battery

432 unique locations (974 components) - Page 5 of 18

Potmans Lane, Battle, TN33 9BL (6 components)

A Battery Energy Storage System (2)

Inactive • 2023-24 (T-4), 2022-23 (T-3)
Port of Tilbury, Tilbury, RM18 7EH (2 components)
• New Build Generation CMU, advanced battery energy storage system.
• Site demand offset by onsite behind the meter advanced battery energy storage system.
Inactive • 2021-22 (T-4), 2019-20 (T-1)
Poplars, Drayton Manor Farm, Alcester Road, Stratford-Upon-Avon, CV37 9RG (4 components)
• 1 MW of demand reduction
• 1000kW/1200kWh Lithium Ion Battery
• 1MW Lithium Ion Battery
Inactive • 2020-21 (T-4), 2019-20 (T-1) ...
Plot C Land at Severn Road Avonmouth BS10 7SE (4 components)

The CMU will be formed of multiple individual Batteries. This site is to include a Battery Energy Storage System (BESS) that can either operate as import or export at will. … (2)

Inactive • 2023-24 (T-4), 2022-23 (T-4)
Plot 10 Dunnikier Business Park Midfield Drive Mitchelston Industrial Estate Kirkcaldy Fife KY1 3LW (2 components)

BATTERY STORAGE UNIT WITH 13.5 MWh energy supply and 20 MW power capacity (2)

Inactive • 2022-23 (T-4), 2021-22 (T-4)
PIERCES FARM PV PALMERS LANE NEAR GRAZELEY BURGHFIELD READING RG7 3AH (2 components)

Battery with 0.25MW and de-rated 0.217

Inactive • 2017-18 (T-1)
Pierces Farm, Goodboys Lane, Mortimer, Reading, RG7 3AH (1 component)

0.250 MW Lithium Ion Battery

Inactive • 2018-19 (T-1)
Pierces Farm, Field off Goring Lane, Grazeley Green, Reading, Berkshire. RG7 1LY (2 components)

1 x 250Kw/250KWh Lithium Ion Battery (2)

Battery LIMEJUMP LTD Not Prequalified RG7
Inactive • 2020-21 (T-4), 2017-18 (T-1)
Petts Wood, Eynsford Close, Orpington, BR5 1DP (3 components)
• A Battery Energy Storage System (2)
• 7 x 1mw Battery Storage units to be installed on designated land at Petts Wood
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Perseverance Road, Hereford, UK, HR4 9SE (1 component)

A 8MW New Build Battery Storage Site

Inactive • 2022-23 (T-4)
Perimeter Road, Liverpool, L33 3AF. (1 component)

The CMU comprises Lithium Ion batteries housed in ISO containers with an additional containers used to house the converters.

Inactive • 2021-22 (T-4)
Pen-y-Cymoedd Wind Farm, Treherbert Road, Treherbert, Treorchy. Rhondda Cynon Taf. South Wales CF42 5SX (10 components)

A new build 22 MW battery storage facility. Comprising of five containerised battery units, ten inverter banks (2 per battery container), associated 33kV transformers, switchgear and cabling. (3)

Inactive • 2023-24 (T-1), 2022-23 (T-1) ...
1.30 MW
Peel Common Battery Storage, Newgate Ln, Fareham, PO14 1JD (2 components)

20 MW storage battery (2)

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Partridge Hill Farm Austerfield Doncaster DN10 6HA (1 component)

10 MW of Battery Storage located at Doncaster.

Inactive • 2021-22 (T-4)
Pailton Pastures Montilo Lane Rugby CV23 OQN (1 component)

The CMU component at Pailton Pastures is an energy storage system comprised of Lithium-ion batteries. The system will have a 9.8 MW export capacity and an import capacity of 10MW.

Battery ANESCO GHEB LIMITED Not Prequalified CV2
Inactive • 2020-21 (T-4)
Oxcroft Solar Farm, Stanfree, Chesterfield, Derbyshire, S44 6AG (2 components)

1 x 800kW/1100kWh BYD Lithium Ion Battery (2)

Battery LIMEJUMP LTD Not Prequalified S44
Inactive • 2020-21 (T-4), 2017-18 (T-1)
Outram Road, Dukinfield, SK16 4XE (1 component)

Battery Storage Facilty

Battery Storage STOR 140 Ltd Not Prequalified SK16
Inactive • 2021-22 (T-4)
Osprey, Dunslow road, Eastfield, Scarborough, North Yorks, YO11 3UT (2 components)

BTM battery (2)

Inactive • 2019-20 (T-1), 2018-19 (T-1)
Orchard Bank Industrial Estate Forfar DD8 1TD (1 component)

9.999 MW battery storage located at Forfar.

Inactive • 2021-22 (T-4)
Old Trimpell Refinery Site Middleton Road Middleton Heysham LA3 3NT (2 components)

24 x 2MW battery storage units to be installed on designated land within a manufacturing compound on the Old Trimpell Refinery site. (2)

Inactive • 2023-24 (T-4), 2022-23 (T-4)
Old Gloucester Rd, Alveston, Bristol, UK, BS37 9TU (4 components)

This CMU is formed of a battery bank and PCS capable of providing 10MW of power. The system is connected via switch gear and a transformer to the 132kV network … (3)

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Oaks, Drayton Manor Farm, Alcester Road, Stratford-Upon-Avon, CV37 9RG (2 components)

1000kW/1200kWh Lithium Ion Battery (2)

Inactive • 2020-21 (T-4), 2017-18 (T-1)
Nunhide Lane Theale Berkshire RG31 7SD (3 components)

A new power plant, with associated civil works, switchgear and electrical connection. (3)

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
NORWICH ROAD INDUSTRIAL ESTATE, HALESWORTH, SUFFOLK, IP19 8QJ (5 components)
• The CMU component at Halesworth is an energy storage system comprised of batteries and will have an import capacity of … (2)
• The CMU component at Halesworth is an energy storage system comprised of batteries and will have an import and export …
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Loading map...
Showing 25 locations