Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

battery

8 unique locations (25 components)

Sunrise House Hulley Road Macclesfield Cheshire SK10 2LP (4 components)

20.000 MW of battery storage located at Macclesfield. (3)

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Lower Road, Brentwood, CM13 1BZ (2 components)
• Advanced battery energy storage system
• New Build Generation CMU, advanced battery energy storage system
Inactive • 2021-22 (T-4), 2019-20 (T-1)
Larport Farm Larport Lane Dormington Hereford HR1 4EP (7 components)

19.500 MW of battery storage located at Hereford. (3)

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Land North of Clayhill, Westoning, MK45 5JD. (3 components)

1.200MW of battery storage located at Westoning. (3)

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Drayton Manor Farm, Alcester Road, Stratford-Upon-Avon CV37 9RG (3 components)

0.400MW of battery storage located at Stratford-Upon-Avon. (3)

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Cleveland Potash Ltd, Boulby Mine, Loftus, Saltburn TS13 4UZ (2 components)

Purpose Build Battery designed to be compliant in the FFR market. (2)

Inactive • 2020-21 (T-4), 2017-18 (T-1)
Brook Hall Farm, North Bradley, Trowbridge, Wiltshire, BA14 9PT. (3 components)

0.800MW of battery storage located at Wiltshire. (3)

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Breach Farm Caldwell Swadlincote Derbyshire DE12 6RJ (1 component)

The CMU component at Breach Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 9.8 MW export capacity and an import capacity of 10MW.

Inactive • 2020-21 (T-4)
Loading map...
Showing 8 locations