Home List View Map View Technologies Companies Support Us Help Login Register
Theme

CHP and autogeneration

18 unique locations (350 components)

Drakemyre, Dalry KA24 5JJ (18 components)
• Large engine in an industrial station environment, exporting excess energy to distribution network. Primary fuel type = Natural Gas (10)
• Gas turbine in an industrial station environment, exporting excess energy to distribution network. Primary fuel type = Natural Gas (2)
• One 22.9MVA gas turbine in an industrial station environment, exporting excess energy to distribution network. Primary fuel type = Natural … (2)
Active • 2028-29 (T-4), 2026-27 (T-4) ...
26.66 MW
1 Thane Road West, Nottingham, NG2 3AA (60 components)
• One of three CHP units at 1 Thane Road West, Nottingham, NG2 3AA (3)
• One of three CHP units at 1 Thane Road West, Nottingham, NG2 3AA. (2)
Active • 2024-25 (T-1), 2023-24 (T-1) ...
17.30 MW
Station Road, Wigton, Cumbria CA7 9BG (29 components)
• Gas engine (3)
• Gas turbine (2)
Active • 2024-25 (T-4), 2024-25 (T-1) ...
11.17 MW
Nr 125 Park Lane Cottingham East Yorkshire HU16 5RX (17 components)
• CHP at a horticultural environment. (2)
• Gas CHP engines in commercial horticultural environment with no auxilliary load (2)
• CHP at horticultural site
Active • 2028-29 (T-4), 2027-28 (T-4) ...
9.29 MW
Staverton, Trowbridge, Wiltshire, BA14 6PH (17 components)

Turbomach M50 Natural Gas fired CHP unit (5)

Active • 2024-25 (T-4), 2023-24 (T-1) ...
7.60 MW
London Rd, Purfleet RM19 1SD (16 components)

Gas-fired CHP unit (5)

Active • 2024-25 (T-4), 2023-24 (T-1) ...
7.31 MW
Great Western Rd, Gloucestershire, Gloucester GL1 3NN (9 components)

CHP installation in the Energy Centre of an NHS Hospital. The CHP will be sub metered. (5)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
4.56 MW
46 Station Road Stokesley Middlesbrough TS9 7AA (10 components)
• Gas CHP engines in commercial horticultural usage with no auxilliary load (4)
• 2 x 2.25 Gas reciprocating engines to be installed at Cleveland Nurseries (replacing existing CHP)
Active • 2027-28 (T-4), 2025-26 (T-4) ...
4.25 MW
John Radcliffe Hospital, Headley Way, Headington, Oxford, OX3 9DU (6 components)
• VIT305 - CHP unit at John Radcliffe Hospital, Headley Way, Headington, Oxford, OX3 9DU. (4)
• New 4.5MW CHP at Oxford Hospital
Active • 2026-27 (T-4), 2025-26 (T-4) ...
4.07 MW
Port Causeway Bromborough Merseyside CH62 4TH (16 components)

Turbomach M50 Natural Gas fired CHP unit (5)

Active • 2024-25 (T-4), 2023-24 (T-1) ...
4.03 MW
Galley Hill Road Waltham Abbey Essex EN9 2AG (13 components)
• Gas engines in commercial horticultural environment with no auxilliary load. All generation unit capacities are nominal and allow for site-specific … (6)
• Gas CHP engines 1.37MW and 1.50MW. Primary fuel type = Natural Gas (2)
Active • 2028-29 (T-4), 2025-26 (T-4) ...
1.28 MW
Energy Center, Ashton Street, Liverpool, L69 3GB (39 components)
• One of three CHP units at Energy Center, Ashton Street, Liverpool, L69 3GB (3)
• One of three CHP units at Energy Center, Ashton Street, Liverpool, L69 3GBNY 25354 48843 (2)
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Repton Road, Measham, Swadlincote, DE12 7DT (9 components)
• Gas fired CHP unit (4)
• CHP unit
Active • 2024-25 (T-1), 2023-24 (T-1) ...
Stoneykirk Road, Stranraer, DG9 7BU (9 components)
• Gas fired CHP unit (4)
• CHP unit
Active • 2024-25 (T-1), 2023-24 (T-1) ...
Laporte Road, Stallingborough, North East Lincolnshire, DN40 2PR (33 components)
• 2.8MWe back pressure steam turbine (3)
• 6.46 MWe Ruston Tornado Gas Turbine (Siemens SG200) (2)
Active • 2024-25 (T-1), 2023-24 (T-1) ...
Haxby Rd, York, YO91 1XY (9 components)
• CHP Unit (3)
• Gas fired CHP unit (2)
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Church Manorway, Erith DA8 1DL (33 components)

gas-fired CHP unit (5)

Active • 2024-25 (T-1), 2023-24 (T-1) ...
Loading map...
Showing 18 locations