Home List View Map View Technologies Companies Support Us Help Login Register
Theme

Storage (Duration 1.5h)

21 unique locations (50 components)

Redditch Generation Station, Windsor Road, Redditch, B97 6HE (5 components)
• Gas reciprocating engines as the generating unit. (2)
• Battery Storage Station
• Open cycle gas turbine as the generating unit.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
68.21 MW
Camsiscan Farm, Craigie, South Ayrshire, Scotland, KA1 5JT (4 components)
• An 87.500 MW Battery Storage Site Component.
• An 87.500 MW New Build Battery Storage Site Component
• An 87.500 MW New Build Battery Storage Site Component.
Active • 2028-29 (T-4)
55.20 MW
LAND SOUTH OF WAKEFIELD B SUBSTATION AND EAST OF NEIL FOX WAY, WAKEFIELD, WF1 5DB (3 components)
• A new build battery energy storage system (2)
• A new build 99.9MW battery energy storage system
Active • 2028-29 (T-4), 2027-28 (T-4) ...
45.77 MW
Land to the East of Bumble Bee Farm Gainsborough Road (A620) Saundby DN22 9ER (2 components)
• A 110.000 MW / 165.000 MWh battery energy storage system
• A 120.000 MW / 180.000 MWh battery energy storage system
Active • 2028-29 (T-4), 2027-28 (T-4)
31.60 MW
LAND EAST OF HOLMFIELD LANE, CASTLEFORD, WF11 8SF (4 components)
• New Build Battery Energy Storage system (2)
• New Build 49.99 MW Battery Energy Storage system
Active • 2028-29 (T-4), 2027-28 (T-4) ...
30.54 MW
Land to the North and East of Flatworth Substation, High Flatworth, North Shields, NE29 7SU (4 components)
• New Build Battery Energy Storage system (2)
• New Build 49.5 MW Battery Energy Storage system
Active • 2028-29 (T-4), 2027-28 (T-4) ...
30.45 MW
Richborough Energy Park, Ramsgate Road, Sandwich, England CT13 9NL (1 component)

New Build Battery Energy Storage System

Active • 2028-29 (T-4)
27.37 MW
LAND SOUTH OF GUNTHORPE ROAD, WALPOLE MARSH, WISBECH, NEAR PE14 7JH (2 components)

A 100.000 MW / 150.000 MWh battery energy storage system (2)

Active • 2028-29 (T-4), 2027-28 (T-4)
27.29 MW
LAND TO THE REAR OF HUMBERSTON SUBSTATION, HUMBERSTON, DN36 4RJ (3 components)
• New Build Battery Energy Storage system (2)
• New Build 49.9MW Battery Energy Storage system
Active • 2028-29 (T-4), 2027-28 (T-4) ...
22.77 MW
Land at Hydes Lane, Hinckley, LE10 3DP (2 components)
• A Distribution Connected Battery Energy Storage System
• The CMU comprises lithium ion batteries housed in ISO containers with additional containers used to house the converters
Active • 2028-29 (T-4), 2027-28 (T-4)
16.07 MW
Minchens Lane Bramley RG7 2NL (2 components)

A 57.000 MW / 85.500 MWh battery energy storage system (2)

Active • 2028-29 (T-4), 2027-28 (T-4)
15.56 MW
Land West of Honiley Road (A4177), Honiley, Kenilworth, CV35 7LY (2 components)

A 57.000 MW / 85.500 MWh battery energy storage system (2)

Active • 2028-29 (T-4), 2027-28 (T-4)
15.56 MW
15.46 MW
Blackford, Aberdeenshire, AB51 8YN (2 components)

A 50MW New Build Battery Storage Site (2)

Active • 2028-29 (T-4), 2027-28 (T-4)
13.65 MW
Atcost Road, Barking Riverside, London, England, IG11 0EQ (1 component)

Battery energy storage system

Active • 2028-29 (T-4)
12.87 MW
Land north of Coxmoor Wood, off Crondall Road, Crookham Village, Fleet, GU51 5SU (2 components)
• A 46.000 MW / 69.00 MWh battery energy storage system
• A 47.500 MW / 71.250 MWh battery energy storage system
Active • 2028-29 (T-4), 2027-28 (T-4)
12.79 MW
McQuittiston Farm, A70, Ochiltree, East Ayrshire, Scotland, KA6 6NF (2 components)
• A Distribution Connected Battery Energy Storage System
• The CMU comprises lithium ion batteries housed in ISO containers with additional containers used to house the converters
Active • 2028-29 (T-4), 2027-28 (T-4)
9.71 MW
Land east of Nailcote Farm, Burton Green, Berkswell, Coventry, CV7 7DE (1 component)

49.9MW lithium ion battery energy storage located at Berkswell near Coventry

Active • 2028-29 (T-4)
7.87 MW
Kilwinning, North Ayrshire, Scotland, KA13 7RU, United Kingdom (1 component)

Battery energy storage system

Active • 2028-29 (T-4)
4.71 MW
Unit 1b, Britannia Industrial Estate, Union Road, Bolton, BL2 2HP (5 components)
• Battery Storage Station (3)
• 3 x 2MW gas gen sets
Active • 2028-29 (T-4), 2027-28 (T-4) ...
1.88 MW
Loading map...
Showing 21 locations