Storage

944 unique locations (2934 components) - Page 7 of 38

Dinorwig Power Station, Llanberis, Caernarfon, LL55 4TY (74 components)
• BM unit T_DINO-1 at Dinorwig Power Station (Pumped Storage)
• BM unit T_DINO-2 at Dinorwig Power Station (Pumped Storage)
• BM unit T_DINO-3 at Dinorwig Power Station (Pumped Storage)
Active • 2028-29 (T-4), 2027-28 (T-4) ...
3416.01 MW
Dolphingstone Farm, Cockenzie, East Lothian, EH21 8GW (1 component)

The CMU component is an energy storage system comprised of lithium ion batteries with associated infrastructure

Active • 2028-29 (T-4)
9.21 MW
Dougliehill WWTW, Port Glasgow, Inverclyde, PA15 2PB (1 component)

49MW/49MWh BESS

Active • 2026-27 (T-4)
5.79 MW
Dounreay, Thurso KW14 7RE (2 components)
• A 34MW Distribution Connected Battery Energy Storage System
• A Distribution Connected Battery Energy Storage System
Active • 2028-29 (T-4)
21.31 MW
Dragons Lane, Moston, Sandbach, CW11 3QH (2 components)

12 MW Connection 48 MWh Distribution unit (2)

Active • 2026-27 (T-4), 2023-24 (T-1)
5.50 MW
Draycott Cross Road, Cheadle, ST10 1PN (1 component)

The CMU comprises lithium ion batteries housed in ISO containers with additional containers used to house the converters

Active • 2027-28 (T-4)
4.61 MW
Drayton Manor Farm, Alcester Road, Stratford-Upon-Avon, CV37 9RG (5 components)

Battery storage located at Drayton Manor Farm, Alcester Road, Stratford-Upon-Avon, CV37 9RG with a nameplate capacity of 1.000 MW. Connection capacity is calculated as the Average Output of the Existing … (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
0.19 MW
Dunbar BESS, Dunbar, East Lothian, EH42 1RG, Scotland, UK (1 component)

Total Connection capacity of 49.99MW for Energy Storage. The component will be LFP BESS.

Active • 2028-29 (T-4)
8.17 MW
Duncombe Road, Girlington, Bradford, BD8 9AL (2 components)

New build one-hour duration storage to replace diesel plant (2)

Active • 2026-27 (T-4), 2025-26 (T-4)
1.18 MW
0.50 MW
East Tarelgin Farm, Ayr, KA6 6NF (4 components)
• 18.5MW/74MWh of BESS to be installed within a future Greener Grid Park.
• 50MW/100MWh of BESS to be installed within a future Greener Grid Park.
• BESS to be installed within a Greener Grid Park
Active • 2028-29 (T-4), 2026-27 (T-4) ...
39.02 MW
East to Sundon NG Substation Chalton Luton LU4 9UQ (1 component)

30.000 MW standalone battery energy storage project

Active • 2026-27 (T-4)
3.54 MW
Eccles Birgham Farm TD12 4LU (9 components)
• 50MW battery storage located near to the SPT Eccles substation
• 50MW battery storage located near to the SPT Eccles substation.
• Lithium ion battery storage plant
Active • 2028-29 (T-4), 2027-28 (T-4) ...
197.82 MW
Eccles Birgham Farm, TD12 4LU (2 components)
• Lithium ion battery storage plant
• Lithium ion battery storage plant.
Active • 2027-28 (T-4)
30.78 MW
Eccles Birgham Farm, TD12 4LU. (1 component)

Lithium ion battery storage plant.

Active • 2027-28 (T-4)
15.39 MW
Edwin Richards Quarry, Rowley Regis, B65 9DN (1 component)

New Build Generating CMU comprising of battery storage and associated plant.

Active • 2026-27 (T-4)
7.09 MW
Eggborough Power Station, Goole, East Yorkshire, DN14 0BS (49 components)
• New build Open Cycle Gas Turbine unit 5 at Eggborough Power Station (2)
• Battery Energy Storage System built on land at the former Eggborough Power Station (Unit 7)
Active • 2028-29 (T-4), 2027-28 (T-4) ...
2549.84 MW
Elsecar Road, Brampton Bierlow, West Melton, Rotherham, S63 6LS (3 components)

New Build Battery Storage Facility (3)

Active • 2026-27 (T-4), 2025-26 (T-1) ...
21.41 MW
Elvanfoot BESS, Leadhills Road, Elvanfoot, ML12 6TE (1 component)

circa 10MW 2hr lithium Ion battery system connected at 33kV to the SPT transmission system

Active • 2027-28 (T-4)
1.51 MW
Emmers Farm, Holt Road, BH21 7HJ (2 components)

2h-duration battery system (2)

Active • 2028-29 (T-4), 2025-26 (T-1)
15.87 MW
Exeter Science Park, Anning Road, Clyst Honiton, EX5 2FN (1 component)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2028-29 (T-4)
0.05 MW
Fairy Lane, Sale, Trafford, Greater Manchester M33 2JU (2 components)

Energy facility comprising of battery energy storage sets and ancillary equipment. (2)

Active • 2027-28 (T-4), 2026-27 (T-4)
38.98 MW
Loading map...
Showing 25 locations