Storage

1265 unique locations (3870 components) - Page 7 of 51

Catahoula Fields, Eglantine Lane, Farningham, Kent, DA4 9JL (1 component)

New Build CMU comprising of battery storage and associated plant

Active • 2027-28 (T-4)
0.68 MW
Catsbrain Farm, Stratton St Margaret, Swindon, SN3 4TD (8 components)

The CMU component at Catsbrain Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 20 MW export capacity and an import capacity of 20 … (3)

Active • 2025-26 (T-4), 2024-25 (T-4) ...
Causeway Power, The Causeway Industrial Site, Maldon, CM9 4GG (1 component)

CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid

Active • 2026-27 (T-4)
1.18 MW
Chapel Farm, Luton Road, Charlton, Luton, LU4 9UJ (7 components)

49.5 MW Battery Energy Storage facility (3)

Active • 2025-26 (T-4), 2024-25 (T-4) ...
18.33 MW
Chapelton, Fraserburgh, Aberdeenshire, Scotland, AB43 7BL (1 component)

Battery energy storage system, together with associated equipment, infrastructure and ancillary works.

Active • 2027-28 (T-4)
4.62 MW
Chesterfield Road, Sheffield, West Yorkshire, S26 4XB (3 components)

New Build CMU comprising of battery storage and associated plant (2)

Active • 2028-29 (T-4), 2027-28 (T-4)
8.62 MW
Chesterfield Road, Swallownest, Sheffield, S26 4SX (2 components)
• Gas fired reciprocating engines
• New Build Generating CMU comprising of battery storage and associated plant.
Active • 2026-27 (T-4), 2021-22 (T-4)
2.84 MW
Chickerell substation, Weymouth, Dorset, DT4 9WW (1 component)

49.9MW Lithium Ion Batteries and power conversion system installed in a compound at Chickerell Substation.

Inactive • 2023-24 (T-4)
Childerley Farm, Dry Drayton, Cambridgeshire, United Kingdom, CB23 8BA (1 component)

New build BESS alongside new build solar farm.

Active • 2028-29 (T-4)
6.20 MW
Chinley House Farm, Dolly Lane, High Peak, Stockport, SK23 7NP (1 component)

A Battery Energy Storage System

Active • 2025-26 (T-4)
Church Bottom, Salisbury, SP4 6NN (3 components)
• 10 x 1mw Battery Storage units to be installed on designated land at Church Bottom - Connection offer is for …
• 19 x 1mw Battery Storage units to be installed on designated land at Church Bottom - Connection offer is for …
• 20 x 1mw Battery Storage units to be installed on designated land at Church Bottom - Connection offer is for …
Inactive • 2022-23 (T-4)
Church Farm Solar Farm Slapton Leighton Buzzard Bedfordshire LU7 9BX (2 components)

The CMU consists of a battery energy storage system, physically co-located at the site of, but distinct from an existing solar PV generator. (2)

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Church Hill Rd, Middleton-on-the-Wolds, Driffield YO25 9UG (6 components)
• 0.250MW Battery Energy Storage System (2)
• 0.25MW of Demand Reduction
Active • 2025-26 (T-4), 2024-25 (T-4) ...
Church Road, Chelmsford, CM2 8UN (1 component)

This CMU component represents the BESS system of a co-located (solar and storage) site

Active • 2027-28 (T-4)
3.72 MW
Cirencester Solar Farm Witpit Lane Preston Cirencester GL7 5PW (To Witpit Lane entrance use GL7 5RJ) (5 components)

A 10MW/46.6MWh Battery Energy Storage System to be installed at Cirencester Solar Farm (3)

Active • 2025-26 (T-4), 2024-25 (T-1) ...
6.23 MW
4.18 MW
18.33 MW
Clay Tye Road, Upminister, RM14 3PL (7 components)

49.5MW Battery Energy Storage facility connected to 132kv network (3)

Active • 2025-26 (T-4), 2024-25 (T-4) ...
18.33 MW
Cleve Hill, Seasalter Road, Graveney with Goodnestone, Swale, Kent CT5 4BP (1 component)

A new build 230MW/460MWh battery storage facility connected to the National Grid Transmission network at 132kV, located at Cleve Hill.

Active • 2026-27 (T-4)
53.17 MW
Cleve Hill Solar Park, Seasalter Road, Graveney with Goodnestone, Swale, Kent CT5 4BP (3 components)
• A transmission connected battery storage unit
• A transmission connected solar park.
Active • 2024-25 (T-4)
Cloot Drove Peterborough PE6 0JJ (1 component)

Energy storage system providing capacity market, dynamic FFR and other balancing services.

Inactive • 2021-22 (T-4)
Loading map...
Showing 25 locations