Home List View Map View Technologies Companies Support Us Help Login Register
Theme

DSR

162 unique locations (1320 components) - Page 1 of 7

New Victoria Park, Grange Road, Glasgow, G42 9LF (10 components)

Generators at hospital site (3)

Active • 2024-25 (T-1), 2023-24 (T-4) ...
Eurac - Dorset, 16 Mannings Heath Road Poole Dorset BH12 (6 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms. (3)

Active • 2024-25 (T-4), 2023-24 (T-4) ...
Ketton Works, Stamford, PE9 3SX (5 components)

Hanson site - Is Load Reduction/ Turn Down (3)

Active • 2024-25 (T-1), 2023-24 (T-4) ...
Padeswood Works, Chester Road, Mold, Flintshire, CH7 4HB (5 components)

Site is Load Reduction / DSR Turn Down (3)

Active • 2024-25 (T-1), 2023-24 (T-4) ...
Lochaber Smelter Fort William Scotland PH33 6TH (12 components)

Furnaces (3)

Active • 2024-25 (T-1), 2023-24 (T-4) ...
Sheeplands Farm, Twyford Road, Wargrave, Reading, RG10 8DJ (4 components)
• Water source Heat Pumps at 1748KW each (2)
• Water source Heat Pumps at 1748KW each - located at Horticultural site
Active • 2027-28 (T-4), 2024-25 (T-1) ...
Benfield Way Lakes Road Braintree CM7 3YS (8 components)
• Load reduction. (2)
• Load reduction
Inactive • 2022-23 (T-4), 2022-23 (T-3) ...
Cold Harbour Lane, Rainham, RM13 9YB (11 components)
• Plastics recycling facility located next to material recycling facility comprising several DSR loads: belts, cranes. (2)
• Materials recycling facility comprising several DSR loads: conveyor belts, shredders and cranes.
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
EVESHAM ROAD, BROADWAY, WORCESTERSHIRE, WR12 7PA (8 components)

Load reduction on site supported by non-exporting standby generation. (3)

Active • 2027-28 (T-4), 2026-27 (T-4) ...
195 Aylesone Rd, Leicester LE2 7QJ (18 components)

Office site with behind the meter bio-diesel generation - offsetting site load and exporting surplus (3)

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
McCain - Scarborough, Havers Hill, Eastfield, YO11 3BS (10 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms. (3)

Active • 2026-27 (T-4), 2024-25 (T-4) ...
BRADWELL DBS PUMPING STATION, STRETFIELD, BRADWELL, HOPE VALLEY, DERBYSHIRE, S33 9JT (5 components)

Load reduction on site supported by non-exporting standby generation. (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
British Gas, New Bridge Ln, Stockport, SK1 2GT (8 components)

Office site with behind the meter bio-diesel generation - offsetting site load and exporting surplus (3)

Active • 2026-27 (T-4), 2025-26 (T-4) ...
7 Market Street, Manchester, M1 1WT (9 components)

DSR Component providing load turn down at a retail store (3)

Active • 2024-25 (T-4), 2023-24 (T-4) ...
TH Clements, W End Road, Benington, Boston, PE22 0EJ (6 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms. (3)

Active • 2024-25 (T-4), 2023-24 (T-4) ...
London School of Hygiene & Tropical Medicine Keppel St, Bloomsbury, London WC1E 7HT (5 components)

London School of Hygiene & Tropical Medicine - DSR (3)

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Coldstore 3, Park Road, Holmewood Industrial Park, Chesterfield S42 5UY (8 components)

Mixture of load reduction on flexible electricity consuming processes including refrigeration air-conditioning pumping and lighting and standby generation. (3)

Active • 2025-26 (T-4), 2024-25 (T-4) ...
18-20 Langthwaite Rd, South Kirkby, Pontefract WF9 3AP (7 components)
• Load reduction (2)
• Load shedding
Inactive • 2022-23 (T-4), 2022-23 (T-3) ...
Coldstore 5, 1B Park Road, Holmewood Industrial Park, Chesterfield S42 5UY (8 components)

Load reduction on flexible electricity consuming processes (3)

Active • 2025-26 (T-4), 2024-25 (T-4) ...
North Avenue, Marston Green, Birmingham, B40 1NT (12 components)
• CHP Unit 850kWe proposed to be installed in Hall 6-8 at NEC site
• Gas Generation units at 1013kWe
• Proposed CHP Unit 850kWe to be installed in Hall 6-8 at NEC site
Active • 2024-25 (T-4), 2023-24 (T-4) ...
North Avenue, Marston Green, Birmingham, B40 1NT. (6 components)

Gas Generator - ENER-G 1521 - proposed to be installed on land to the north-east elevation of Hall 5 at the NEC Site. (3)

Active • 2024-25 (T-4), 2023-24 (T-4) ...
Wrexham Industrial Estate Wrexham LL13 9UG (8 components)

Load reduction (3)

Inactive • 2022-23 (T-4), 2022-23 (T-3) ...
133 Balornock Road, Glasgow, G21 3UW (10 components)

Generators on hospital site (3)

Active • 2024-25 (T-1), 2023-24 (T-4) ...
Ribblesdale Cement Works, West Bradford Road, Clitheroe, BB7 4QF (9 components)

Hanson 2 - DSR Turn Down/ Load Reduction (3)

Active • 2024-25 (T-1), 2023-24 (T-4) ...
Coldmove - Oswestry, Glovers Meadow Industrial Estate, Glovers Meadow, Oswestry SY10 8JN, UK (6 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms. (3)

Active • 2024-25 (T-4), 2023-24 (T-4) ...
Loading map...
Showing 25 locations