Reciprocating engines

33 unique locations (298 components) - Page 1 of 2

land at Walton Common north of the National Grid Substation, Fort Road, Tilbury, RM18 8UL. (6 components)
• Gas reciprocating engines
• Thurrock Power Limited has secured a "blue chip" manufacturer as the EPC contractor to engineer, procure and construct a battery …
• Thurrock Power Limited has secured a "blue chip" manufacturer as the EPC contractor to engineer, procure and construct a gas …
Active • 2027-28 (T-4), 2026-27 (T-4) ...
817.08 MW
Ratcliffe-on-Soar Nottingham NG11 0EE (64 components)
• Ratcliffe U2 OCGT fuelled on Diesel as defined by BS EN590 (2)
• Ratcliffe U4 OCGT fuelled on Diesel as specified by BS EN590
Active • 2028-29 (T-4), 2027-28 (T-4) ...
472.94 MW
Scawby Brook, Scawby, Brigg, DN20 9LT. (3 components)

Brigg Gas Peaker (3)

Active • 2026-27 (T-4), 2025-26 (T-1) ...
90.56 MW
Felindre Road, Pencoed, Brigend, CF35 5HU (1 component)

New build 40MW gas Peaker plant

Active • 2025-26 (T-1)
37.21 MW
Land at Legacy Substation, Bronwylfa Road, Legacy, Wrexham, LL14 4HY (3 components)
• A Battery Energy Storage System (2)
• A gas fuelled generating station.
Active • 2026-27 (T-4), 2025-26 (T-1) ...
28.95 MW
Rectory Field, Cards Road, Sandon, CM2 7AE (6 components)
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant (2)
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant.
Active • 2027-28 (T-4), 2026-27 (T-4) ...
23.15 MW
Land at Fordbridge Lane, Blackwell, DE55 5JY. (21 components)

Reciprocating genset (3)

Active • 2027-28 (T-4), 2026-27 (T-4) ...
20.32 MW
Ellifoot Lane, Burstwick, HU12 9EB (5 components)
• a Combined Heat and Power Plant (2)
• A Distribution Connected 4.5MW gas fueled generating station
Active • 2028-29 (T-4), 2027-28 (T-4) ...
19.54 MW
Rhodesia Power Limited, Highgrounds Industrial Estate Highgrounds road, Rhodesia, Worksop, S80 3AT (4 components)

The CMU component consist of gas fired reciprocating engines, organic rankine cycle turbines and stack gas-recovery carbon capture to be installed on designated land at Rhodesia Power Limited, Highgrounds Industrial … (3)

Active • 2026-27 (T-4), 2025-26 (T-1) ...
18.87 MW
1 Maxwell Road, Woodston Industrial Estate, Peterborough PE2 7JB (4 components)
• This CMU is 10*2MW reciprocating engines using HVO.
• This CMU is 10*2MW reciprocating engines.
• This CMU is 6*2MW reciprocating engines.
Active • 2027-28 (T-4), 2026-27 (T-4) ...
18.70 MW
Land at Enterprise Court, Corby, NN18 8ES (35 components)

Reciprocating genset (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
18.62 MW
18.51 MW
Welkin Road, Bredbury, SK6 2BH (6 components)
• Battery Energy Storage System (2)
• A gas fuelled generating station.
Active • 2026-27 (T-4), 2025-26 (T-1) ...
16.07 MW
14.79 MW
Pye Bridge Industrial Estate, Pye Bridge, Somercotes, Alfreton DE55 4NX (2 components)

Gas fired peaking power plant (2)

Active • 2028-29 (T-4), 2025-26 (T-1)
14.56 MW
Bentinck Generating Station, Mill Lane, Nottinghamshire NG17 9LG (2 components)

A 7.5MW new build gas generating station.. (2)

Active • 2026-27 (T-4), 2025-26 (T-1)
14.15 MW
Kingdom Avenue, Westbury, Wiltshire, BA13 4FG (2 components)

A gas fuelled electrical power generating unit comprising multiple reciprocating engines (2)

Active • 2026-27 (T-4), 2025-26 (T-1)
13.67 MW
Drake Grove, Burndell Road, Yapton, Arundel, BN18 0HX (4 components)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant (3)

Active • 2026-27 (T-4), 2025-26 (T-1) ...
13.58 MW
Rhymney STOR Gen Room Unit 48 Portmanmoor Road Industrial Estate Rover Way Cardiff CF24 5HB (3 components)

Gas reciprocating engines (3)

Active • 2028-29 (T-4), 2025-26 (T-1) ...
13.56 MW
Wallingford Road, Goring, Reading, RG8 0HS (3 components)

A 6.9MW gas fuelled generating station. (3)

Active • 2026-27 (T-4), 2025-26 (T-1) ...
13.02 MW
3 Nairn Road, Deans Industrial Estate, Livingston, West Lothian, EH54 8AY (8 components)
• Newbuild gas generator
• Reciprocating engine (natural gas fuelled)
• gas generator
Active • 2026-27 (T-4), 2025-26 (T-1) ...
12.60 MW
Maybrook Road, Maybrook Business Park, Minworth, Sutton Coldfield, West Midlands, B76 1AL (1 component)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Active • 2025-26 (T-1)
11.87 MW
Hoon Hay Manor, Marston Lane, Hatton, Derby, DE65 5EA (14 components)

Reciprocating genset (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
11.06 MW
Rochester Power Generation Plant, Whitewall Road, Medway City Estate, Rochester, Kent, ME2 4DZ (8 components)
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant (2)
• Existing Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Active • 2026-27 (T-4), 2025-26 (T-1) ...
9.43 MW
Loading map...
Showing 25 locations