Two Parcels Of Land Lying To The North West And South West Of Farm Road, Brackley NN13 7EB (2 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (2)

Active • 2028-29 (T-4), 2025-26 (T-1)
0.16 MW
Twibell Street, Barnsley S71 1JE (2 components)

The CMU will be formed of multiple individual storage units controlled centrally and exporting to the distribution system. (2)

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Trow Green Farm, Trow Green, St Brevials, GL15 6QP (3 components)

The CMU component at Trow Green Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 10 MW export capacity and an import capacity of … (3)

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Trent Basin Nottingham NG2 4DS (2 components)

A 0.5MW Lithium Ion Battery based in Nottingham (2)

Inactive • 2021-22 (T-4), 2018-19 (T-1)
3.46 MW
Traston Road, Newport, NP19 4PW (1 component)

A 18MW distribution connected energy storage plant comprising of batteries

Active • 2025-26 (T-4)
Transport Yard, Parsonage Street, Oldbury, B69 4PH (4 components)
• Diesel and/or gas reciprocating engines. (2)
• Battery Storage Facility
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Todrig Farm Coldstream TD12 4JA (5 components)

A new battery storage system comprising batteries, containers, inverters, control systems and associated balance of plant. This will be constructed on agricultural land to the west of Eccles Substation and … (2)

Active • 2028-29 (T-4), 2027-28 (T-4)
148.15 MW
Toddington Road, Harlington, Central Bedfordshire, England, LU5 6LD, United Kingdom (1 component)

The proposed battery plant would consist of a number of new highly efficient battery storage units plus ancillary equipment.

Active • 2027-28 (T-4)
92.03 MW
Titchfield Lane, Wickham, Fareham PO15 6DY (3 components)

CMU component consisting of a battery cell for electricity storage connected at Titchfiled Lane. New building BESS(Battery Energy Storage System) (3)

Active • 2027-28 (T-4), 2025-26 (T-1) ...
21.23 MW
TIR John North Road, St Thomas, Swansea, SA1 7BG / SA1 8NZ (1 component)

New build one-hour duration storage to replace diesel plant

Inactive • 2023-24 (T-1)
TIR John North Road, St Thomas, Swansea, SA1 7BG (2 components)
• New build one-hour duration storage to replace diesel plant
• One Hour Duration Battery Storage Plant
Active • 2025-26 (T-4), 2024-25 (T-1)
Timsbury Manor, Romsey SO51 0NE (1 component)

Lithium ion battery operating as a power plant. Change of use from redundant quarry.

Inactive • 2022-23 (T-4)
Tiln Farm, Tiln Lane, Retford, Nottinghamshire, DN22 9JH (1 component)

A 25MW/25MWh Storage: minimum 1.0 hour duration battery facility which will share a future connection agreement with a future solar farm but electrically separate with its own independent Import and …

Active • 2025-26 (T-4)
Tiln Farm BESS, Tiln Lane, Retford DN22 9JH (4 components)
• Tiln Farm BESS is a 25MW 2-hour storage project built alongside a new solar farm at Tiln Farm. (2)
• Tiln Farm BESS is a 25MW 2-hour storage project built alongside a new solar farm at Tiln Farm. It is …
Active • 2028-29 (T-4), 2027-28 (T-4) ...
14.18 MW
Tillingdown Lane, Caterham, CR3 7JA (2 components)
• A 12MW Distribution Connected Battery Energy Storage System
• A Distribution Connected Battery Energy Storage System
Active • 2028-29 (T-4)
7.52 MW
Tiddlywink Yatton Keynell Chippenham Wiltshire SN14 7BY (1 component)

New Build Generating CMU comprising of a battery storage asset

Inactive • 2021-22 (T-4)
Tickhill Road, Maltby, S66 7QR (1 component)

New Build CMU comprising of battery storage and associated plant

Active • 2025-26 (T-4)
Thrybergh Weir Kilnhurt Mexborough South Yorkshire S64 5TJ (3 components)

1.200MW BESS (3)

Active • 2027-28 (T-4), 2026-27 (T-4) ...
0.14 MW
Thrybergh Weir Kilnhurst Mexborough South Yorkshire S64 5TJ (7 components)
• 1.200MW Battery Energy Storage System (2)
• 1.200 MW of demand reduction
Active • 2025-26 (T-4), 2024-25 (T-4) ...
Three Cocked Hat Plantation Waplington Lane Allerthorpe East Riding Of Yorkshire (No post code, see cover letter) (1 component)

BESS project to be installed within a future Greener Grid Park.

Active • 2027-28 (T-4)
31.13 MW
Thorpe Marsh Ash Fields, Ash Fields Road, off Marsh Lane, Thorpe in Balne/Barnby Dun, Doncaster, DN6 0EA (2 components)

New-build generating CMU comprising battery storage and associated plant to be constructed on brownfield land at Thorpe Marsh, Yorkshire. Metering of output is Net of auxillary load.

Active • 2027-28 (T-4)
86.18 MW
Thorpe Marsh Ash Fields Ash Fields Road off Marsh Lane Thorpe in Balne/Barnby Dun Doncaster DN6 0EA (10 components)

New-build generating CMU comprising battery storage and associated plant to be constructed on brownfield land at Thorpe Marsh, Yorkshire. Metering of output is Net of auxillary load.

Active • 2028-29 (T-4)
584.36 MW
Thornton Greener Grid Park, Thornton, Melbourne, York, YO42 4RZ (2 components)

BESS project to be installed within a future Greener Grid Park. (2)

Active • 2028-29 (T-4), 2025-26 (T-1)
88.23 MW