Combined Heat and Power (CHP)
40 unique locations (446 components) - Page 1 of 2
Saddlebow Industrial Estate, Poplar Avenue, Kings Lynn, Norfolk, PE34 3AL (2 components)
1 Thane Road West, Nottingham, NG2 3AA (60 components)
Staverton, Trowbridge, Wiltshire, BA14 6PH (17 components)
Turbomach M50 Natural Gas fired CHP unit (3)
Bristol Royal Infirmary, Marlborough Hill, Bristol, BS2 8HW. (7 components)
CHP Engine 3.360MW (3)
John Radcliffe Hospital, Headley Way, Headington, Oxford, OX3 9DU (6 components)
VIT305 - CHP unit at John Radcliffe Hospital, Headley Way, Headington, Oxford, OX3 9DU. (3)
Port Causeway Bromborough Merseyside CH62 4TH (16 components)
Turbomach M50 Natural Gas fired CHP unit (3)
Lancaster University, Bailrigg, Lancaster, LA1 4YW (6 components)
Gas fired CHP unit (3)
Ormskirk and District General Hospital, Wigan Road, Ormskirk, Lancashire, L39 2AZ (4 components)
Barrack Road, Exeter, EX2 5DW. (5 components)
1.521 MW CHP unit (3)
Thirsk Factory, Dalton Airfield, Topcliffe, Thirsk, YO7 3HE. (5 components)
1.280MW CHP (3)
3 Fountain Drive, Inchinnan Business Park, Paisley, PA4 9RF. (5 components)
MTU - 8V400064 1.013MW (3)
Engie Great Coates, Grimsby, DN31 2TT (14 components)
1345 Govan Rd., Glasgow, G51 4TF (4 components)
CHPs at Queen Elizabeth Hospital (3)
Cats Terminal, Seal Sands Rd, Middlesbrough, Cleveland, TS2 1UB (4 components)
Turbo Expander - for pressure reduction of incoming natural gas (3)
Laporte Road, Stallingborough, North East Lincolnshire, DN40 2PR (33 components)
Foresterhill Health Campus, Aberdeen AB25 2AY (5 components)
A gas turbine installed at Aberdeen Royal Infirmary (3)
Stoneywood Mill, Bucksbum, Aberdeen, AB21 9AB (1 component)
Generating Plant located at Stoneywood Mill, Bucksbum, Aberdeen, AB21 9AB
Speke Operations, Fleming Rd, Liverpool L24 9LN (5 components)
King's Buildings, West Mains Road, Edinburgh, EH9 3JG (8 components)
One CHP, generating for site load which exceeds generating capacity. No aux load. (3)
Ottringham Road Keyingham Hull North Humberside HU12 9RX (7 components)
Eight gas CHP engines for commercial horticultural use with no auxilliary load (3)
Seal Sands, Middlesbrough, TS2 1UB (14 components)
Seal Sands, Middlesborough, TS2 1UB (14 components)
One of four SURF (Aggreko) model CHP units rated at 1375kVA (3)