Storage
944 unique locations (2934 components) - Page 8 of 38
Faraday Road, Plymouth, PL4 0SR (2 components)
New build one-hour duration storage to replace diesel plant (2)
Farburn?Place, Dyce, Aberdeen, AB21 7GP (2 components)
Battery Storage 2 hour duration (2)
Farr & Harris Ltd, Brassey Road, Shrewsbury, SY3 7FA (2 components)
CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (2)
Farr & Harris Ltd, Maes Y Clawdd, Maesbury Road Industrial Estate, Oswestry SY10 8NN (2 components)
CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (2)
Farr & Harris Ltd, Unit 3, Dyffryn Industrial Estate, Pool Road, Newtown, SY16 3BD (2 components)
CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (2)
Feddal Battery Storage, Land located at Feddal Estate, Braco, Dunblane, Perthshire FK15 9RA (3 components)
New Build 9.999MW capacity, 20MWh (2hr) LiFePO4 battery energy storage system (BESS). (3)
Feddal Battery Storage System, Feddal Estate, Dunblane, FK15 9RD (1 component)
9.999MW/9.999MWh greenfield BESS located approximately 3km West of Braco village, Dunblane, Scotland
Felindre Pumping Station Substation, Pant Lasau Road, Llangyfelach, Morriston, SA5 7PA (1 component)
16MW/32MWh BESS on a future Greener Grid Park.
Fell View Farm, Preston Road, Grimsargh, Preston, PR2 5SD (10 components)
Battery storage located at Fell View Farm, Preston Road, Grimsargh, Preston, PR2 5SD with a nameplate capacity of 1.200 MW. Connection capacity is calculated as the Average Output of the … (3)
Ferrybridge BESS, Knottingley, Ferrybridge, Wakefield, West Yorkshire, Yorkshire. WF11 8TB (3 components)
The CMU is a Battery Energy Storage System with a planned 150MW active power output, consisting of containerised batteries. (3)
Ferrymuir Farm, Cupar, KY15 5RW (3 components)
49.900MW one-hour duration battery energy storage facility. (3)
Ffestiniog Power Station, Tanygrisiau, Blaenau Ffestiniog, LL41 3TP (44 components)
Ffestiniog Power Station, Tanygrisiau, Blaenau Ffestiniog, LL41 3TP (39 components)
Fibden Farm, Hampton Lovett, Droitwich, Worcestershire, WR9 0NA (1 component)
New Build Storage Facility
Fiddlers Ferry BESS, Widnes Rd, Warrington WA5 2UT (2 components)
The CMU is a Battery Energy Storage System with a planned 150MW active power output, consisting of containerised batteries. (2)
Field At Grid Reference 504139 456454, Back Lane, Skerne, East Riding Of Yorkshire, YO25 8NQ (Address in planning application) Land Adjacent Driffield Supply Point, Wansford Road, Driffield (Address of grid connection) (2 components)
FORDTOWN ENERGY STORAGE, KINTORE, INVERURIE, AB51 0XJ (3 components)
49.99MW Lithium-ion Energy Storage System (3)
Forest Lane, Alne, York, YO61 1TU (1 component)
1x 2.000MW 1 hour Energy Storage System
Forkers Yard, Off Shaw Street, West Bromwich, B70 0TX (1 component)
99.4MW/99.4MWh brownfield BESS located off Shaw Street on a plot of land called Forkers Yard in West Bromwich, England
Former Cascade Works, Wellington Road, Burton Upon Trent, DE14 2AP (2 components)
Battery energy storage unit (2)
Former Sanmex Site, Land at Dalmarnock Road, Rutherglen, South Lanarkshire, G73 1NY (2 components)
Former Scrap Yard, Town Lane, Charnock Richard, Chorley, PR7 5HQ (3 components)
Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours (3)
former Teesside Power Station; Greystone Road, Grangetown, Middlesbrough, TS6 8JF (6 components)
CMU to comprise multiple individual storage units metered and despatched centrally (3)
Former Teesside Power Station; Greystone Road, Grangetown, Middlesbrough, TS6 8JF (1 component)
CMU to comprise multiple individual storage units metered and despatched centrally