Home List View Map View Technologies Companies Support Us Help Login Register
Theme

Combined Cycle Gas Turbine (CCGT)

5 unique locations (93 components)

Keadby Power Station Trentside, Keadby, Scunthorpe, DN17 3EF (33 components)
• Keadby 1 CCGT (3)
• Keadby GT3 (2)
Active • 2028-29 (T-4), 2027-28 (T-4) ...
3519.87 MW
Medway Power Station, Rochester, Medway, ME3 0AG (18 components)

Medway CCGT (5)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
3352.85 MW
Mitchell Road, Phoenix Parkway, Corby, Northamptonshire, NN17 5QT (29 components)
• The CMU is a Open Cycle Gas Turbine (OCGT) (2)
• The CMU is a gas plant, capable of running in either OCGT or CCGT modes (2)
• The CMU is a combined cycle gas turbine
Active • 2028-29 (T-4), 2027-28 (T-4) ...
1943.05 MW
Livesey Branch Rd, Feniscowles, Blackburn, Lancashire, BB2 5HX (10 components)
• Small Combined Cycle Gas Turbine plant with registered capacity 75MVA or 60MW at 0.8PF. (3)
• Small Combined Cycle Gas Turbine plant with contracted connection capacity 75MVA or 60MW at 0.8PF (2)
Active • 2028-29 (T-4), 2027-28 (T-4) ...
112.19 MW
Huntsman Drive, Seal Sands, TS2 1TT (3 components)

2 x Natural Gas Turbine Generators, each exhausting to a single Heat Recovery Steam Generator, supplying steam to a single Steam Turbine Generator. 1 x Auxiliary Steam package boiler natural … (2)

Active • 2024-25 (T-1), 2023-24 (T-1)
31.97 MW
Loading map...
Showing 5 locations