Home List View Map View Technologies Companies Support Us Help Login Register
Theme

Reciprocating engines

58 unique locations (317 components) - Page 1 of 3

Scawby Brook, Scawby, Brigg, DN20 9LT. (3 components)

Brigg Gas Peaker (3)

Active • 2026-27 (T-4), 2025-26 (T-1) ...
90.56 MW
Old Littleton Road, Chertsey, Surrey, TW17 9NU (4 components)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
45.79 MW
Rectory Field, Cards Road, Sandon, CM2 7AE (6 components)
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant (2)
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant.
Active • 2027-28 (T-4), 2026-27 (T-4) ...
23.15 MW
Ellifoot Lane, Burstwick, HU12 9EB (5 components)
• a Combined Heat and Power Plant (2)
• A Distribution Connected 4.5MW gas fueled generating station
Active • 2028-29 (T-4), 2027-28 (T-4) ...
19.54 MW
Rhodesia Power Limited, Highgrounds Industrial Estate Highgrounds road, Rhodesia, Worksop, S80 3AT (4 components)

The CMU component consist of gas fired reciprocating engines, organic rankine cycle turbines and stack gas-recovery carbon capture to be installed on designated land at Rhodesia Power Limited, Highgrounds Industrial … (3)

Active • 2026-27 (T-4), 2025-26 (T-1) ...
18.87 MW
Howard Road, Park Farm Industrial Estate, Redditch, B98 7SE (4 components)

Redditch 20MW Gas Peaker Project (3)

Active • 2026-27 (T-4), 2024-25 (T-1) ...
18.85 MW
Land at Enterprise Court, Corby, NN18 8ES (35 components)

Reciprocating genset (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
18.62 MW
Drake Grove, Burndell Road, Yapton, Arundel, BN18 0HX (4 components)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant (3)

Active • 2026-27 (T-4), 2025-26 (T-1) ...
13.58 MW
Wallingford Road, Goring, Reading, RG8 0HS (3 components)

A 6.9MW gas fuelled generating station. (3)

Active • 2026-27 (T-4), 2025-26 (T-1) ...
13.02 MW
3 Nairn Road, Deans Industrial Estate, Livingston, West Lothian, EH54 8AY (8 components)
• Newbuild gas generator
• Reciprocating engine (natural gas fuelled)
• gas generator
Active • 2026-27 (T-4), 2025-26 (T-1) ...
12.60 MW
Pye Bridge Industrial Estate, Somercotes, Alfreton, DE55 4NX (9 components)
• Reciprocating gas engines running on natural gas (2)
• Additional reciprocating gas engines running on natural gas returned to service
Active • 2027-28 (T-4), 2026-27 (T-4) ...
10.24 MW
Land at Wolverhampton Road, Oldbury, B69 4RJ (7 components)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant (3)

Active • 2025-26 (T-4), 2024-25 (T-4) ...
9.52 MW
Rochester Power Generation Plant, Whitewall Road, Medway City Estate, Rochester, Kent, ME2 4DZ (8 components)
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant (2)
• Existing Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Active • 2026-27 (T-4), 2025-26 (T-1) ...
9.43 MW
Bentinck Generating Station, Mill Lane, Nottinghamshire NG17 9LJ (4 components)
• An electrical power generating unit comprised of multiple gas reciprocating engines with an aggregated exporting capacity totalling 4.5MW. (2)
• A 7.5MW new build gas generating station..
Active • 2027-28 (T-4), 2025-26 (T-1) ...
8.45 MW
Wellington Street, Oldham, Lancashire OL4 1SA (7 components)
• Energy facility comprising of battery energy storage sets and ancillary equipment. (2)
• Energy facility comprising of reciprocating engine sets and ancillary equipment.
Active • 2026-27 (T-4), 2024-25 (T-4) ...
7.09 MW
Land off Axe Road, Colley Lane Industrial Estate, Bridgwater, TA6 5LP (7 components)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant (3)

Active • 2025-26 (T-4), 2024-25 (T-4) ...
6.85 MW
Grain Road Isle of Grain Rochester ME3 0AB (5 components)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant (3)

Active • 2025-26 (T-4), 2024-25 (T-1) ...
6.66 MW
Dewi Road, Tregaron, SY25 6JP (2 components)

STOR diesel engines that will operate environmentally with mixed fuel (2)

Active • 2025-26 (T-1), 2024-25 (T-1)
6.18 MW
5.97 MW
Radstone Rd, Radstone, Brackley NN13 5PY (5 components)
• A new build diesel or gas grid support plant
• An Existing diesel grid support plant
• An Exiting diesel grid support plant
Active • 2025-26 (T-1), 2024-25 (T-1) ...
4.68 MW
46 Station Road Stokesley Middlesbrough TS9 7AA (10 components)
• Gas CHP engines in commercial horticultural usage with no auxilliary load (2)
• 2 x 2.25 Gas reciprocating engines to be installed at Cleveland Nurseries (replacing existing CHP)
Active • 2027-28 (T-4), 2025-26 (T-4) ...
4.25 MW
Land On The North Side Of Kerfoot Street Warrington, WA2 8NT (5 components)

CMU consisting of multiple reciprocating engines and alternators (3)

Active • 2026-27 (T-4), 2025-26 (T-4) ...
3.86 MW
Aveley Landfill Site, Sandy Lane, Aveley, RM15 4XP (5 components)

Gas reciprocating engines (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
3.68 MW
Guernsey Road, Bletchley, Milton Keynes, Buckinghamshire, MK3 5FR (7 components)

Gas reciprocating engines (3)

Active • 2027-28 (T-4), 2024-25 (T-1) ...
3.50 MW
Loading map...
Showing 25 locations