Home List View Map View Technologies Companies Support Us Help Login Register
Theme

Combined Heat and Power (CHP)

253 unique locations (2494 components) - Page 1 of 11

Power Station Road Isle of Grain Rochester ME3 0AR (55 components)
• Grain B CCGT Unit 6 Grain B power station provides heat to the Grain LNG regasification facility.
• Grain B CCGT Unit 7 Grain B power station provides heat to the Grain LNG regasification facility.
• Grain B CCGT Unit 8. Grain B power station provides heat to the Grain LNG regasification facility.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
4000.25 MW
Rosper Road Immingham North Lincolnshire DN40 3DZ (16 components)
• Gas CHP on South bank of river Humber providing electricity and industrial steam (2)
• Battery storage unit
Active • 2028-29 (T-4), 2027-28 (T-4) ...
3439.50 MW
Saltend Power Station Saltend Hull HU12 8GA (33 components)
• Unit 1 at Saltend Power Station
• Unit 2 at Saltend Power Station
• Unit 3 at Saltend Power Station
Active • 2028-29 (T-4), 2027-28 (T-4) ...
3107.85 MW
Esso Petroleum Company,Limited, Oil Refinery at Esso Refinery - Fawley - Southampton - Hampshire - SO45 1TX - United Kingdom (9 components)
• Unit 5 is a Cogenation unit which produces both steam and power. Unit 5 is the largest generating unit at … (2)
• Unit 5 is a Cogeneration unit which produces both steam and power. Unit 5 is the largest generating unit at …
Active • 2028-29 (T-4), 2027-28 (T-4) ...
379.81 MW
Esso Refinery - Fawley - Southampton - Hampshire - SO45 1TX - United Kingdom (29 components)
• TG1B is part of the aggregated CMU EMD-19, which is made up of 2 Generating Units of which TG1B is …
• TG1B is part of the aggregated CMU EMD244, which is made up of 2 Generating Units of which TG1B is …
• Unit 3 is part of the aggregated CMU EMD244, which is made up of 2 Generating Units of which Unit …
Active • 2028-29 (T-4), 2027-28 (T-4) ...
300.51 MW
Bo'ness Road Grangemouth Stirlingshire FK3 9XQ (12 components)

CHP Plant connected to Private Wire System (operated by INEOS Infrastructure (Grangemouth) Limited) with Connection to NETS (3)

Active • 2027-28 (T-4), 2026-27 (T-4) ...
259.76 MW
Sembcorp UK Headquarters, Wilton International, Middlesbrough, TS90 8WS (21 components)

(Please note: CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). Unit is a OCGT and Steam Turbine in CHP Configuration within the (former ICI) … (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
184.43 MW
166.09 MW
125.98 MW
Maesgwyn Farm, Chirk, Wrexham, LL14 5NT (14 components)

On-site CHP - existing generating unit Maesgwyn Farm, Chirk, Wrexham, LL14 5NT SJ 284 383 (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
122.26 MW
Winnington CHP Winnington Lane Winnington Northwich Cheshire CW8 4GX (31 components)
• Continuously operating, maximum output GE gas turbine driving a 47.020MVA Alstom generator at 0.85 power factor. (2)
• Continuously operating, maximum output GE gas turbine driving a 47.020MWA Alstom generator at 0.85 power factor.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
119.61 MW
Sembcorp UK Headquarters Wilton International Middlesbrough TS90 8WS United Kingdom (12 components)

CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). S26G02 is a OCGT in CHP Configuration within the (former ICI) Wilton Site. (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
116.40 MW
Cargill PLC, Trafford Park, Manchester, M17 1PA (48 components)
• Siemens SGT200 based CHP
• Solar T70 Based CHP System
• Solar T70 based CHP system
Active • 2028-29 (T-4), 2027-28 (T-4) ...
61.64 MW
British Steel Limited, Administration Building, Brigg Road, Scunthorpe, North Lincolnshire, England, DN16 1XA. (12 components)
• existing on site CHP (2)
• existing onsite CHP
Active • 2027-28 (T-4), 2026-27 (T-4) ...
46.25 MW
Saddlebow Industrial Estate, Poplar Avenue, Kings Lynn, Norfolk, PE34 3AL (2 components)
• The CMU comprises one Gas Turbine generator, one HRSG boiler, one Back Pressure Steam Turbine generator and associated anciliary plant …
• The CMU comprises one Gas Turbine generator, one HRSG boiler, one Back Pressure Steam Turbine generator and associated ancillary plant …
Active • 2028-29 (T-4), 2021-22 (T-4)
42.50 MW
Europa Energy Centre, Hills Court Road, Ash, Kent, CT3 2AP (19 components)

The CMU Component will have a connection capacity of 15MW. Gas-fired reciprocating engine will be the technology used. (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
41.65 MW
Saddlebow Industrial Estate, Poplar Avenue, King's Lynn PE34 3AL. (13 components)

Power Station for Paper plant made up of 1x35MW Gas engine plus 1x12MW steam turbine (3)

Active • 2026-27 (T-4), 2025-26 (T-4) ...
41.29 MW
Perenco UK, Wytch Farm, Thrashers Lane, Corfe Castle, Dorset, BH20 5JR (14 components)

Gas Engine (3)

Active • 2025-26 (T-1), 2024-25 (T-4) ...
39.64 MW
TOTAL LINDSEY OIL REFINERY LTD, EASTFIELD ROAD, NORTH KILLINGHOLME, IMMINGHAM, DN40 3LW (6 components)
• On-Site Generating CMU. (2)
• On-Site Generating Steam Turbine, utilising heat recovery waste as a 'fuel input' and generating electricity w/o fossil fuel emissions.
Active • 2025-26 (T-1), 2024-25 (T-4) ...
38.03 MW
Snodland Paper Mill, Mill Street, Snodland, Kent, ME6 5AX (4 components)

On-site Generating CMU. (3)

Active • 2028-29 (T-4), 2025-26 (T-1) ...
28.42 MW
British Steel Limited, Administration Building, Brigg Road, Scunthorpe, North Lincolnshire, England, DN16 1XA (12 components)
• existing CHP on site. (2)
• existing on site CHP
Active • 2027-28 (T-4), 2026-27 (T-4) ...
28.35 MW
27.40 MW
Drakemyre, Dalry KA24 5JJ (18 components)

Large engine in an industrial station environment, exporting excess energy to distribution network. Primary fuel type = Natural Gas (3)

Active • 2028-29 (T-4), 2026-27 (T-4) ...
26.66 MW
Newton Aycliffe CO Durham DL5 6EA (30 components)

This is an existing CHP (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
21.83 MW
47-53 Charterhouse Street, London, EC1M 6PB (17 components)

A site with two gas engine CHPs, providing hot water to a local district heating network as well as chilled water from an absorption chiller to a district chill network. (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
21.54 MW
Loading map...
Showing 25 locations