Home List View Map View Technologies Companies Support Us Help Login Register
Theme

Storage (Duration 0.5h)

17 unique locations (87 components)

West Burton B Power Station, West Burton, Retford, Nottinghamshire, DN22 9BL (22 components)
• West Burton B Power Station CMU 1 WB1-24= 100% T_WBURB-1
• West Burton B Power Station CMU 2 WB2-24= 100% T_WBURB-2
• West Burton B Power Station CMU 3 WB3-24= 100% T_WBURB-3
Active • 2028-29 (T-4), 2027-28 (T-4) ...
3608.42 MW
Pen-y-Cymoedd Wind Farm, Treherbert Road, Treherbert, Treorchy. Rhondda Cynon Taf. South Wales CF42 5SX (10 components)

A new build 22 MW battery storage facility. Comprising of five containerised battery units, ten inverter banks (2 per battery container), associated 33kV transformers, switchgear and cabling. (3)

Inactive • 2023-24 (T-1), 2022-23 (T-1) ...
1.30 MW
Stevensons Farm, Arterial Road, Nevendon, Essex SS14 3JH (9 components)

Lithium Ion battery storage system capable of charging, storing and discharging electricity. Land at Stevensons Farm, Arterial Road, Nevendon, Essex SS14 3JH. (3)

Active • 2025-26 (T-4), 2024-25 (T-1) ...
Land at Huggins Hall Farm, Turnden Road, Hartley, Kent, TN17 2QJ (6 components)

Lithium Ion battery storage system capable of importing, storing and exporting electricity. (3)

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Gateway Crescent, Oldham, Lancashire, OL9 8AU. (2 components)

The CMU comprises of Lithium Ion batteries housed in ISO containers with additional containers used to house the converters. (2)

Inactive • 2022-23 (T-4), 2021-22 (T-4)
Amersham Road Denham Buckinghamshire SL9 7AW (5 components)

A new power plant, with associated civil works, switchgear and electrical connection. (3)

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Carnegie Road, Liverpool, L13 7HY. (3 components)

The CMU comprises Lithium Ion batteries housed in ISO containers with additional containers used to house the converters. (3)

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
35 Arkwright Road, Astmoor, Runcorn, WA7 1NU. (2 components)

The batteries are housed within racks and installed, together with converters, inside an existing building. The batteries will be installed in the racks off-site and then delivered to site ready … (2)

Inactive • 2022-23 (T-4), 2021-22 (T-4)
ROSSIDE FARM ROSSIDE ULVERSTON LA12 7SE (2 components)

NEW BUILD BATTERY STORAGE STATION (2)

Inactive • 2022-23 (T-4), 2021-22 (T-4)
Thames Water Sewage Treatment Works Ducklington Lane Witney OX28 5JH (2 components)

A new power plant, with associated civil works, switchgear and electrical connection. (2)

Inactive • 2022-23 (T-4), 2021-22 (T-4)
Stanstead Abbots Ware Hertfordshire SG12 8JY (3 components)

A new power plant, with associated civil works, switchgear and electrical connection. (3)

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Albion Road, Dartford, Kent, DA1 5PZ (6 components)

battery storage (3)

Inactive • 2021-22 (T-4), 2019-20 (T-1) ...
Land at Lookabootye Broxburn West Lothian EH52 5PD (4 components)
• Operational battery (2)
• New build battery
Inactive • 2021-22 (T-4), 2020-21 (T-1) ...
Lower Road, Brentwood, CM13 1BZ (2 components)
• Advanced battery energy storage system
• New Build Generation CMU, advanced battery energy storage system
Inactive • 2021-22 (T-4), 2019-20 (T-1)
SWEB Estate, Romney Avenue, Lockleaze, Bristol, BS7 9ST (3 components)

battery storage (3)

Inactive • 2021-22 (T-4), 2019-20 (T-1) ...
Roundponds Farm Shurnold Melksham Wiltshire SN12 8DF (3 components)
• A 10MW New Build Battery Storage Site (2)
• A 10MW Existing Generating Battery Storage Site
Inactive • 2021-22 (T-4), 2019-20 (T-1) ...
Hawthorne Road, Bootle, Merseyside, L20 5AG. (3 components)

The CMU comprises Lithium Ion batteries housed in ISO containers with additional containers used to house the converters. (3)

Active • 2024-25 (T-4), 2022-23 (T-4) ...
Loading map...
Showing 17 locations