Storage

1265 unique locations (3870 components) - Page 50 of 51

Aikengall 2a Wind Farm Innerwick EH42 1SG (2 components)

New Build Battery Energy Storage System. To be connected at WesterDod 132kV substation. (2)

Active • 2027-28 (T-4), 2024-25 (T-1)
6.70 MW
Adswood Road, Cheadle Hulme, Stockport, Greater Manchester, SK8 5QY (3 components)

New Build CMU comprising of battery storage and associated plant (2)

Active • 2028-29 (T-4), 2027-28 (T-4)
32.77 MW
Adjacent To St Philip's Marsh Depot, Land Off, Feeder Road, Bristol, BS2 0TH (12 components)

The CMU will be an energy storage system comprised of batteries and will have import and export capacity of 20.000MW each. (3)

Active • 2026-27 (T-4), 2025-26 (T-4) ...
9.80 MW
adjacent to National Grid Stalybridge substation SK15 3DA (3 components)
• 150MW battery storage located near to the National Grid Stalybridge substation, split into two BMU's
• 75MW battery storage located near to the National Grid Stalybridge substation.
Active • 2027-28 (T-4), 2026-27 (T-4)
58.53 MW
adjacent to Kilmarnock South Substation KA1 3TN (12 components)

Lithium ion battery storage plant (2)

Active • 2026-27 (T-4), 2025-26 (T-1)
150.05 MW
adjacent to Kilmarnock South Substation KA1 3TN (2 components)
• 200MW battery storage located near to the SPT Kilmarnock South substation, split into two BMU's
• 200MW battery storage located near to theSPT Kilmarnock South substation, split into two BMU's
Active • 2026-27 (T-4)
47.26 MW
Aber Park Road, Flint Flintshire CH6 5EX (2 components)

New Build CMU comprising of battery storage and associated plant (2)

Active • 2024-25 (T-4), 2021-22 (T-1)
Abbey Home Farm, Burford Road, Cirencester, GL7 5HF (1 component)

A Battery Energy Storage System

Active • 2025-26 (T-4)
A981, Fraserburgh, Aberdeenshire, Scotland, AB43 7FW, United Kingdom (1 component)

A new build 45MW / 90MWh battery energy storage system

Active • 2027-28 (T-4)
4.16 MW
72-77 Lower Tower Street, Hockley, Birmingham, B19 3NF (1 component)

New build battery storage

Active • 2028-29 (T-4)
8.90 MW
60-70 Reach Road Burwell CB25 0AH (3 components)
• 10MW of onshore wind generation
• 40MW of solar generation covering lower Portland Farm and land off Newnam Drove.
• 49.900MW storage installation
Active • 2024-25 (T-4)
5 Foxwood Rd, Chesterfield, S41 9RA (2 components)

Battery energy storage unit (2)

Active • 2028-29 (T-4), 2025-26 (T-1)
0.69 MW
0.69 MW
4 Redcote Lane Kirkstall Leeds LS4 2 AL (1 component)

50 MW battery generation system, Leeds.

Inactive • 2021-22 (T-4)
35 Arkwright Road, Astmoor, Runcorn, WA7 1NU. (2 components)

The batteries are housed within racks and installed, together with converters, inside an existing building. The batteries will be installed in the racks off-site and then delivered to site ready … (2)

Inactive • 2022-23 (T-4), 2021-22 (T-4)
35-37 Sheffield Road, Newton, Hyde, SK14 2PU (5 components)
• Grid-scale energy storage system based on Lithium Ion, capable of exporting 42MW for a 1 hour duration installed on designated …
• Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours
• New Build 2.5 Hour Battery Storage Plant.
Active • 2026-27 (T-4), 2025-26 (T-4) ...
22.03 MW
350 Petre Street Sheffield S4 8LU (10 components)
• New build battery. (2)
• New build battery
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
34 Bochum Parkway Sheffield S8 8JR (1 component)

22 MW Storage facility located at Sheffield.

Inactive • 2021-22 (T-4)
34 Bochum Parkway, S8 8JR (1 component)

A Distribution Connected Battery Energy Storage System

Active • 2027-28 (T-4)
3.08 MW
33 Oxford Road Yeovil BA21 5HR (6 components)
• New build battery (2)
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Inactive • 2021-22 (T-4), 2020-21 (T-4)
322 Broomloan Rd, Glasgow G51 2JQ (1 component)

A 50MW Distribution Connected Battery Energy Storage System

Active • 2028-29 (T-4)
10.47 MW
288 And 290 Hillgrounds Road Kempston Bedford MK42 8SZ (1 component)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2028-29 (T-4)
0.05 MW
2-6 Judds Lane, Coventry, West Midlands, CV6 6AQ (5 components)
• Battery Storage Facility
• Diesel and/or gas reciprocating engines.
• Gas reciprocating engines.
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Loading map...
Showing 25 locations