Storage
1265 unique locations (3870 components) - Page 8 of 51
Coal Aston, Dronfield, S18 3AA (2 components)
Coaver, Matford Lane, Exeter EX2 4PS (1 component)
CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network
Coity Road, Bridgend, CF31 1NN (1 component)
New Build CMU comprising of battery storage and associated plant
Comhampton Lane, Stourport-on-Severn, DY13 9ST (1 component)
New Build CMU comprising of battery storage and associated plant
Commercial Road, Wolverhampton, WV1 3RD (2 components)
battery storage (2)
Common Farm Bookers Lane Dinnington Sheffield S25 1ZX England (1 component)
AC coupled lithium Battery Energy Storage System with associated infrastructure.
Common Lane, Wath upon Dearne, Rotherham, South Yorkshire, S63 7DX (5 components)
Cooklands farm, Old Snydale, Pontefract, WF7 6HA (1 component)
A 50MW Distribution Connected Battery Energy Storage System
County Hall, Topsham Road, Exeter EX2 4QD (1 component)
CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network
Cowley Substation Blackberry Lane Garsington Oxfordshire OX44 9BD (1 component)
The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.
Cowley Substation Blackberry Lane Garsington Oxfordshire OX44 9BD (9 components)
Coxhall Power, Coxhall Road, Tattingstone, Ipswich, IP9 2NH (2 components)
Craigie, South Ayrshire, Scotland, KA1 5JT (3 components)
A 175MW New Build Battery Storage Site Component
Craigton Interchange, Linburn, Bishopton, Renfrewshire, Scotland, PA7 5NT, United Kingdom (3 components)
30MW/30MWh one hour battery (3)
Crossways, Greenhithe, DA9 9BB (3 components)
CryoBattery One Limited, 134 Manchester Road, Carrington, M31 4AY (2 components)
Dadglow Farm, Bishops Itchington, Southam, CV47 2SW (1 component)
A 20MW Distribution Connected Battery Energy Storage System
Dairy Lane Westhamnett Chichester PO20 2BG (7 components)
4MW battery co-located with a solar farm (3)
Danks Wy, Golds Hill, West Bromwich, Tipton, DY4 7BT (1 component)
99.4MW / 99.4MWh BESS
Darrington Landfill Site, Darrington Leys, Cridling Stubbs, Knottingley, West Yorkshire, WF11 0AH (2 components)
Battery Storage Station
DB Cargo, Toton, Nottingham, NG10 1HA (1 component)
New Build CMU comprising of battery storage and associated plant
Deep Lane BESS, Plympton, Devon, PL7 5AA (3 components)
New Build CMU comprising of battery storage and associated plant (2)