Theme

OCGT and Reciprocating Engines

23 unique locations (408 components)

The Long Barrow, Willesborough, Ashford, Kent. TN24 0GP (16 components)

The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system. (3)

Active • 2026-27 (T-4), 2025-26 (T-4) ...
9.52 MW
No.1 Maxwell Road Woodston Industrial Estate Peterborough PE2 7JB (6 components)
• A recently completed power plant, with associated civil works, switchgear and electrical connection. (2)
• A power plant, with associated civil works, switchgear and electrical connection.
Active • 2027-28 (T-4), 2026-27 (T-4) ...
Centrica Peterborough Power Station, Storeys Bar Road, Peterborough, PE1 5NT. (12 components)

Centrica Peterborough Power Station (PPS) is an Open Cycle Gas Turbine (OCGT) electricity generating station. (3)

Active • 2024-25 (T-4), 2023-24 (T-4) ...
Longridge Road, Preston, Lancashire PR2 5NQ (6 components)

Energy facility comprising of reciprocating engine sets and ancillary equipment. (3)

Active • 2024-25 (T-4), 2023-24 (T-4) ...
Units 1-4, Hirwaun Industrial Estate, Hirwaun, Aberdare, S Wales, CF44 9UY (5 components)
• A new 299MW Open Cycle Gas Turbine peaking plant (2)
• A new Open Cycle Gas Turbine peaking plant
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Aberthaw Power Station The Leys Aberthaw Barry Mid Glamorgan CF62 4ZW (50 components)
• Aberthaw 7 OCGT fuel type distillate
• Aberthaw 8 Coal fired
• Aberthaw 8 OCGT fuel is distillate
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Baglan Bay Power Station Baglan Energy Park Port Talbot SA12 7GE (20 components)
• Existing CCGT Baglan Unit 1 (2)
• Existing BAGE-1 CCGT repowered with new gas turbine and substantial BOP improvements
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Land on the south west of Brigg Road, Scunthorpe, North Lincolnshire, DN16 1AP (13 components)

Multiple gas engines capable of exporting electricity. (3)

Active • 2024-25 (T-4), 2023-24 (T-4) ...
Fiddler's Ferry Power Station, Widnes Road, Cuerdley, Warrington, WA5 2UT (86 components)
• Generating Unit 1
• Generating Unit 2
• Generating Unit 3
Active • 2025-26 (T-4), 2024-25 (T-4) ...
Progress Power Station, Eye Airfield, Diss, Suffolk, IP23 7HE (5 components)
• A new 299MW Open Cycle Gas Turbine (OCGT) power peaking plant (2)
• A new Open Cycle Gas Turbine (OCGT) power peaking plant
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Excalibur Road, Beacons Park, Gorleston, Great Yarmouth, Norfolk NR31 7RQ (10 components)

New build power station comprised of multiple reciprocating engines. (3)

Active • 2024-25 (T-4), 2023-24 (T-4) ...
Trumfleet Generation Site, Marsh Lane, Trumfleet, Doncaster. DN6 0DU (13 components)
• The CMU will be formed of multiple individual diesel reciprocating generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual reciprocating generating units controlled centrally and exporting to the distribution system.
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Meek Street, Royton, Oldham, Lancashire OL2 6HL (6 components)

Energy facility comprising of reciprocating engine sets and ancillary equipment. (3)

Active • 2024-25 (T-4), 2023-24 (T-4) ...
Poole Bank Nurseries , Common Lane, Welton, Hull, HU15 1UT (12 components)
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system. (2)
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Monkton Road, Wakefield, Yorkshire, WF2 7AL (13 components)
• The CMU will be formed of multiple individual diesel reciprocating generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual reciprocating generating units controlled centrally and exporting to the distribution system.
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Zone P, Asfordby Business Park, Welby Road, Melton Mowbray, Leicestershire, LE14 3JL (31 components)
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual reciprocating diesel generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual reciprocating generating units controlled centrally and exporting to the distribution system.
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Loading map...
Showing 23 locations