Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Storage

944 unique locations (3108 components) - Page 6 of 38

Coity Road, Bridgend, CF31 1NN (1 component)

New Build CMU comprising of battery storage and associated plant

Active • 2025-26 (T-4)
Comhampton Lane, Stourport-on-Severn, DY13 9ST (1 component)

New Build CMU comprising of battery storage and associated plant

Active • 2027-28 (T-4)
3.62 MW
Common Farm Bookers Lane Dinnington Sheffield S25 1ZX England (1 component)

AC coupled lithium Battery Energy Storage System with associated infrastructure.

Active • 2028-29 (T-4)
6.86 MW
Common Lane, Wath upon Dearne, Rotherham, South Yorkshire, S63 7DX (5 components)
• Battery energy storage unit (2)
• New reciprocating genset in acoustic enclosure
Active • 2028-29 (T-4), 2025-26 (T-1) ...
0.69 MW
Cooklands farm, Old Snydale, Pontefract, WF7 6HA (1 component)

A 50MW Distribution Connected Battery Energy Storage System

Active • 2028-29 (T-4)
10.47 MW
County Hall, Topsham Road, Exeter EX2 4QD (1 component)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2028-29 (T-4)
0.05 MW
Cowley Substation Blackberry Lane Garsington Oxfordshire OX44 9BD (1 component)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.

Active • 2028-29 (T-4)
4.01 MW
Cowley Substation Blackberry Lane Garsington Oxfordshire OX44 9BD (9 components)
• The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation. (2)
• The CMU is a electro-chemical Lithium-ion battery storage system connected to the transmission system at the National Grid Transmission Substation.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
12.22 MW
Coxhall Power, Coxhall Road, Tattingstone, Ipswich, IP9 2NH (2 components)
• CMU component consisting of multiple battery cells for electricity storage @ 11kV and the supply of electricity to the 11kV …
• CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid
Active • 2027-28 (T-4), 2026-27 (T-4)
2.28 MW
Craigie, South Ayrshire, Scotland, KA1 5JT (3 components)

A 175MW New Build Battery Storage Site Component

Active • 2027-28 (T-4)
60.48 MW
CryoBattery One Limited, 134 Manchester Road, Carrington, M31 4AY (2 components)
• The CRYOBattery? is the world?s first commercial-scale Cryogenic Energy Storage system. The technology uses surplus electricity to condense atmospheric air …
• The project is the world?s first commercial-scale Liquid Air Energy Storage (LAES) system. The technology uses surplus electricity to condense …
Active • 2028-29 (T-4), 2025-26 (T-4)
31.27 MW
Dadglow Farm, Bishops Itchington, Southam, CV47 2SW (1 component)

A 20MW Distribution Connected Battery Energy Storage System

Active • 2028-29 (T-4)
4.19 MW
Dairy Lane Westhamnett Chichester PO20 2BG (7 components)

4MW battery co-located with a solar farm (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
1.10 MW
Danks Wy, Golds Hill, West Bromwich, Tipton, DY4 7BT (1 component)

99.4MW / 99.4MWh BESS

Active • 2026-27 (T-4)
11.74 MW
DB Cargo, Toton, Nottingham, NG10 1HA (1 component)

New Build CMU comprising of battery storage and associated plant

Active • 2027-28 (T-4)
2.24 MW
Deep Lane BESS, Plympton, Devon, PL7 5AA (3 components)

New Build CMU comprising of battery storage and associated plant (2)

Active • 2028-29 (T-4), 2027-28 (T-4)
6.60 MW
Deeside Power Station Zone 4 Weybridge Road Deeside Industrial Park Flintshire CH5 2UL (2 components)
• Gas Reciprocating Engines
• Grid Scale Battery Energy Storage.
Active • 2028-29 (T-4)
53.91 MW
Dellsome Power, Hatfield Grid Station, Dellsome Lane, Colney Heath, St. Albans, AL4 0QT (3 components)
• CMU component consisting of multiple battery cells for electricity storage @ 11kV and the supply of electricity to the 11kV … (2)
• CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid
Active • 2027-28 (T-4), 2025-26 (T-1) ...
3.68 MW
Denmead Farm Edneys Lane Denmead Waterlooville Hampshire PO7 6JN (1 component)

A 49.400 MW / 98.800 MWh battery energy storage system

Active • 2026-27 (T-4)
11.67 MW
Derehams Lane, Loudwater, High Wycombe, HP10 9RW (1 component)

40 MW/40MWh BESS located on an existing farm in Buckinghamshire, England

Active • 2025-26 (T-4)
Dersalloch Windfarm, Ayr, KA6 7JJ (1 component)

1 x 30MW Lithium-ion battery with duration of 1 hour

Active • 2026-27 (T-4)
3.54 MW
Dig Gate Lane, Lady House, Milnrow, Rochdale, Greater Manchester, England, OL16 4NR (2 components)
• A Distribution Connected Battery Energy Storage System.
• A Distribution Connected gas fueled generating station.
Active • 2028-29 (T-4)
10.40 MW
Dinorwig Power Station, Llanberis, Caernarfon, LL55 4TY (80 components)
• BM unit T_DINO-1 at Dinorwig Power Station (Pumped Storage)
• BM unit T_DINO-2 at Dinorwig Power Station (Pumped Storage)
• BM unit T_DINO-3 at Dinorwig Power Station (Pumped Storage)
Active • 2028-29 (T-4), 2027-28 (T-4) ...
3416.01 MW
Loading map...
Showing 25 locations