OCGT and Reciprocating Engines (Fuel Type - Diesel)

25 unique locations (388 components)

Power Station Road Isle of Grain Rochester ME3 0AR (55 components)
• Grain B CCGT Unit 6 Grain B power station provides heat to the Grain LNG regasification facility.
• Grain B CCGT Unit 7 Grain B power station provides heat to the Grain LNG regasification facility.
• Grain B CCGT Unit 8. Grain B power station provides heat to the Grain LNG regasification facility.
• ... and 2 more unique descriptions
Active • 2028-29 (T-4), 2027-28 (T-4) ...
4000.25 MW
Ratcliffe-on-Soar Nottingham NG11 0EE (64 components)
• Ratcliffe U2 OCGT fuelled on Diesel as defined by BS EN590 (3)
• Ratcliffe U4 OCGT fuelled on Diesel as specified by BS EN590 (2)
Active • 2028-29 (T-4), 2027-28 (T-4) ...
472.94 MW
Brentfield Road Willesden London NW10 8JP (22 components)
• Taylor's Lane OCGT GT Unit 2 Unit fuelled by Gas Oil as specified in BS2869 Class A2 (4)
• Taylor's Lane OCGT GT Unit 3 Unit fuelled by Gas Oil as specified in BS 2869 Class A2 (4)
• Taylor's Lane OCGT GT Unit 2 Unit fuelled by Diesel as specified in BS EN590 (3)
• ... and 4 more unique descriptions
Active • 2028-29 (T-4), 2027-28 (T-4) ...
395.55 MW
Stone Pit 1, Cotton Lane, Dartford, Kent DA9 9BB (3 components)
• The site will consist of a number of reciprocating machines - it is currently envisaged that these will be diesel. (2)
• Storage equipment to be installed. The storage asset will be built in an existing building.
Inactive • 2021-22 (T-4), 2018-19 (T-1)
West Thorpe, Willoughby on the Wolds, LE12 6TD - Please see additional information note accompanying connection agreement. (1 component)

Additional capacity alongside other plant at Willoughby. The site generates at unity and therefore a power factor of 1.0 has been used to convert MVA to MW.

Inactive • 2021-22 (T-4)
West Burton A Power Station, West Burton, Retford, Nottinghamshire, DN22 9BL (20 components)
• West Burton A Power Station CMU 1 WA1-17 = 100% (T_WBUPS-1) + 25% (E_WBUPS-STX)
• West Burton A Power Station CMU 2 WA2-17 = 100% (T_WBUPS-2) + 25% (E_WBUPS-STX)
• West Burton A Power Station CMU 3 WA3-17 = 100% (T_WBUPS-3) + 25% (E_WBUPS-STX)
• ... and 2 more unique descriptions
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Harts Farm Way Havant Hampshire PO9 1HS (2 components)
• A new power plant, with associated civil works, switchgear and electrical connection.
• Recently completed power plant, with associated civil works, switchgear and electrical connection.
Inactive • 2018-19 (T-1), 2017-18 (T-1)
Fiddler's Ferry Power Station, Widnes Road, Cuerdley, Warrington, WA5 2UT (86 components)
• GT2
• Generating Unit 1
• Generating Unit 2
• ... and 2 more unique descriptions
Active • 2025-26 (T-4), 2024-25 (T-4) ...
Zone P, Asfordby Business Park, Welby Road, Melton Mowbray, Leicestershire, LE14 3JL (31 components)
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system. (2)
• The CMU will be formed of multiple individual reciprocating generating units controlled centrally and exporting to the distribution system. (2)
• The CMU will be formed of multiple individual reciprocating diesel generating units controlled centrally and exporting to the distribution system.
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Drax Power Station, Drax, Selby, YO8 8PH (20 components)
• This CMU component is a coal-fired boiler turbine unit at Drax Power Station with BMU identifier T_DRAXX-6 under the BSC. (8)
• Generating Unit 4 at the Drax Power Station with BSC ID T_DRAXX-4. (2)
• This CMU component is an open cycle gas turbine unit fuelled by distillate with BMU identifier T_DRAXX-10G under the BSC. (2)
• ... and 1 more unique description
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Monkton Road, Wakefield, Yorkshire, WF2 7AL (13 components)
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system. (2)
• The CMU will be formed of multiple individual reciprocating generating units controlled centrally and exporting to the distribution system. (2)
• The CMU will be formed of multiple individual diesel reciprocating generating units controlled centrally and exporting to the distribution system.
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Trumfleet Generation Site, Marsh Lane, Trumfleet, Doncaster. DN6 0DU (13 components)
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system. (2)
• The CMU will be formed of multiple individual reciprocating generating units controlled centrally and exporting to the distribution system. (2)
• The CMU will be formed of multiple individual diesel reciprocating generating units controlled centrally and exporting to the distribution system.
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Thatcham Grid Substation, Piper's Lane, Off Station Road, Thatcham, RG19 4NA (10 components)
• 6 x reciprocating engines (4)
• Aux. load separately metered
Active • 2025-26 (T-4), 2024-25 (T-4) ...
Knypersley Generation Unit G, Brown Lees Industrial Estate, Knypersley, Staffordshire, ST8 7DN (8 components)
• The CMU Component is made up of brand new gas-fired engines. (3)
• The CMU Component is made up of reciprocating diesel engines. (2)
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
No.1 Maxwell Road Woodston Industrial Estate Peterborough PE2 7JB (6 components)
• A recently completed power plant, with associated civil works, switchgear and electrical connection. (4)
• A power plant, with associated civil works, switchgear and electrical connection.
Active • 2027-28 (T-4), 2026-27 (T-4) ...
Main Ave, Hirwaun, CF44 9UY - Please see additional information note accompanying connection agreements. (1 component)

Additional capacity alongside the long term STOR at Hirwaun & Dowlais. The site generates at unity and therefore a power factor of 1.0 has been used to convert MVA to …

Inactive • 2021-22 (T-4)
TWIN OAKS FARM LAND TO THE EAST OF YELT FARM LOWER STREET DOVERIDGE DE6 5JW (3 components)
• NEW BUILD DIESEL GENERATION STATION
• NEW BUILD GAS FUELLED GENERATING STATION
• NEW BUILD GAS GENERATION STATION
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Pengarnddu Ind Est, Dowlais Top CF48 2TA - Please see additional information note accompanying connection agreements. (1 component)

Additional capacity alongside the long term STOR at Dowlais (Merthyr Tydfil). The site generates at unity and therefore a power factor of 1.0 has been used to convert MVA to …

Inactive • 2021-22 (T-4)
Loading map...
Showing 25 locations