpe East Riding Of Yorkshire (No post code, see cover letter) (1 component)
BESS project to be installed within a future Greener Grid Park.
Three Cocked Hat Plantation Waplington Lane Allerthorpe East Riding Of Yorkshire (No post code see cover letter) (1 component)
49MW 4 hr BESS
Thorpe Marsh Ash Fields, Ash Fields Road, off Marsh Lane, Thorpe in Balne/Barnby Dun, Doncaster, DN6 0EA (2 components)
New-build generating CMU comprising battery storage and associated plant to be constructed on brownfield land at Thorpe Marsh, Yorkshire. Metering of output is Net of auxillary load.
Thorpe Marsh Ash Fields Ash Fields Road off Marsh Lane Thorpe in Balne/Barnby Dun Doncaster DN6 0EA (10 components)
New-build generating CMU comprising battery storage and associated plant to be constructed on brownfield land at Thorpe Marsh, Yorkshire. Metering of output is Net of auxillary load.
Thornton Greener Grid Park, Thornton, Melbourne, York, YO42 4RZ (2 components)
BESS project to be installed within a future Greener Grid Park. (2)