Home List View Map View Technologies Companies Support Us Help Login Register
Theme

OCGT and Reciprocating Engines

26 unique locations (385 components) - Page 1 of 2

Little Barford Power Station Little Barford St Neots PE19 6YT (22 components)
• Little Barford 1 CCGT MSID: 4052 (3)
• Little Barford 1 OCGT . fuel type is distillate MSID: 4052 (2)
Active • 2028-29 (T-4), 2027-28 (T-4) ...
2060.91 MW
Cowes Power Station Kingston Road East Cowes Isle of Wight PO32 6JS (25 components)
• Cowes 1 - OCGT, fuel is distillate MSID: 4548 (3)
• Cowes 2 - OCGT, fuel is distillate MSID: 4548 (2)
Active • 2028-29 (T-4), 2027-28 (T-4) ...
396.23 MW
Didcot OCGT Power Station Didcot Oxfordshire OX11 7HA (48 components)
• Didcot 1 OCGT - Power factor used for conversion of kVA to MW is 1 Fuel type is distillate MSID: … (2)
• Didcot 2 OCGT - Power factor used for conversion of kVA to MW is 1 . Fuel type is distillate …
• Didcot 3 OCGT - Power factor used for conversion of kVA to MW is 1 . Fuel type is distillate …
• ... and 1 more unique description
Active • 2028-29 (T-4), 2027-28 (T-4) ...
283.02 MW
2 South Wardpark Place, Wardpark, Cumbernauld, Glasgow, North Lanarkshire, G67 3HX (26 components)
• Operational gas reciprocating engine. (3)
• Operational Reciprocating Engine (2)
Active • 2028-29 (T-4), 2027-28 (T-4) ...
22.64 MW
Unit 2, 105 Abercorn Street, Paisley, PA3 4AT (12 components)

Operational reciprocating gas engines (5)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
11.32 MW
Belvedere Nurseries, Belvedere Lane, Watling Street, Fenny Stratford, Milton Keynes, MK17 9JH (3 components)

Energy Centre comprising of Lean Burn, Acoustically Treated Natural Gas Reciprocating Engines. (3)

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
A19 Business Park (Riccall Business Park), Riccall, North Yorkshire YO19 6QR (2 components)

Gas generation peaking plant comprising of 9 x 2MW engines (2)

Inactive • 2022-23 (T-4), 2021-22 (T-4)
Shaw House Farm, Clitheroe Road, Whalley, Clitheroe, BB7 9AD (4 components)

Energy Centre comprising of Lean Burn, Acoustically Treated Natural Gas Reciprocating Engines. (2)

Inactive • 2022-23 (T-4), 2021-22 (T-4)
West Road North, Cross Green, Leeds, West Yorkshire, LS10 1RR (2 components)
• Gas engines in a peaking plant environment
• New gas engines in a peaking plant environment, servicing power generation and DSR.
Inactive • 2022-23 (T-4), 2021-22 (T-4)
Dunnikier Peaking Power, Wheatfield Road, Kirkcaldy. Fife. KY1 3PE (2 components)

The CMU is a new reciprocating engine based gas fuelled generating unit. (2)

Inactive • 2022-23 (T-4), 2021-22 (T-4)
25 Southfield Lingard Lane Stockport SK6 2QN (16 components)

1 x Containerised High Speed Gas-fired reciprocating engines with an output of 2.5MW together with transformers, switchgear and associated control gear (2)

Inactive • 2022-23 (T-4), 2021-22 (T-4)
Bristol Avenue Moor Park Blackpool FY2 0LZ (8 components)

1 x Containerised High Speed Gas-fired reciprocating engines with an output of 2.5MW together with transformers, switchgear and associated control gear (2)

Inactive • 2022-23 (T-4), 2021-22 (T-4)
Ferrybridge Power Station, Stranglands Lane, Knottingley, West Yorkshire, WF11 8SQ (57 components)
• Aux. load separately metered (2)
• GT5
• GT8
• ... and 1 more unique description
Active • 2025-26 (T-4), 2024-25 (T-4) ...
Aberthaw Power Station The Leys Aberthaw Barry Mid Glamorgan CF62 4ZW (50 components)
• Aberthaw 7 OCGT fuel type distillate
• Aberthaw 8 Coal fired
• Aberthaw 8 OCGT fuel is distillate
• ... and 2 more unique descriptions
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Baglan Bay Power Station Baglan Energy Park Port Talbot SA12 7GE (20 components)
• Existing BAGE-1 CCGT repowered with new gas turbine and substantial BOP improvements (2)
• Existing CCGT Baglan Unit 1 (2)
• Existing OCGT module
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Land on the south west of Brigg Road, Scunthorpe, North Lincolnshire, DN16 1AP (13 components)
• Multiple gas engines capable of exporting electricity. (3)
• Gas engine system capable of exporting electricity. (2)
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Longridge Road, Preston, Lancashire PR2 5NQ (6 components)
• Energy facility comprising of reciprocating engine sets and ancillary equipment. (3)
• Battery Storage Facility
• Energy facility comprising of reciprocating engine sets.
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Meek Street, Royton, Oldham, Lancashire OL2 6HL (6 components)
• Energy facility comprising of reciprocating engine sets and ancillary equipment. (3)
• Battery Storage Facility
• Energy facility comprising of reciprocating engine sets.
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Bradford Road Batley Kirklees WF17 6JS (19 components)
• 1 x Containerised High Speed Gas-fired reciprocating engines with an output of 2.5MW together with transformers, switchgear and associated control … (2)
• 20MW of containerised, gas-fired generation together with transformers, switchgear and associated control gear (2)
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
The Power House 38 Haughton Road Darlington DL1 1ST (18 components)
• 1 x Containerised High Speed Gas-fired reciprocating engines with an output of 2.5MW together with transformers, switchgear and associated control … (2)
• 17.5MW of containerised, gas-fired generating capacity together with transformers, switchgear and associated control gear (2)
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Cadeby 1 CMM Generation Garden Lane Cadeby Doncaster DN5 7SN (5 components)
• Gas generating unit(s) (2)
• 1x 2.00MW Containerised Generating sets.
• Gas fired generating sets.
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
GREENMOOR BANK FARM, OLD HUTTON, KENDAL, LA8 0NT (3 components)
• Battery Storage Plant
• Gas peaking reciprocating engine
• Gas peaking reciprocating engines
Inactive • 2022-23 (T-4), 2021-22 (T-4)
Loading map...
Showing 25 locations