Home List View Map View Technologies Companies Support Us Help Login Register
Theme

OCGT and Reciprocating Engines

57 unique locations (713 components) - Page 1 of 3

Cantelo Reception, UK Power Reserve Ltd, Bradon Farm, Isle Abbots, Taunton, Somerset. TA3 6RX (11 components)

The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system. (3)

Active • 2027-28 (T-4), 2026-27 (T-4) ...
16.87 MW
Watson Street Power Station, Burtonhead Road, St Helens, WA9 5EA (15 components)

The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system. (3)

Active • 2027-28 (T-4), 2026-27 (T-4) ...
14.89 MW
13.75 MW
The Long Barrow, Willesborough, Ashford, Kent. TN24 0GP (16 components)

The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system. (3)

Active • 2026-27 (T-4), 2025-26 (T-4) ...
9.52 MW
4 Finway Road Hemel Hempstead HP2 7PT (13 components)

Containerised High Speed Gas-fired reciprocating engines with transformers, switchgear and associated control gear with a total connection capacity of 5MW (3)

Active • 2027-28 (T-4), 2026-27 (T-4) ...
9.48 MW
1A Elms Farm Industrial Estate Edison Road Bedford Bedfordshire MK41 0HU (13 components)

Containerised High Speed Gas-fired reciprocating engines with transformers, switchgear and associated control gear with a total connection capacity of 5MW. (3)

Active • 2027-28 (T-4), 2026-27 (T-4) ...
9.48 MW
Land and Buildings Known as Teres House Copse Road And Land Lying to the North of East Denham Way Fleetwood FY7 7NY (14 components)

Containerised High Speed Gas-fired reciprocating engines with transformers, switchgear and associated control gear (3)

Active • 2027-28 (T-4), 2026-27 (T-4) ...
8.09 MW
Villa Nursery, Reeves Lane, Roydon, Harlow, Essex, CM19 5LE (14 components)

A generating station consisting on multiple reciprocating engines and alternators located on a single site (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
5.35 MW
Fiddler's Ferry Power Station, Widnes Road, Cuerdley, Warrington, WA5 2UT (86 components)
• Generating Unit 1
• Generating Unit 2
• Generating Unit 3
Active • 2025-26 (T-4), 2024-25 (T-4) ...
Units 1-4, Hirwaun Industrial Estate, Hirwaun, Aberdare, S Wales, CF44 9UY (5 components)
• A new 299MW Open Cycle Gas Turbine peaking plant (2)
• A new Open Cycle Gas Turbine peaking plant
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Aberthaw Power Station The Leys Aberthaw Barry Mid Glamorgan CF62 4ZW (50 components)
• Aberthaw 7 OCGT fuel type distillate
• Aberthaw 8 Coal fired
• Aberthaw 8 OCGT fuel is distillate
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Baglan Bay Power Station Baglan Energy Park Port Talbot SA12 7GE (20 components)
• Existing CCGT Baglan Unit 1 (2)
• Existing BAGE-1 CCGT repowered with new gas turbine and substantial BOP improvements
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Grimsby Power Station Moody Lane Grimsby DN31 2SW (9 components)

CMU will be formed of multiple individual gas reciprocating engine units (3)

Active • 2025-26 (T-4), 2024-25 (T-4) ...
Longridge Road, Preston, Lancashire PR2 5NQ (6 components)

Energy facility comprising of reciprocating engine sets and ancillary equipment. (3)

Active • 2024-25 (T-4), 2023-24 (T-4) ...
Garden Lane, Cadeby, Doncaster, DN5 7SN (4 components)

Gas fired generating engines (3)

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Prospect House Sandycroft Deeside CH5 2QJ (8 components)
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant (2)
• Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Knypersley Generation Unit G, Brown Lees Industrial Estate, Knypersley, Staffordshire, ST8 7DN (8 components)
• The CMU Component is made up of brand new gas-fired engines. (2)
• The CMU Component is made up of reciprocating diesel engines.
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Bradford Road Batley Kirklees WF17 6JS (19 components)
• 20MW of containerised, gas-fired generation together with transformers, switchgear and associated control gear (2)
• 1 x Containerised High Speed Gas-fired reciprocating engines with an output of 2.5MW together with transformers, switchgear and associated control …
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Scawby Brook, Brigg, Lincolnshire DN20 9LT (5 components)

A Prospective New Build Gas reciprocating energy reserve facility (3)

Active • 2024-25 (T-4), 2023-24 (T-4) ...
Foresterhill Health Campus, Aberdeen AB25 2AY (5 components)

A gas turbine installed at Aberdeen Royal Infirmary (3)

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Land on the south west of Brigg Road, Scunthorpe, North Lincolnshire, DN16 1AP (13 components)

Multiple gas engines capable of exporting electricity. (3)

Active • 2024-25 (T-4), 2023-24 (T-4) ...
Loading map...
Showing 25 locations