Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Storage

1265 unique locations (3696 components) - Page 6 of 51

The Wagon Hovel, The Borrows, Sibthorpe, Newark, NG23 5LU (1 component)

A 2 hour BESS connecting directly to the DNO network.

Active • 2025-26 (T-1)
0.26 MW
The Street, Hacheston, Woodbridge, Suffolk, UK, IP13 9ND (6 components)
• A 50MW New Build Battery Storage site (2)
• Existing 50MW Battery Storage site
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
The Street, Hacheston, IP13 9ND (4 components)

battery storage (2)

Battery Storage HC ESS3 LIMITED Not Prequalified IP13
Inactive • 2021-22 (T-4), 2018-19 (T-1)
The Site Of And Unit 11 Anson Close, Pyson'S Road Industrial Estate, Broadstairs, CT10 2YC (1 component)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2028-29 (T-4)
0.05 MW
The Research Centre, Parc Stormy, Stormydown, Bridgend, CF33 4RS (2 components)

4MW BESS (2)

Inactive • 2021-22 (T-4), 2018-19 (T-1)
The Quarry, Timsbury Manor, Manor Lane, Timsbury,Hampshire SO510NE (2 components)

0.9MW Battery storage located at Hampshire (2)

Battery Storage LIMEJUMP LTD Not Prequalified SO5
Inactive • 2021-22 (T-4), 2018-19 (T-1)
The Phoenix Centre, Beaumont Road, Banbury, OX16 1RH (1 component)

Battery Energy Storage System

Inactive • 2022-23 (T-4)
The Manorway, Stanford-leHope, SS17 9LL (5 components)
• A gas fuelled generating station (2)
• A Battery Energy Storage System
Active • 2025-26 (T-4), 2024-25 (T-1)
The Manorway, Stanford-le-Hope, SS17 9LL (3 components)
• A Battery Energy Storage System (2)
• Reciprocating engines of 6 mW.
Active • 2027-28 (T-4), 2026-27 (T-4) ...
2.74 MW
The Manorway, Stanford-le-Hope, Essex SS17 9LP (11 components)

A new battery storage system comprising batteries, containers, inverters, control systems and associated balance of plant. This will be constructed on brownfield land in Stanford-Le-Hope, Essex. Metering of output is … (3)

Active • 2026-27 (T-4), 2025-26 (T-4) ...
30.72 MW
Thelwall Lane, Warrington, WA4 1PD (2 components)

The CMU will be formed of multiple individual storage units controlled centrally and exporting to the distribution system.

Inactive • 2018-19 (T-1)
the land to the south west of Middleton Road, Middleton, Morecambe extending to approximately 3 acres (1 component)

75.00 MW of Battery Energy Storage Units with associated infrastructure.

Active • 2025-26 (T-4)
The land South-West of the Dunoon Electrical Substation located on Ardnadam Farm, Sandbank, Dunoon, Argyll and Bute, PA23 8PN (2 components)

Battery energy storage system, together with associated equipment, infrastructure and ancillary works. (2)

Active • 2027-28 (T-4), 2024-25 (T-1)
5.23 MW
The land at Rownall Hall Farm, Rownall Road, Wetley Rocks, Stoke-on-Trent, ST9 0BS (1 component)

Battery energy storage facility with a 2 hour duration and a maximum capacity of 300MW, located in Stoke.

Active • 2027-28 (T-4)
31.54 MW
The land adjacent to the electricity sub-station off Green Lane Thurcroft S66 9JD (2 components)

50 MW Storage facility located at Thurcroft. (2)

Inactive • 2021-22 (T-4), 2018-19 (T-1)
The Hollies Croft Skegness Lincolnshire PE24 4SH (1 component)

20MW-40MWh Battery Energy Storage system. Number of Inverters/skid: 6 x 3950kVA UP-XT/MVPS 4600S2 @ 25C Number of Electric combiner Box: 12 Number of battery box: 24

Active • 2025-26 (T-4)
The fields close to the Land at Little Hale Drove, Sleaford, NG34 9BG, United Kingdom (1 component)

LHBESS (CMU) is a new build generating 49.995MW / 99.990MWh battery storage system (BESS).

Active • 2028-29 (T-4)
6.28 MW
The fields close to The Cottage, The Priory, Priory Lane, Little Wymondley, Hitchin, SG4 7HD (1 component)

WYBESS (CMU) is a new build generating 49.995MW / 99.990MWh battery storage system (BESS).

Active • 2028-29 (T-4)
6.28 MW
The Emirates Stadium, Hornsey Rd, London N7 7AJ (4 components)
• Behind-the-meter battery storage system located at Emirates Stadium in London (2)
• Behind-the-meter battery storage system located at Emirates Stadium in London.
Inactive • 2021-22 (T-4), 2018-19 (T-1)
The Common, Malmesbury, Wiltshire, SN16 9RJ (10 components)
• A Battery Energy Storage System. (2)
• 10 x 1mw Battery Storage units to be installed on designated land at Church Bottom - Connection offer is for …
Active • 2024-25 (T-4), 2023-24 (T-4) ...
The Common, Malmesbury, SN16 9RJ (2 components)
• New Build CMU comprising of battery storage and associated plant
• New Build Generating CMU comprising of battery storage and associated plant.
Active • 2026-27 (T-4), 2025-26 (T-4)
7.08 MW
Thames Water Sewage Works Amersham Road Denham Buckinghamshire SL9 7AW (3 components)

A new battery storage plant, with associated civil works, switchgear and electrical connection. (2)

Active • 2024-25 (T-4), 2021-22 (T-1)
Thames Water Sewage Treatment Works Ducklington Lane Witney OX28 5JH (2 components)

A new power plant, with associated civil works, switchgear and electrical connection. (2)

Inactive • 2022-23 (T-4), 2021-22 (T-4)
104.68 MW
Templeton Farm, Birkhill, Dundee, Scotland. DD3 0QH (1 component)

A 2-hour duration containerized battery

Active • 2028-29 (T-4)
5.86 MW
Loading map...
Showing 25 locations