Pembroke Power Station Pembroke Dyfed SA71 5SS (55 components)
• Pembroke 11 - CCGT MSID: 7237
• Pembroke 21 - CCGT MSID: 7237
• Pembroke 31 - CCGT MSID: 7237
• ... and 2 more unique descriptions
Active • 2028-29 (T-4), 2027-28 (T-4) ...
6183.38 MW
Staythorpe Power Station Staythorpe Newark Nottinghamshire NG23 5PS (44 components)
• Staythorpe 1 - CCGT MSID: 7210 (2)
• Staythorpe 2 - CCGT MSID: 7210
• Staythorpe 3 - CCGT MSID: 7210
• ... and 1 more unique description
Active • 2028-29 (T-4), 2027-28 (T-4) ...
4893.37 MW
Didcot B Power Station Milton Road Didcot Oxfordshire OX11 7YU (24 components)
• Didcot B5 - CCGT MSID: 4055 (3)
• Didcot B6 - CCGT MSID: 4055 (2)
Active • 2028-29 (T-4), 2027-28 (T-4) ...
4108.24 MW
Kelsterton Road, Connah's Quay, Flintshire CH5 4BP (62 components)
• Connah's Quay PS Unit 1 CCGT (2)
• Connah's Quay PS Unit 2 CCGT
• Connah's Quay PS Unit 3 CCGT
• ... and 1 more unique description
Active • 2028-29 (T-4), 2027-28 (T-4) ...
3889.16 MW
West Burton B Power Station, West Burton, Retford, Nottinghamshire, DN22 9BL (22 components)
• West Burton B Power Station CMU 1 WB1-23= 100% T_WBURB-1
• West Burton B Power Station CMU 1 WB1-24= 100% T_WBURB-1
• West Burton B Power Station CMU 2 WB2-23= 100% T_WBURB-2
• ... and 2 more unique descriptions
Active • 2028-29 (T-4), 2027-28 (T-4) ...
3608.42 MW
Peterhead Power Station, Peterhead, Aberdeenshire, AB42 3BZ (15 components)
• Peterhead CCGT (9)
• Peterhead 1
• Peterhead 1 for Delivery Year 2017/18 only
• ... and 1 more unique description
Active • 2028-29 (T-4), 2027-28 (T-4) ...
3242.27 MW
Eggborough Power Station, Goole, East Yorkshire, DN14 0BS (49 components)
• New build Open Cycle Gas Turbine unit 5 at Eggborough Power Station (2)
• Battery Energy Storage System built on land at the former Eggborough Power Station (Unit 3)
• Battery Energy Storage System built on land at the former Eggborough Power Station (Unit 4)
• ... and 1 more unique description
Active • 2028-29 (T-4), 2027-28 (T-4) ...
2549.84 MW
Seabank Power Limited Severn Road, Hallen Bristol BS10 7SP (11 components)

Multi Shaft CCGT (Module 1) (10)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
2260.43 MW
Cow Hey Lane, Runcorn, Cheshire, WA7 4FZ (12 components)

A CCGT station consisting of two Alstom GT26A gas turbines, with an Alstom heat recovery steam generator each that produces steam for one ABB steam turbine and is based near … (5)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
2236.70 MW
The Manor Way, Stanford-le-Hope, Essex, SS17 9GN (11 components)

A CCGT station consisting of two Alstom GT26 gas turbines and a steam turbine and is based near Stanford-le-hope in Essex, England. Each turbine is individually metered with output being … (5)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
2191.04 MW
Little Barford Power Station Little Barford St Neots PE19 6YT (22 components)
• Little Barford 1 CCGT MSID: 4052 (3)
• Little Barford 1 OCGT . fuel type is distillate MSID: 4052 (2)
Active • 2028-29 (T-4), 2027-28 (T-4) ...
2060.91 MW
West Marsh Road, Spalding, Lincolnshire, PE11 2BB (5 components)

A CCGT station consisting of two General Electric 9FA+e gas turbines with two VOGT-NEM heat recovery steam generators and one Hitachi steam turbine and is based near Spalding in Lincolnshire. … (5)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
1734.13 MW
EP Langage Power Station, Holland Road, Plymouth, PL7 5AW. (8 components)

EP Langage Power Station is a Combined Cycle Gas Turbine (CCGT) electricity generating station. (5)

Active • 2027-28 (T-4), 2026-27 (T-4) ...
1655.52 MW
Cottam Development Centre Power Station Cottam Retford DN22 0TF (9 components)

Cottam Development Centre (CDC) CCGT single unit station (5)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
1223.33 MW
111 Brancroft Way Enfield Middlesex EN3 7PL (12 components)

Enfield CCGT Power Station - (one unit station) (10)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
1217.86 MW
Seabank Power Limited Severn Road, Hallen, Bristol BS10 7SP (11 components)

Single Shaft CCGT (Module 2) (5)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
1141.17 MW
Great Yarmouth Power Station South Denes Road Great Yarmouth Norfolk NR30 3PY (11 components)

Great Yarmouth 1 - CCGT MSID: 7111 (5)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
1122.91 MW
Clough Lane North Killingholme North Lincolnshire DN40 3JP (7 components)

A combined cycle gas turbine generating plant (5)

Active • 2027-28 (T-4), 2026-27 (T-4) ...
859.77 MW
132 Manchester Road, Carrington, Manchester, M31 4AY (17 components)
• 250MW capacity system with 500MWh of batteries with all ancillary equipment to be installed on the Trafford Power Site
• 49.5 MW Gas Reciprocating engines with all ancillary equipment to be installed on the Trafford Power Site
• 5 x 4.5MW Gas Reciprocating engines with all ancillary equipment to be installed on the Trafford Power Site
• ... and 2 more unique descriptions
Active • 2027-28 (T-4), 2025-26 (T-4) ...
93.41 MW
RWE Cogen UK (Hythe) Ltd Charleston Road Hardley Hythe Southampton SO45 3BP (4 components)
• Hythe Power Station - Auxiliary load behind boundary meter (2)
• Hythe Power Station - One (1) Gas Turbine, Two (2) Steam Turbines configured to operate in Combined Cycle Mode.
• Three (3) Reciprocating Gas Engines
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Keadby Power Station, Trentside, Scunthorpe, North Lincolnshire, DN17 3EF (7 components)
• Keadby GT3 (3)
• Keadby 1 CCGT
• Keadby Unit 1
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Corringham, Stanford-le-Hope, Essex SS17 9LP UK (2 components)

A new combined cycle power station comprising the latest technology gas turbine(s), heat recovery steam generator(s), steam turbine(s) and associated balance of plant. This will be constructed on brownfield land … (2)

Inactive • 2021-22 (T-4), 2020-21 (T-4)
Baglan Bay Power Station Baglan Energy Park Port Talbot SA12 7GE (20 components)
• Existing BAGE-1 CCGT repowered with new gas turbine and substantial BOP improvements (2)
• Existing CCGT Baglan Unit 1 (2)
• Existing OCGT module
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Loading map...