Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

battery

432 unique locations (974 components) - Page 16 of 18

Boundary Street, Wigan WN1 3AP (6 components)

The CMU will be formed of multiple individual storage units controlled centrally and exporting to the distribution system. (3)

Inactive • 2021-22 (T-4), 2019-20 (T-1) ...
Borland Ave, Carlisle CA1 2TL (2 components)

2MW BESS (2)

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Bootle Data Centre, Bridle Road, Bootle, L30 1PH (3 components)
• two 1.4MW caterpillar generators (2)
• 11MW of 60 minute frequency response, battery storage
Inactive • 2021-22 (T-4), 2018-19 (T-1)
Bolney Substation, Wineham Lane, Bolney, Haywards Heath, BN5 9AW (1 component)

49.9mw Lithium Ion batteries and power conversion system on a compound at Bolney Substation

Inactive • 2023-24 (T-4)
Bluehouse Farm, Newton Bewley, Billingham, Durham TS22 5PW (2 components)

5.2MW of batteries across several sites (2)

Inactive • 2021-22 (T-4), 2018-19 (T-1)
BLUE HOUSE FARM DALTON BACK LANE CLAXTON BILLINGHAM DURHAM TS22 5PW (2 components)

Battery CMU - 1.2MW battery with de-rated vol of 1.043

Inactive • 2017-18 (T-1)
Blackburn Meadows Power Station, Alsing Road, Tinsley, Sheffield, S9 1HF (3 components)

A site with a 10MW, 5MWh (2C) Lithium Ion Battery system, the system is connected to the distribution network via the same connection as a nearby biomass power station. The … (3)

Inactive • 2020-21 (T-4), 2019-20 (T-1) ...
Birch Holt Farm Burton By Lincoln LN1 2RG (1 component)

The CMU component at Leverton Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 9.8 MW export capacity and an import capacity of 5MW.

Inactive • 2018-19 (T-1)
Birch Holt Farm Burton-By-Lincoln LN1 2RD (1 component)

9.8 MW Battery Storage facility

Inactive • 2019-20 (T-1)
Bicker Road Donington Spalding PE11 4XR (1 component)

Energy storage system providing capacity market, dynamic FFR and other balancing services.

Inactive • 2021-22 (T-4)
Bevercotes Energy park, West Drayton Avenue, Bevercotes, Nottinghamshire, DN22 8DP (1 component)

3 x 3 battery storage (supplied by Anesco)

Inactive • 2020-21 (T-4)
Bevercotes Energy Park, West Drayton Avenue, Bevercotes, Nottinghamshire, DN22 8DB (2 components)

3 x 1MW / 1.2 MWh BYD Lithium Ion Battery (2)

Inactive • 2020-21 (T-4), 2017-18 (T-1)
Bevercotes Energy Park, West Drayton Avenue, Bevercotes DN22 8DB (2 components)

Battery storage (2)

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Bell Farm Loders Bridport DT6 3SA (1 component)

A 5MW Energy storage system located at Bell Farm, Bridport

Inactive • 2021-22 (T-4)
Beechgrove Farm, Axminster, Devon, EX13 5TX (1 component)

The CMU component at Breechgrove Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 10 MW export capacity and an import capacity of 10 …

Inactive • 2021-22 (T-4)
Battery Storage, Keel Drive, Slough, SL1 2YA (4 components)
• A 20MW New Build Battery Storage site (2)
• A 29.5MW New Build Battery Storage site
Inactive • 2023-24 (T-4), 2022-23 (T-3)
Battery Plant, Fideoak Mill, Fideoak, Taunton, TA4 1AF (5 components)

Battery Energy Storage System (3)

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Barnfield Road Swindon SN2 2DJ (2 components)

A new power plant, with associated civil works, switchgear and electrical connection. (2)

Inactive • 2021-22 (T-4), 2020-21 (T-4)
Aylesford BES Site Old Church Road Burham Kent ME20 7PA (2 components)

29MW Battery Storage located at Aylesford. (2)

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Avely Landfill site, Sandy Lane, Aveley, South Ockendon, Essex, RM15 4XP (2 components)

1 x 1.2MW / 1.2 MWh BYD Lithium Ion Battery: at Avely Landfill site, Sandy Lane, Aveley, South Ockendon, Essex, RM15 4XP (2)

Battery LIMEJUMP LTD Not Prequalified RM15
Inactive • 2020-21 (T-4), 2017-18 (T-1)
Askern CMM Generation, Campsall Road, Askern, Doncaster DN6 0BZ (4 components)
• Battery storage (2)
• Gas fired generating units
Inactive • 2021-22 (T-4), 2018-19 (T-1)
Ashbourne Airfield Site opposite to hanger 4 Ashbourne Airfield Industrial Estate Blenheim Road Ashbourne DE6 1HA (1 component)

5 MW Storage facility located at Ashbourne Airfield.

Inactive • 2021-22 (T-4)
Arqiva Site Wychbold Nr. Droitwich Worcestershire" WR90DF (1 component)

Battery/generator UPS

Inactive • 2018-19 (T-1)
Arqiva Site THURLEIGH AIRFIELD BUSINESS PARK THURLEIGH Bedfordshire" MK442YP (1 component)

Battery/generator UPS

Inactive • 2018-19 (T-1)
Loading map...
Showing 25 locations