Yorkshire Way, Armthorpe, Doncaster DN3 3GW (1 component)

Behind-the-meter battery storage system at IKEA's Doncaster distribution centre

Inactive • 2021-22 (T-4)
Yard (see map) near to 137 Netherton Street, Wishaw, ML2 0EY (2 components)

The facility consists of a lithium Ion battery storage system capable of importing, storing and exporting electricity. It connects to SPEN?s 33kV distribution network at 33kV (2)

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Woodend Farm, Bigrigg, Cumbria, CA22 2TA (5 components)

Lithium Ion battery storage system capable of importing, storing and exporting electricity. (3)

Inactive • 2020-21 (T-4), 2019-20 (T-1) ...
Withyhedge Landfill Site, Rudbaxton, Haverfordwest, Pembrokshire SA62 4DB SM 972 215 (1 component)

Battery Storage at 2.5MWh Capacity

Inactive • 2021-22 (T-4)
Whelley Hill Farm Battery Storage Scheme, Worset Lane, Hart, Hartlepool, TS27 3BH. (1 component)

A 4.8MW Battery Energy Storage System.

Inactive • 2021-22 (T-4)
West Burton Power Station, West Burton, Retford, Nottinghamshire, DN22 9BL (2 components)
• West Burton B Power Station CMU 4 [WB4C16] (New build battery storage project)
• West Burton B Power Station CMU 4 [WB4C17] (New build battery storage project)
Inactive • 2020-21 (T-4), 2018-19 (T-1)
Wellington Street, Oldham, OL4 1RL (1 component)

Battery Storage Facility

Battery Storage STOR 108 LTD Not Prequalified OL4
Inactive • 2021-22 (T-4)
Watts Lydney, 16 Mead Lane, Lydney, GL15 5EN (1 component)

The CMU component at Watts Lydney is an energy storage system comprised of Lithium-ion batteries. The system will have a 10 MW export capacity and an import capacity of 10 …

Inactive • 2021-22 (T-4)
Waters Meeting Road, Bolton, BL1 8HQ (2 components)
• Battery Storage Facility
• Energy facility comprising of reciprocating engine sets
Inactive • 2021-22 (T-4)
Valley Park Inverkip Road Greenock PA16 0AH (1 component)

18 MW storage battery located at Greenock

Inactive • 2021-22 (T-4)
Upton Lane, adjacent to Rownhams BSP Substation SO16 0XY (7 components)

10MW battery energy storage facility at Upton Lane, Rownhams (3)

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Unnamed Road Dunblane FK15 9RD (1 component)

9.999 MW Battery Storage unit located at Dunblane.

Inactive • 2021-22 (T-4)
Unit A ? Apex 30, 233-269 London Road, Stainess, TW18 4JU (2 components)

The CMU at Staines will be an energy storage facility with a maximum import and export capacity of 49.9MW. (2)

Inactive • 2022-23 (T-4), 2021-22 (T-4)
Unit 5, The Bloxwich Lane Estate, Walsall, WS2 8TF (2 components)

Battery Energy Storage System (2)

Inactive • 2021-22 (T-4), 2019-20 (T-1)
Unit 49 The Pensnett Estate, Kingswinford West Midlands DY6 7NA (1 component)

Battery Energy Storage System

Inactive • 2021-22 (T-4)
Unit 3, Wallbridge Industrial Estate, Wallbridge, Stroud, Gloucestershire, GL5 3JU (2 components)

This CMU is formed of a battery bank and PCS capable of providing in excess of 2MW of power. The system is connected via switch gear and a transformer to … (2)

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Unit 30, New York Way, New York Industrial Park, NE27 0QF (1 component)

Battery Energy Storage System

Inactive • 2021-22 (T-4)
Unit 2, Sentinel House, Enigma Business Park, WR14 1GL (2 components)

Battery Energy Storage System (2)

Inactive • 2022-23 (T-4), 2021-22 (T-4)
Unit 23B, South Gyle Crescent, Edinburgh, EH12 9EQ (1 component)

Battery Energy Storage System

Inactive • 2021-22 (T-4)
Unit 23 B, South Gyle Crescent, Edinburgh, EH12 9EQ (2 components)

Battery Energy Storage System

Inactive • 2021-22 (T-4)
Unit 1 Junction Lane, Newton-le-Willows, Merseyside, WA12 8DN. (1 component)

The batteries are housed in 1 No ISO container with an additional container used to house converters. The batteries will be installed in the containers on-site and the complete battery …

Battery Storage Shaw-Energi Ltd Not Prequalified WA12
Inactive • 2021-22 (T-4)
Unit 13 Newby Road Industrial Estate Hazel Grove Stockport SK7 5DA (1 component)

Energy storage system providing capacity market, dynamic FFR and other balancing services.

Inactive • 2021-22 (T-4)
Unit 10 Ventura Business Park Carterton OX18 1AD (1 component)

A 7MW Energy storage system located at Carterton

Inactive • 2021-22 (T-4)
Twibell Street, Barnsley S71 1JE (2 components)

The CMU will be formed of multiple individual storage units controlled centrally and exporting to the distribution system. (2)