Solar Photovoltaic

22 unique locations (58 components)

Vicarage Drove, Bicker CP, Boston, Lincolnshire, England, PE20 3BQ, United Kingdom (3 components)
• New build 49.995MW / 99.990 MWh battery energy storage system. (2)
• New build CMU. A co-located battery and solar PV site, with a solar generation capacity of 70MW and a shared …
Active • 2027-28 (T-4), 2025-26 (T-1)
14.67 MW
Higglers Farm, Titchfield Lane, Wickham, Hampshire, PO17 5PQ (2 components)
• New Build CMU comprising of Solar PV and associated plant
• New Build CMU comprising of battery storage and associated plant
Active • 2028-29 (T-4), 2027-28 (T-4)
8.48 MW
Ellbridge Lane, Ellbridge, Landulph, Saltash, Cornwall, PL12 6PU (2 components)

New Build CMU comprising of Solar PV and associated plant (2)

Active • 2028-29 (T-4), 2027-28 (T-4)
6.30 MW
Land to the North of Tye Lane, Ipswich, IP8 4NP (4 components)

CMU is a photovoltaic system (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
5.92 MW
Land At Glassthorpe Hill & Land Off Brington Road Flore Northamptonshire, NN7 3NF (2 components)

CMU is a photovoltaic system (2)

Active • 2028-29 (T-4), 2027-28 (T-4)
5.17 MW
Belville Farm, Coldstream, Berwickshire, TD12 4JB (2 components)

New Build CMU comprising of Solar PV and associated plant (2)

Active • 2028-29 (T-4), 2027-28 (T-4)
5.08 MW
Land adjacent Electricity Substation, Clay Hill Pit, Dormington, Hereford, Herefordshire, HR1 4EP (5 components)

New Build CMU comprising of Solar PV and associated plant (3)

Active • 2027-28 (T-4), 2026-27 (T-4) ...
4.22 MW
Land off torkington road, Hazel Grove, Greater Manchester, SK7 6NW (2 components)

New Build CMU comprising of Solar PV and associated plant (2)

Active • 2028-29 (T-4), 2027-28 (T-4)
3.78 MW
land at Keelings Road, Southminster, CM0 7JF (4 components)
• New build generating CMU component known as Dengie BESS (2)
• New build generating CMU component known as Dengie Solar Park
Active • 2027-28 (T-4), 2025-26 (T-1)
3.33 MW
Littleton Pastures Solar, Lakeshill Road, Worcestershire, WR118TS (2 components)

The CMU is a solar photovoltaic System with a planned 31MW maximum installation, consisting of solar panels. With a grid export capacity of 22MVA.. (2)

Active • 2027-28 (T-4), 2026-27 (T-4)
2.49 MW
Bakers Road, Belchamp St Paul, Essex, CO10 7DF. (1 component)

New build generating CMU component - solar photovoltaic solar park known as Knowl Green Solar Park

Active • 2027-28 (T-4)
2.38 MW
Manor Farm, Burnett, Keynsham, Bristol, Somerset, BS31 2ED (2 components)

New Build CMU comprising of Solar PV and associated plant (2)

Active • 2028-29 (T-4), 2027-28 (T-4)
2.21 MW
Whaddon Farm, Hilperton, Wiltshire, BA14 6NR. (4 components)
• New build generating CMU component - solar photovoltaic park known as Whaddon Farm Solar Park. (2)
• New build generating CMU component - Whaddon Farm BESS
Active • 2027-28 (T-4), 2024-25 (T-1)
1.99 MW
Tarmac Quarry, Whisby, Lincoln, Lincolnshire, LN6 9BT (4 components)

New Build CMU comprising of Solar PV and associated plant (2)

Active • 2028-29 (T-4), 2027-28 (T-4)
1.59 MW
Land At, Elms Farm, Newbold Road, Newbold Pacey, Warwickshire, CV35 9DP (1 component)

A Solar site that will be situated on 5 fields and comprise of mounted Silicon PV panels, String Inverters and Transformers. The PV panels will produce DC electricity, which will …

Active • 2027-28 (T-4)
1.27 MW
Ling Hall Coalpit Lane Lawford Heath Rugby Warwickshire CV23 9HH (6 components)

SolarPV generating station (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
1.20 MW
Ducklington Farm Course Hill Lane Ducklington Witney OX29 7YL (1 component)

A Solar site that will be situated on approximately 46 Hectares of land and comprise of mounted Silicon PV panels, String Inverters and Transformers. The PV panels will produce DC …

Active • 2027-28 (T-4)
1.14 MW
Offham Landfill Site, Teston Road, Offham, West Malling, Kent, ME19 5PF (4 components)

Solar PV generation site (3)

Active • 2027-28 (T-4), 2025-26 (T-4) ...
1.00 MW
0.89 MW
Boston Landfill Site, Slippery Gowt Lane, Wyberton, Boston, Lincolnshire, PE21 7AA (4 components)

Solar PV generation site (3)

Active • 2027-28 (T-4), 2025-26 (T-4) ...
0.89 MW
Wraxall Manor Farm, Wraxall, Dorset, DT2 0HW. (1 component)

New build generating CMU component - solar photovoltaic park known as Higher Wraxall Solar Park

Active • 2027-28 (T-4)
0.64 MW
Loading map...
Showing 22 locations