Home List View Map View Technologies Companies Support Us Help Login Register
Theme

CHP and autogeneration

34 unique locations (609 components) - Page 1 of 2

Power Station Road Isle of Grain Rochester ME3 0AR (55 components)
• Grain B CCGT Unit 6 Grain B power station provides heat to the Grain LNG regasification facility.
• Grain B CCGT Unit 7 Grain B power station provides heat to the Grain LNG regasification facility.
• Grain B CCGT Unit 8. Grain B power station provides heat to the Grain LNG regasification facility.
• ... and 2 more unique descriptions
Active • 2028-29 (T-4), 2027-28 (T-4) ...
4000.25 MW
Rosper Road Immingham North Lincolnshire DN40 3DZ (16 components)
• Gas CHP on South bank of river Humber providing electricity and industrial steam (8)
• New build gas reciprocating multi-engine generating plant (4)
• Battery storage unit
Active • 2028-29 (T-4), 2027-28 (T-4) ...
3439.50 MW
Saltend Power Station Saltend Hull HU12 8GA (33 components)
• Unit 1 at Saltend Power Station (2)
• Unit 2 at Saltend Power Station (2)
• Unit 3 at Saltend Power Station
Active • 2028-29 (T-4), 2027-28 (T-4) ...
3107.85 MW
Bo'ness Road Grangemouth Stirlingshire FK3 9XQ (12 components)

CHP Plant connected to Private Wire System (operated by INEOS Infrastructure (Grangemouth) Limited) with Connection to NETS (5)

Active • 2027-28 (T-4), 2026-27 (T-4) ...
259.76 MW
RRRL-EfW Facility Norman Road North Belvedere Kent DA17 6JY (13 components)

Energy from Waste Recovery Facility (12)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
206.61 MW
Sembcorp UK Headquarters, Wilton International, Middlesbrough, TS90 8WS (21 components)
• (Please note: CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). Unit is a OCGT … (4)
• (Please note: CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). S24G01 is a OCGT …
Active • 2028-29 (T-4), 2027-28 (T-4) ...
184.43 MW
166.09 MW
125.98 MW
Winnington CHP Winnington Lane Winnington Northwich Cheshire CW8 4GX (31 components)
• Continuously operating, maximum output GE gas turbine driving a 47.020MVA Alstom generator at 0.85 power factor. (3)
• Continuously operating, maximum output GE gas turbine driving a 47.020MWA Alstom generator at 0.85 power factor.
• Continuously operating, variable output Man Diesel Turbo single pass-out back pressure turbine driving a 19.300 MVA TD Power Systems generator …
Active • 2028-29 (T-4), 2027-28 (T-4) ...
119.61 MW
Sembcorp UK Headquarters Wilton International Middlesbrough TS90 8WS United Kingdom (12 components)
• CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). S26G02 is a OCGT in CHP … (3)
• CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). S24G02 is a OCGT in CHP … (2)
Active • 2028-29 (T-4), 2027-28 (T-4) ...
116.40 MW
Cargill PLC, Trafford Park, Manchester, M17 1PA (48 components)
• Siemens SGT200 based CHP (13)
• Solar T70 Based CHP System (13)
• Solar T70 based CHP system (13)
Active • 2028-29 (T-4), 2027-28 (T-4) ...
61.64 MW
Europa Energy Centre, Hills Court Road, Ash, Kent, CT3 2AP (19 components)

The CMU Component will have a connection capacity of 15MW. Gas-fired reciprocating engine will be the technology used. (5)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
41.65 MW
Drakemyre, Dalry KA24 5JJ (18 components)
• Large engine in an industrial station environment, exporting excess energy to distribution network. Primary fuel type = Natural Gas (10)
• Gas turbine in an industrial station environment, exporting excess energy to distribution network. Primary fuel type = Natural Gas (2)
• One 22.9MVA gas turbine in an industrial station environment, exporting excess energy to distribution network. Primary fuel type = Natural … (2)
Active • 2028-29 (T-4), 2026-27 (T-4) ...
26.66 MW
Newton Aycliffe CO Durham DL5 6EA (30 components)
• This is an existing CHP (4)
• This is a long standing existing CHP unit located on land within a manufacturing site.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
21.83 MW
47-53 Charterhouse Street, London, EC1M 6PB (17 components)

A site with two gas engine CHPs, providing hot water to a local district heating network as well as chilled water from an absorption chiller to a district chill network. (5)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
21.54 MW
Cargill PLC, Trafford Park, M17 1PA (16 components)

Siemens SGT200 Based CHP (5)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
19.60 MW
Tees Valley Nursery, The Moat, Belasis Hall, TS23 4ED (21 components)

The CMU component TEES01 is one gas-fired Jenbacher CHP engine. It will be supplying heat, CO2 and power to the on-site tomato Nursery all year. (5)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
18.39 MW
Cardiff Road, Barry, Vale of Glamorgsan, CF63 2YL (22 components)
• Gas Turbine CHP GT001B (3)
• Steam Turbine CHP (2)
Active • 2026-27 (T-4), 2025-26 (T-4) ...
15.32 MW
Wood End, Stocks Lane, Over Peover, Knutsford WA16 9EZ (16 components)
• 2MW gas CHP engine in a horticultural environment (2)
• One 2MW gas CHP engine in a horticultural environment (2)
• One 1.5 MW gas CHP engine in a horticultural environment
Active • 2028-29 (T-4), 2027-28 (T-4) ...
10.01 MW
Royal Liverpool University Hospital, Prescott Street, Liverpool L7 8XP (11 components)
• 2 x Gas reciprocating engines with a total rated gross power capacity of 5.362 MW and total net power capacity … (2)
• 2 x Gas reciprocating engines with a total rated gross power capacity of 5.362 MW and total net power capacity … (2)
• 2 x Gas reciprocating engines with a total rated gross power capacity of 5.241 MW and total net power capacity …
Active • 2026-27 (T-4), 2025-26 (T-4) ...
9.55 MW
Nr 125 Park Lane Cottingham East Yorkshire HU16 5RX (17 components)
• CHP at a horticultural environment. (2)
• Gas CHP engines in commercial horticultural environment with no auxilliary load (2)
• CHP at horticultural site
Active • 2028-29 (T-4), 2027-28 (T-4) ...
9.29 MW
Woodhouse Energy Centre A. Pearson and Sons? Nursery Alderley Edge SK9 7UW (12 components)
• The CMU Component will have a connection capacity of 3.376MW. Gas-fired reciprocating engine will be the technology used. (3)
• The CMU Component will have a connection capacity of 3.298MW net of 46kW auxiliary load. Gas-fired reciprocating engine will be … (2)
Active • 2028-29 (T-4), 2027-28 (T-4) ...
9.23 MW
QMC Campus, Nottingham University Hospitals, Queens Medical Centre, Derby Road, Nottingham, NG7 2UH (10 components)

A site with one gas turbine CHP, providing steam and electricity to Queens Medical Centre in Nottingham (5)

Active • 2027-28 (T-4), 2026-27 (T-4) ...
8.13 MW
Smurfit Kappa SSK, Mount Street, Nechells, Birmingham B7 5RE (11 components)
• 8.300MW Gas Turbine installation (3)
• 8.3MW Gas Turbine installation (2)
Active • 2027-28 (T-4), 2026-27 (T-4) ...
7.58 MW
Denison Road, Selby, North Yorkshire YO8 8AN (15 components)

One 8 MWe Gas Turbine Cogeneration Unit (GT2) (5)

Active • 2026-27 (T-4), 2025-26 (T-4) ...
7.51 MW
Loading map...
Showing 25 locations