Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Storage

1265 unique locations (3697 components) - Page 6 of 51

Bumpers Farm, Ilmer Lane, Ilmer, Buckinghamshire, HP27 9RE (1 component)

New 49.5MW Battery Energy Storage system

Active • 2025-26 (T-4)
Burton Enterprise Park Hawkins Lane Burton upon Trent Staffordshire DE14 1QG (1 component)

Grid scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration

Active • 2028-29 (T-4)
5.24 MW
Burton Green Farm, Hobs Lane, Kenilworth, Warwickshire, CV8 1QB (2 components)

New Build CMU comprising of battery storage and associated plant (2)

Active • 2028-29 (T-4), 2027-28 (T-4)
27.04 MW
Callywhite Lane Dronfield Sheffield S18 2XR (1 component)

18 MW Storage facility located at Dronfield, Sheffield.

Inactive • 2021-22 (T-4)
Calow Green, Calow, North East Derbyshire, S44 5XQ (8 components)

A stand alone Battery Energy Storage System. (2)

Active • 2028-29 (T-4), 2027-28 (T-4)
53.52 MW
53.16 MW
Camilla Farm, Auchtertool, Kircaldy, Fife, KY2 5XW (2 components)
• Battery storage facility with 49.950MW interconnected capacity for both export and import
• Battery storage facility with 49MW interconnected capacity for both export and import
Inactive • 2021-22 (T-4), 2020-21 (T-4)
8.87 MW
Camsiscan Farm, Craigie, South Ayrshire, Scotland, KA1 5JT (4 components)
• An 87.500 MW Battery Storage Site Component.
• An 87.500 MW New Build Battery Storage Site Component
• An 87.500 MW New Build Battery Storage Site Component.
Active • 2028-29 (T-4)
55.20 MW
Capenhurst Lane Cheshire CH66 2NT (1 component)

A 99.8MW battery storage system comprising approx 13 skids, to be installed at Capenhurst Lane

Active • 2025-26 (T-4)
Carlton, Stockton-on-Tees, TS21 1EA (9 components)

Battery storage located at Carlton, Stockton-on-Tees, TS21 1EA with a nameplate capacity of 1.200 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU over 3 … (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
0.20 MW
Carnegie Road, Liverpool L13 7HY (1 component)

The CMU comprises Lithium Ion batteries housed in ISO containers with additional containers used to house the converters.

Active • 2024-25 (T-4)
Carnegie Road, Liverpool, L13 7HY (1 component)

The CMU comprises lithium ion batteries housed in ISO containers used to house the converters

Active • 2025-26 (T-1)
1.36 MW
Carnegie Road, Liverpool, L13 7HY. (3 components)

The CMU comprises Lithium Ion batteries housed in ISO containers with additional containers used to house the converters. (3)

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
9.93 MW
Castlebridge, Alloa, Clackmannanshire, FK10 3QA (1 component)

The CMU component at Castelbridge is an energy storage system comprised of batteries and will have an import and export capacity of 5MW.

Inactive • 2021-22 (T-4)
Castlelaurie Industrial Estate, Bankside, Falkirk FK2 7XF (1 component)

New build battery storage

Active • 2028-29 (T-4)
7.66 MW
Castle Sports Complex, Albion Street, PE11 2AJ (1 component)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2028-29 (T-4)
0.05 MW
Loading map...
Showing 25 locations