Home List View Map View Technologies Companies Support Us Help Login Register
Theme

CHP and autogeneration

44 unique locations (630 components) - Page 1 of 2

1 Thane Road West, Nottingham, NG2 3AA (60 components)
• One of three CHP units at 1 Thane Road West, Nottingham, NG2 3AA (2)
• One of three CHP units at 1 Thane Road West, Nottingham, NG2 3AA.
Active • 2024-25 (T-1), 2023-24 (T-1) ...
17.30 MW
Station Road, Wigton, Cumbria CA7 9BG (29 components)
• Gas engine (2)
• Gas turbine
Active • 2024-25 (T-4), 2024-25 (T-1) ...
11.17 MW
Plot 3, Barrow Man Road, Birchington CT7 0AX (11 components)

Gas CHP in a horticultural environment providing heat & electricity to site and exporting excess. (3)

Active • 2028-29 (T-4), 2025-26 (T-4) ...
8.73 MW
Staverton, Trowbridge, Wiltshire, BA14 6PH (17 components)

Turbomach M50 Natural Gas fired CHP unit (3)

Active • 2024-25 (T-4), 2023-24 (T-1) ...
7.60 MW
London Rd, Purfleet RM19 1SD (16 components)

Gas-fired CHP unit (3)

Active • 2024-25 (T-4), 2023-24 (T-1) ...
7.31 MW
The Old Airfield, City Fields Way, Tangmere, Chichester West Sussex PO20 2FT (12 components)

Four CHP engines in a horticultural environment with no auxilliary load. All generation unit capacities are nominal and allow for site-specific variations. (3)

Active • 2028-29 (T-4), 2025-26 (T-4) ...
6.37 MW
Plot 4 Thanet Earth, Barrow Man Road Birchington Kent CT7 0AX (7 components)

Two CHP gas engines in commercial horticultural environment with no auxilliary load (3)

Active • 2028-29 (T-4), 2025-26 (T-4) ...
5.96 MW
Thanet Earth Plot 2, 2 Barrow Man Road Birchington Kent CT7 0AX (10 components)

CHP engine in horticultural environment with no auxilliary load (3)

Active • 2028-29 (T-4), 2025-26 (T-4) ...
5.82 MW
Plot 6 Barrow Man Road, Birchington CT7 0AX (11 components)

CHP engine in a horticultural environment, natural gas, no aux load (3)

Active • 2028-29 (T-4), 2025-26 (T-4) ...
5.82 MW
323 Avebury Boulevard, MILTON KEYNES MK9 2GA (10 components)

District heating implementation of two gas CHP engines with no auxilliary load (3)

Active • 2026-27 (T-4), 2025-26 (T-4) ...
5.48 MW
Barrow Man Road Birchington Kent CT7 0AX (10 components)

Two CHP engines in horticultural environment with no auxilliary load (3)

Active • 2028-29 (T-4), 2025-26 (T-4) ...
4.73 MW
Port Causeway Bromborough Merseyside CH62 4TH (16 components)

Turbomach M50 Natural Gas fired CHP unit (3)

Active • 2024-25 (T-4), 2023-24 (T-1) ...
4.03 MW
9 Handyside St, Kings Cross, London N1C 4BH (11 components)

Energy Centre with gas CHP engines providing district heating and power to local community. All generation unit capacities are nominal and allow for site-specific variations. (3)

Active • 2027-28 (T-4), 2025-26 (T-4) ...
3.52 MW
Plot 5, Barrow Man Road, Birchington Kent CT7 0AX (8 components)

One CHP engine in a horticultural environment with no auxilliary load. (3)

Active • 2028-29 (T-4), 2025-26 (T-4) ...
2.97 MW
Thearne Lane Woodmansey Beverley HU17 0SA (7 components)
• Two gas CHP engines in commercial horticultural environment with no auxilliary load (2)
• Gas CHP engines in commercial horticultural environment with no auxilliary load
Active • 2027-28 (T-4), 2025-26 (T-4) ...
1.05 MW
Priory Street, Ware, Hertfordshire, SG12 0DJ (9 components)

On-site existing CHP generating unit (3)

Active • 2024-25 (T-4), 2023-24 (T-4) ...
King's Buildings, West Mains Road, Edinburgh, EH9 3JG (8 components)

One CHP, generating for site load which exceeds generating capacity. No aux load. (3)

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Ottringham Road Keyingham Hull North Humberside HU12 9RX (7 components)

Eight gas CHP engines for commercial horticultural use with no auxilliary load (3)

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Seal Sands, Middlesbrough, TS2 1UB (14 components)
• One of four SURF (Aggreko) model CHP units rated at 1375kVA (2)
• One of four SURF (Aggreko) model CHP units rated at 1375KVA
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Seal Sands, Middlesborough, TS2 1UB (14 components)

One of four SURF (Aggreko) model CHP units rated at 1375kVA (3)

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
North Lonsdale Road, Cumbria, Ulverston, LA12 9DR (10 components)

On-site existing CHP generating unit (3)

Inactive • 2022-23 (T-4), 2022-23 (T-3) ...
Sallow Rd, Weldon Ind Est, Corby Northants, NN17 5JX (7 components)

The component corresponds to two gas turbines embedded into a CHP located on an industrial plant. The two turbine export electricity onto the site's private network. (3)

Inactive • 2022-23 (T-4), 2019-20 (T-1) ...
Lhoist UK Ltd Hindlow Buxton SK17 0EL (12 components)
• GE Jenbacher JMS612 containerised gas engine generating set rated at 2.004MW, providing heat and electricity to be used on site. (2)
• GE Jenbacher JMS612 containerised gas engine generating set rated at 2.004MW, providing heat and electricity.
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Clatterbridge Road, Bebington, Birkenhead, Wirral CH63 4JY (3 components)

On-site existing CHP generating unit (3)

Inactive • 2022-23 (T-4), 2019-20 (T-1) ...
Edgabaston, Birmingham, West Midlands, B15 2TT (17 components)
• Gas Engine
• Gas engine
• Gas turbine generator
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Loading map...
Showing 25 locations