Storage
944 unique locations (3108 components) - Page 6 of 38
Stevensons Farm, Arterial Road, Nevendon, Essex SS14 3JH (9 components)
Lithium Ion battery storage system capable of charging, storing and discharging electricity. Land at Stevensons Farm, Arterial Road, Nevendon, Essex SS14 3JH. (3)
Stevenage Electric Forecourt Knebworth Stevenage SG1 2AX (3 components)
6.000MW Battery Energy Storage System to be installed at Stevenage Electric Forecourt (2)
Stephenson Road, Colchester Business Park, CO4 9QP (2 components)
CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (2)
Steam Lane, Avonmouth industrial Estate, Bristol, BS11 0YT (3 components)
20 x 1.1MWh battery modules connected to provide 10MW max instantaneous output and 20MWh energy output per day. All batteries are class [XX]. (2)
Staythorpe BESS, Staythorpe Road, Nottinghamshire, NG23 5RE (1 component)
The CMU is a Battery Energy Storage System with a planned 437MW active power output, consisting of containerised batteries.
Station Road, Southfleet, Dartford, Kent, England, DA13 9PA, United Kingdom (1 component)
The proposed battery plant would consist of a number of new highly efficient battery storage units plus ancillary equipment.
Station Rd, Clowne, Chesterfield S43 4AB (2 components)
CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (2)
Star Inn Farm, Land off the Main Street, Invergowrie, Perth and Kinross, Scotland, DD2 5EG, United Kingdom (1 component)
2 hour Battery Energy Storage System
Stammery Hill, Sector, Axminster, East Devon, Devon, England, EX13 5UH, United Kingdom (1 component)
The proposed power plant would consist of a number new highly efficient lithium-ion battery units plus ancillary equipment. Each genset is based on advanced battery technology.
Spring Lane, Gedling, Nottinghamshire, NG4 4PD (1 component)
New Build Storage Facility
Speke Hall Avenue, Speke, Liverpool, L24 8DA (3 components)
South West side of the A444, Castle Gresley, DE11 9ES (1 component)
Battery energy storage system, together with associated equipment, infrastructure and ancillary works.
South Side Of West Thurrock Way, Lakeside Trading Estate, Grays. RM20 3WE (1 component)
CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network
South Pargillis, Clockluine Road, Hillend, Dunfermline, KY11 7HS (1 component)
Battery storage station
SOUTH OF NATIONAL GRID IVER SUBSTATION, SLOUGH ROAD, IVER HEATH UB8 2FX (1 component)
The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.
South of Carnegie Road, Liverpool, L13 3AT (1 component)
New build battery storage
Southmoor Lane, Havant, Hampshire, PO9 1JW (1 component)
New Build Generating CMU comprising of battery storage and associated plant.
South Fambridge Hall Solar Farm Fambridge Road, South Fambridge, Rochford, SS4 3LS (1 component)
20MW/40MWh of Lithium Iron Battery Electric Storage System, comprising 6 storage containers, and associated metering, switchgear and electrical infrastructure. the Battery will be its own BMU and will be co-located …
South East of Norwich Substation, Ipswich Road, Stoke Holy Cross, South Norfolk, Norfolk, England, NR14 8PQ (1 component)
The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.
South Camberley Adult Learning Centre, France Hill Drive, Camberley, GU15 3QA (1 component)
CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network
SNARLTON LANE, SNARLTON LANE, MELKSHAM, SN12 7QP (1 component)
1 hour Lithium-ion battery storage facility in Melksham, Wiltshire going to be connected to Sandridge 132/33 kV substation with a connection capacity of 49.9MW
Snarlton Farm Battery Snarlton Lane Melksham SN12 7QP (2 components)
Smithyard Lane, Williton, TA4 4NN (3 components)
New Build CMU comprising of battery storage and associated plant (2)
Smithyard Lane, Watchet, TA4 4NN (1 component)
New Build CMU comprising of battery storage and associated plant