Power Station Road Isle of Grain Rochester ME3 0AR (55 components)
• Grain B CCGT Unit 6 Grain B power station provides heat to the Grain LNG regasification facility.
• Grain B CCGT Unit 7 Grain B power station provides heat to the Grain LNG regasification facility.
• Grain B CCGT Unit 8. Grain B power station provides heat to the Grain LNG regasification facility.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
4000.25 MW
Rosper Road Immingham North Lincolnshire DN40 3DZ (16 components)
• Gas CHP on South bank of river Humber providing electricity and industrial steam (2)
• Battery storage unit
Active • 2028-29 (T-4), 2027-28 (T-4) ...
3439.50 MW
Saltend Power Station Saltend Hull HU12 8GA (33 components)
• Unit 1 at Saltend Power Station
• Unit 2 at Saltend Power Station
• Unit 3 at Saltend Power Station
Active • 2028-29 (T-4), 2027-28 (T-4) ...
3107.85 MW
Bo'ness Road Grangemouth Stirlingshire FK3 9XQ (12 components)

CHP Plant connected to Private Wire System (operated by INEOS Infrastructure (Grangemouth) Limited) with Connection to NETS (3)

Active • 2027-28 (T-4), 2026-27 (T-4) ...
259.76 MW
RRRL-EfW Facility Norman Road North Belvedere Kent DA17 6JY (13 components)

Energy from Waste Recovery Facility (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
206.61 MW
Sembcorp UK Headquarters, Wilton International, Middlesbrough, TS90 8WS (21 components)

(Please note: CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). Unit is a OCGT and Steam Turbine in CHP Configuration within the (former ICI) … (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
184.43 MW
166.09 MW
125.98 MW
Winnington CHP Winnington Lane Winnington Northwich Cheshire CW8 4GX (31 components)
• Continuously operating, maximum output GE gas turbine driving a 47.020MVA Alstom generator at 0.85 power factor. (2)
• Continuously operating, maximum output GE gas turbine driving a 47.020MWA Alstom generator at 0.85 power factor.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
119.61 MW
Sembcorp UK Headquarters Wilton International Middlesbrough TS90 8WS United Kingdom (12 components)

CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). S26G02 is a OCGT in CHP Configuration within the (former ICI) Wilton Site. (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
116.40 MW
Cargill PLC, Trafford Park, Manchester, M17 1PA (48 components)
• Siemens SGT200 based CHP
• Solar T70 Based CHP System
• Solar T70 based CHP system
Active • 2028-29 (T-4), 2027-28 (T-4) ...
61.64 MW
Saddlebow Industrial Estate, Poplar Avenue, Kings Lynn, Norfolk, PE34 3AL (2 components)
• The CMU comprises one Gas Turbine generator, one HRSG boiler, one Back Pressure Steam Turbine generator and associated anciliary plant …
• The CMU comprises one Gas Turbine generator, one HRSG boiler, one Back Pressure Steam Turbine generator and associated ancillary plant …
Active • 2028-29 (T-4), 2021-22 (T-4)
42.50 MW
Europa Energy Centre, Hills Court Road, Ash, Kent, CT3 2AP (19 components)

The CMU Component will have a connection capacity of 15MW. Gas-fired reciprocating engine will be the technology used. (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
41.65 MW
Drakemyre, Dalry KA24 5JJ (18 components)

Large engine in an industrial station environment, exporting excess energy to distribution network. Primary fuel type = Natural Gas (3)

Active • 2028-29 (T-4), 2026-27 (T-4) ...
26.66 MW
Newton Aycliffe CO Durham DL5 6EA (30 components)

This is an existing CHP (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
21.83 MW
47-53 Charterhouse Street, London, EC1M 6PB (17 components)

A site with two gas engine CHPs, providing hot water to a local district heating network as well as chilled water from an absorption chiller to a district chill network. (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
21.54 MW
Cargill PLC, Trafford Park, M17 1PA (16 components)

Siemens SGT200 Based CHP (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
19.60 MW
Tees Valley Nursery, The Moat, Belasis Hall, TS23 4ED (21 components)

The CMU component TEES01 is one gas-fired Jenbacher CHP engine. It will be supplying heat, CO2 and power to the on-site tomato Nursery all year. (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
18.39 MW
1 Thane Road West, Nottingham, NG2 3AA (60 components)
• One of three CHP units at 1 Thane Road West, Nottingham, NG2 3AA (2)
• One of three CHP units at 1 Thane Road West, Nottingham, NG2 3AA.
Active • 2024-25 (T-1), 2023-24 (T-1) ...
17.30 MW
100 Montifichet Road, Westfield, Stratford E20 1GR (36 components)

Combined Heat and Power Plant Stratford made up of 2 generators totalling 6.6MW however the generator sizes have been inserted pro rata to achieve the overall CMU capacity of 5.838 … (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
16.59 MW
Cardiff Road, Barry, Vale of Glamorgsan, CF63 2YL (22 components)
• Gas Turbine CHP GT001B (2)
• Steam Turbine CHP
Active • 2026-27 (T-4), 2025-26 (T-4) ...
15.32 MW
High Street, Waterham, nr Faversham, Kent ME13 9EJ (10 components)

6 CHP engines horticultural environment with no auxiliiary load (3)

Active • 2027-28 (T-4), 2025-26 (T-1) ...
13.39 MW
Station Road, Wigton, Cumbria CA7 9BG (29 components)
• Gas engine (2)
• Gas turbine
Active • 2024-25 (T-4), 2024-25 (T-1) ...
11.17 MW
Southampton General Hospital Tremona Road, Southampton, SO16 6YD (9 components)
• 2X gas reciprocating engines with a total gross power capacity of 3.973 MW (2)
• 2*2 gas reciprocating engines with a total gross power capacity of 3.973 MW
Active • 2028-29 (T-4), 2027-28 (T-4) ...
10.45 MW
Wood End, Stocks Lane, Over Peover, Knutsford WA16 9EZ (16 components)
• 2MW gas CHP engine in a horticultural environment
• One 1.5 MW gas CHP engine in a horticultural environment
• One 2MW gas CHP engine in a horticultural environment
Active • 2028-29 (T-4), 2027-28 (T-4) ...
10.01 MW
Loading map...
Showing 25 locations