Home List View Map View Technologies Companies Support Us Help Login Register
Theme

Combined Heat and Power (CHP)

346 unique locations (2971 components) - Page 3 of 14

Samworth Brothers, 81-83 Tavistock Road, Callington, Cornwall, PL17 7TA (11 components)

Callington - Existing Site CHP unit (5)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
9.54 MW
APS Growers Ltd / Branfield Nursery 111 Stockbridge Road Elloughton HU15 1HW (14 components)
• One Jenbacher CHP engine with a generation capacity of 3.36 MW (10)
• The new Energy Centre will consist of one Jenbacher CHP engine with a generation capacity of 3.36 MW and a …
Active • 2028-29 (T-4), 2027-28 (T-4) ...
9.31 MW
Nr 125 Park Lane Cottingham East Yorkshire HU16 5RX (17 components)
• CHP at a horticultural environment. (2)
• Gas CHP engines in commercial horticultural environment with no auxilliary load (2)
• CHP at horticultural site
Active • 2028-29 (T-4), 2027-28 (T-4) ...
9.29 MW
Woodhouse Energy Centre A. Pearson and Sons? Nursery Alderley Edge SK9 7UW (12 components)
• The CMU Component will have a connection capacity of 3.376MW. Gas-fired reciprocating engine will be the technology used. (3)
• The CMU Component will have a connection capacity of 3.298MW net of 46kW auxiliary load. Gas-fired reciprocating engine will be … (2)
Active • 2028-29 (T-4), 2027-28 (T-4) ...
9.23 MW
Rydings lane, North Meols, West Lancashire, Lancashire, PR9 8EB (4 components)

A gas fuelled Combined heat and Power plant (4)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
9.19 MW
Plot 3, Barrow Man Road, Birchington CT7 0AX (11 components)

Gas CHP in a horticultural environment providing heat & electricity to site and exporting excess. (9)

Active • 2028-29 (T-4), 2025-26 (T-4) ...
8.73 MW
2 Engineers Way, Wembley, Middlesex, HA9 0JS (6 components)

Energy Centre with 2 x1.5MW gas CHP engines providing district heating and power to local community. All generation unit capacities are nominal and allow for site-specific variations. (5)

Active • 2027-28 (T-4), 2026-27 (T-4) ...
8.39 MW
Pontefract Rd, Leeds, LS10 1AX (16 components)

CHP unit (5)

Active • 2025-26 (T-1), 2024-25 (T-4) ...
8.38 MW
Muller Milk & Ingredients Ltd, Stonebridge Cross, Hampton Lovett, Droitwich, WR9 0NX (3 components)

On-Site Generating CMU (3)

Active • 2028-29 (T-4), 2025-26 (T-1) ...
8.35 MW
Shottentons Farm, Pecks Hill, Nazeing, Essex, EN9 2NY (9 components)

Gas fuelled CHP generation plant (5)

Active • 2027-28 (T-4), 2025-26 (T-4) ...
8.23 MW
Muller UK Limited, Tern Valley Business Park, Market Drayton, Shropshire, TF9 3SQ (3 components)

On-Site Generating CMU (3)

Active • 2028-29 (T-4), 2025-26 (T-1) ...
8.19 MW
Fielding & Johnson Building University Of Leicester University Road LEICESTER Leicestershire LE1 7RH (28 components)
• Combined Heat and Power Plant, University of Leicester, capacity of generator 1.600MW (3)
• Combined Heat and Power Plant, University of Leicester, generator's capacity 1.600MW (2)
Active • 2028-29 (T-4), 2027-28 (T-4) ...
8.17 MW
Pond Street London NW3 2QG (9 components)

On-site CHP - existing generating unit Pond Street London OS Grid Reference: TQ 272 854 NW3 2QG (5)

Active • 2027-28 (T-4), 2026-27 (T-4) ...
8.13 MW
QMC Campus, Nottingham University Hospitals, Queens Medical Centre, Derby Road, Nottingham, NG7 2UH (10 components)

A site with one gas turbine CHP, providing steam and electricity to Queens Medical Centre in Nottingham (5)

Active • 2027-28 (T-4), 2026-27 (T-4) ...
8.13 MW
Aston University, Aston Triangle, Birmingham, West Midlands, B4 7ET (30 components)
• 1MW Combined heat and Power Plant at Aston University. Total Capacity is 3.000MW, consisting of two generators - 2.000MW and … (3)
• 2MW Combined heat and Power Plant at Aston University. Total Capacity is 3.000MW, consisting of two generators - 2.000MW and … (2)
Active • 2028-29 (T-4), 2027-28 (T-4) ...
7.87 MW
Kings Yard Energy Centre, Carpenters Lane, Stratford, London E15 2DU (18 components)

Combined Heat and Power Plant Olympic Park London (12)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
7.77 MW
Staverton, Trowbridge, Wiltshire, BA14 6PH (17 components)

Turbomach M50 Natural Gas fired CHP unit (5)

Active • 2024-25 (T-4), 2023-24 (T-1) ...
7.60 MW
Smurfit Kappa SSK, Mount Street, Nechells, Birmingham B7 5RE (11 components)
• 8.300MW Gas Turbine installation (3)
• 8.3MW Gas Turbine installation (2)
Active • 2027-28 (T-4), 2026-27 (T-4) ...
7.58 MW
Denison Road, Selby, North Yorkshire YO8 8AN (15 components)

One 8 MWe Gas Turbine Cogeneration Unit (GT2) (5)

Active • 2026-27 (T-4), 2025-26 (T-4) ...
7.51 MW
Nufarm Wyke Lane, Wyke, Bradford, West Yorkshire, BD12 9EJ (3 components)

On-Site Generating CMU (3)

Active • 2028-29 (T-4), 2025-26 (T-1) ...
7.46 MW
Excel Energy Centre Warehouse R Royal Victoria Dock Northside London E16 1BA (25 components)
• 1.2 MW Combined Heat and Power Engine. (6)
• 1.6 MW Combined Heat and Power Engine (6)
• 1.6MW Combined Heat and Power Engine (4)
• ... and 1 more unique description
Active • 2028-29 (T-4), 2027-28 (T-4) ...
7.41 MW
London Rd, Purfleet RM19 1SD (16 components)

Gas-fired CHP unit (5)

Active • 2024-25 (T-4), 2023-24 (T-1) ...
7.31 MW
Samian Way, Aston, Clinton ,Aylesbury, England, HP22 5EZ (23 components)

CHP unit (5)

Active • 2025-26 (T-1), 2024-25 (T-4) ...
7.22 MW
Land off, Old School, Lane Hereford, HR4 9BP (3 components)
• A 13MW New Build Battery Storage site
• A 6MW New Build CHP site
• A New Build Battery Storage site
Active • 2026-27 (T-4), 2024-25 (T-4)
7.13 MW
Lever House, Wood Street, Port Sunlight Wirral, CH42 4XN (2 components)

2x reciprocating gas engines with an aggregate gross capacity of 3.996 MW and net capacity of 3.908 MW (2)

Active • 2028-29 (T-4), 2025-26 (T-1)
7.10 MW
Loading map...
Showing 25 locations