Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

battery

432 unique locations (974 components) - Page 2 of 18

Unit 2, Sentinel House, Enigma Business Park, WR14 1GL (2 components)

Battery Energy Storage System (2)

Inactive • 2022-23 (T-4), 2021-22 (T-4)
Unit 1, Pimbo Industrial Estate, Skelmersdale, WN8 9PR (1 component)

Battery Energy Storage System

Inactive • 2020-21 (T-4)
Unit 1 Junction Lane, Newton-le-Willows, Merseyside, WA12 8DN. (1 component)

The batteries are housed in 1 No ISO container with an additional container used to house converters. The batteries will be installed in the containers on-site and the complete battery …

Battery Storage Shaw-Energi Ltd Not Prequalified WA12
Inactive • 2021-22 (T-4)
Unit 13 Newby Road Industrial Estate Hazel Grove Stockport SK7 5DA (1 component)

Energy storage system providing capacity market, dynamic FFR and other balancing services.

Inactive • 2021-22 (T-4)
Unit 12 Burntwood Business Park Burntwood Staffordshire WS7 3XP (1 component)

Battery Energy Storage System

Inactive • 2020-21 (T-4)
Unit 10 Ventura Business Park Carterton OX18 1AD (1 component)

A 7MW Energy storage system located at Carterton

Inactive • 2021-22 (T-4)
Twibell Street, Barnsley S71 1JE (2 components)

The CMU will be formed of multiple individual storage units controlled centrally and exporting to the distribution system. (2)

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Trow Green Farm, Trow Green, St Brevials, GL15 6QP (3 components)

The CMU component at Trow Green Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 10 MW export capacity and an import capacity of … (3)

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Trent Basin Nottingham NG2 4DS (2 components)

A 0.5MW Lithium Ion Battery based in Nottingham (2)

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Transport Yard, Parsonage Street, Oldbury, B69 4PH (4 components)
• Diesel and/or gas reciprocating engines. (2)
• Battery Storage Facility
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
TIR John North Road, St Thomas, Swansea, SA1 7BG / SA1 8NZ (1 component)

New build one-hour duration storage to replace diesel plant

Inactive • 2023-24 (T-1)
Timsbury Manor, Romsey SO51 0NE (1 component)

Lithium ion battery operating as a power plant. Change of use from redundant quarry.

Inactive • 2022-23 (T-4)
Tiddlywink Yatton Keynell Chippenham Wiltshire SN14 7BY (1 component)

New Build Generating CMU comprising of a battery storage asset

Inactive • 2021-22 (T-4)
The Street, Hacheston, Woodbridge, Suffolk, UK, IP13 9ND (6 components)
• A 50MW New Build Battery Storage site (2)
• Existing 50MW Battery Storage site
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
The Street, Hacheston, IP13 9ND (4 components)

battery storage (2)

Battery Storage HC ESS3 LIMITED Not Prequalified IP13
Inactive • 2021-22 (T-4), 2018-19 (T-1)
The Site will be on the premises of Honda of the UK Manufacturing Limited (?Honda UK") located at Highworth Road, South Marston, Swindon, Wiltshire, SN3 4TZ. (1 component)

The Consortium (TEPCO and NGK) will provide the service from a Sodium Sulfur (NAS®) battery system with Power Conversion System (PCS) (rated capacity: 10MW (short-time rating: 11MW) /60MWh) and control …

Inactive • 2020-21 (T-4)
The Research Centre, Parc Stormy, Stormydown, Bridgend, CF33 4RS (2 components)

4MW BESS (2)

Inactive • 2021-22 (T-4), 2018-19 (T-1)
The Quarry, Timsbury Manor, Manor Lane, Timsbury,Hampshire SO510NE (2 components)

0.9MW Battery storage located at Hampshire (2)

Battery Storage LIMEJUMP LTD Not Prequalified SO5
Inactive • 2021-22 (T-4), 2018-19 (T-1)
The Phoenix Centre, Beaumont Road, Banbury, OX16 1RH (1 component)

Battery Energy Storage System

Inactive • 2022-23 (T-4)
The Pensnett Estate, Kingswinford West Midlands DY6 7NA (1 component)

Battery Energy Storage System

Inactive • 2020-21 (T-4)
Thelwall Lane, Warrington, WA4 1PD (2 components)

The CMU will be formed of multiple individual storage units controlled centrally and exporting to the distribution system.

Inactive • 2018-19 (T-1)
The Leys, Drayton Manor Farm, Alcester Road, Stratford-Upon-Avon, CV37 9RG (4 components)
• 800kW/1100kWh Lithium Ion Battery (2)
• 0.8 MW of demand reduction
Inactive • 2020-21 (T-4), 2019-20 (T-1) ...
The land adjacent to the electricity sub-station off Green Lane Thurcroft S66 9JD (2 components)

50 MW Storage facility located at Thurcroft. (2)

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Loading map...
Showing 25 locations