Storage

1265 unique locations (3697 components) - Page 9 of 51

South Camberley Adult Learning Centre, France Hill Drive, Camberley, GU15 3QA (1 component)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2028-29 (T-4)
0.05 MW
SNARLTON LANE, SNARLTON LANE, MELKSHAM, SN12 7QP (1 component)

1 hour Lithium-ion battery storage facility in Melksham, Wiltshire going to be connected to Sandridge 132/33 kV substation with a connection capacity of 49.9MW

Active • 2025-26 (T-1)
5.98 MW
Snarlton Farm Battery Snarlton Lane Melksham SN12 7QP (2 components)
• 30.000MW standalone battery energy storage project
• 47.000MW standalone battery energy storage project
Active • 2026-27 (T-4), 2024-25 (T-1)
3.54 MW
Smithyard Lane, Williton, TA4 4NN (2 components)

New Build CMU comprising of battery storage and associated plant (2)

Active • 2026-27 (T-4), 2023-24 (T-1)
2.18 MW
Smithyard Lane, Watchet, TA4 4NN (1 component)

New Build CMU comprising of battery storage and associated plant

Active • 2025-26 (T-1)
3.22 MW
Slamseys Farm, Blackley Lane, Great Notley, CM77 7QW (9 components)

5MW, 1 hour/5MWh lithium-ion battery (3)

Active • 2024-25 (T-4), 2023-24 (T-1) ...
0.93 MW
Slack Lane, Westhoughton, BL5 3QH (1 component)

New Build Generating CMU comprising of battery storage and associated plant.

Active • 2026-27 (T-4)
4.25 MW
Slack Lane, Westhoughton, BL5 3LB (1 component)

New Build Generating CMU comprising of battery storage and associated plant.

Active • 2026-27 (T-4)
2.13 MW
Slack Lane, Bolton, Greater Manchester, BL5 3LJ (2 components)

New Build CMU comprising of battery storage and associated plant (2)

Active • 2028-29 (T-4), 2027-28 (T-4)
4.01 MW
41.88 MW
10.45 MW
Site 300 metres South West of Shilton Cottage, Old Greenock Road, Bishopton, PA7 5NS (2 components)

Erection of up to 16 shipping containers measuring around 16.2m x 3m x 3m electricity storage facility housing lithium-ion battery storage units, ancillary equipment and substation building. Substation building includes; … (2)

Active • 2025-26 (T-4), 2022-23 (T-4)
Sir Halley Stewart Playing Field, Winfrey Avenue, Spalding, PE11 1DA (1 component)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2028-29 (T-4)
0.05 MW
Silver Spinney Farm, Wicken Road, Wicken, MK19 6BS (11 components)
• A 5MW - 7.5MWh containerised Energy Storage System to be installed on designated land adjacent to an existing 11kV distribution … (2)
• A 5MW - 5MWh containerised Energy Storage System to be installed on designated land adjacent to an existing 11kV distribution …
Active • 2026-27 (T-4), 2024-25 (T-4) ...
1.46 MW
Shipley Road, Goffsland Farm, Shipley, Horsham, West Sussex, England, RH13 8PA, United Kingdom (1 component)

The proposed battery plant would consist of a number of new highly efficient battery storage units plus ancillary equipment.

Active • 2027-28 (T-4)
61.41 MW
Sewage Treatment Works, Stephenson Road, Colchester Business Park, CO4 9AD (2 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (2)

Active • 2028-29 (T-4), 2025-26 (T-1)
0.16 MW
Sewage Treatment Works, Lawford Lane, Writtle CM1 3EW (1 component)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2028-29 (T-4)
0.06 MW
Sewage Treatment Works, Chelmsford Road, Dunmow, CM6 1XG (2 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (2)

Active • 2027-28 (T-4), 2024-25 (T-1)
0.05 MW
Sewage Pumping Station, Worlds End Lane, Feering CO5 9PD (1 component)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2028-29 (T-4)
0.05 MW
Sewage Pumping Station, Rushbottom Lane, Benfleet SS7 4LW (2 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (2)

Active • 2028-29 (T-4), 2025-26 (T-1)
0.16 MW
Sewage Pumping Station, Rookery Lane, Lincoln LN6 7PW (1 component)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2028-29 (T-4)
0.05 MW
Sewage Pumping Station, Broad Lane, Cottenham, Cambridge CB24 8XN (1 component)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2028-29 (T-4)
0.05 MW
Severn Way, Berkeley GL13 9TN (2 components)

This CMU is formed of a battery bank and PCS capable of providing 30MW of power. The system is connected via switch gear and a transformer to the distribution network … (2)

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Sergeantlaw Farm, Sergeantlaw Road, Paisley, Renfrewshire, PA2 8UY (6 components)
• 50MW of BESS to be installed within a future Greener Grid Park. (2)
• BESS project to be installed within a future Greener Grid Park.
Active • 2028-29 (T-4), 2026-27 (T-4) ...
37.96 MW