Home List View Map View Technologies Companies Support Us Help Login Register
Theme

Reciprocating engines

28 unique locations (287 components) - Page 1 of 2

Pye Bridge Industrial Estate, Somercotes, Alfreton, DE55 4NX (9 components)
• Reciprocating gas engines running on natural gas (2)
• Additional reciprocating gas engines running on natural gas returned to service
Active • 2027-28 (T-4), 2026-27 (T-4) ...
10.24 MW
Rockingham South, Smoke Land, Avonmouth BS11 0YT (5 components)
• 3 x 2MW OCGT gas reciprocating engines
• 4 x 2MW OCGT gas reciprocating engines
• 5 x 2MW OCGT gas engines The CMU will using the existing grid connection point use ty the connected CMUs …
Active • 2027-28 (T-4), 2021-22 (T-4) ...
9.44 MW
Radstone Rd, Radstone, Brackley NN13 5PY (5 components)
• A new build diesel or gas grid support plant
• An Existing diesel grid support plant
• An Exiting diesel grid support plant
Active • 2025-26 (T-1), 2024-25 (T-1) ...
4.68 MW
Chesterfield Road, Swallownest, Sheffield, S26 4SX (2 components)
• Gas fired reciprocating engines
• New Build Generating CMU comprising of battery storage and associated plant.
Active • 2026-27 (T-4), 2021-22 (T-4)
2.84 MW
Bristol Royal Infirmary, Marlborough Hill, Bristol, BS2 8HW (6 components)

1 * 1.7MW diesel reciprocating engine (3)

Active • 2026-27 (T-4), 2025-26 (T-4) ...
1.46 MW
Bristol Royal Infirmary, Marlborough Hill, Bristol, BS2 8HW (6 components)

1 * 1.7MW diesel reciprocating engine (3)

Active • 2026-27 (T-4), 2025-26 (T-4) ...
1.45 MW
Bristol Royal Infirmary, Marlborough Hill, Bristol, BS2 8HW (6 components)

1 * 1.7MW diesel reciprocating engine (3)

Active • 2026-27 (T-4), 2025-26 (T-4) ...
1.45 MW
Bristol Royal Infirmary, Marlborough Hill, Bristol, BS2 8HW (6 components)

1 * 1.7MW diesel reciprocating engine (3)

Active • 2026-27 (T-4), 2025-26 (T-4) ...
1.45 MW
Aberthaw Power Station The Leys Aberthaw Barry Mid Glamorgan CF62 4ZW (50 components)
• Aberthaw 7 OCGT fuel type distillate
• Aberthaw 8 Coal fired
• Aberthaw 8 OCGT fuel is distillate
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Baglan Bay Power Station Baglan Energy Park Port Talbot SA12 7GE (20 components)
• Existing CCGT Baglan Unit 1 (2)
• Existing BAGE-1 CCGT repowered with new gas turbine and substantial BOP improvements
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Land on the south west of Brigg Road, Scunthorpe, North Lincolnshire, DN16 1AP (13 components)

Multiple gas engines capable of exporting electricity. (3)

Active • 2024-25 (T-4), 2023-24 (T-4) ...
Progress Power Station, Eye Airfield, Diss, Suffolk, IP23 7HE (5 components)
• A new 299MW Open Cycle Gas Turbine (OCGT) power peaking plant (2)
• A new Open Cycle Gas Turbine (OCGT) power peaking plant
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Bones lane, Cheddleton, Leek, Staffordshire, ST13 7BT (6 components)

1.9 MW Gas gen ENER-G 1999 (3)

Active • 2025-26 (T-4), 2024-25 (T-4) ...
Trumfleet Generation Site, Marsh Lane, Trumfleet, Doncaster. DN6 0DU (13 components)
• The CMU will be formed of multiple individual diesel reciprocating generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual reciprocating generating units controlled centrally and exporting to the distribution system.
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Meek Street, Royton, Oldham, Lancashire OL2 6HL (6 components)

Energy facility comprising of reciprocating engine sets and ancillary equipment. (3)

Active • 2024-25 (T-4), 2023-24 (T-4) ...
Poole Bank Nurseries , Common Lane, Welton, Hull, HU15 1UT (12 components)
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system. (2)
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Faraday Road, Plymouth, PL4 0ST (7 components)
• Gas fired reciprocating engines. (2)
• Reciprocating Engines
Active • 2024-25 (T-4), 2021-22 (T-4) ...
Monkton Road, Wakefield, Yorkshire, WF2 7AL (13 components)
• The CMU will be formed of multiple individual diesel reciprocating generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual reciprocating generating units controlled centrally and exporting to the distribution system.
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Zone P, Asfordby Business Park, Welby Road, Melton Mowbray, Leicestershire, LE14 3JL (31 components)
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual reciprocating diesel generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual reciprocating generating units controlled centrally and exporting to the distribution system.
Active • 2024-25 (T-4), 2023-24 (T-4) ...
No.1 Maxwell Road Woodston Industrial Estate Peterborough PE2 7JB (6 components)
• A recently completed power plant, with associated civil works, switchgear and electrical connection. (2)
• A power plant, with associated civil works, switchgear and electrical connection.
Active • 2027-28 (T-4), 2026-27 (T-4) ...
Aspatria Business Park, Park Road, Aspatria, Cumbria, CA7 3DP (2 components)
• A gas fuelled electrical power generating unit comprising multiple reciprocating engines
• New build power station comprised of multiple reciprocating engines
Active • 2024-25 (T-4), 2021-22 (T-4)
Land at Fulwood Rd North, Sutton-in-Ashfield, NG17 2NB (19 components)
• Battery storage unit (2)
• New reciprocating gensets in acoustic enclosure
Active • 2025-26 (T-4), 2023-24 (T-4) ...
Loading map...
Showing 25 locations