Theme

Storage (Duration 1h)

5 unique locations (62 components)

Lascar Works, Tanpits Road, Bury, BL9 5BY (8 components)
• Battery storage located at Lascar Works, Tanpits Road, Bury, BL9 5BY with a nameplate capacity of 20.000 MW. Connection capacity … (3)
• 20.000MW of storage located at Lascar Works, Tanpits Road, Bury, BL9 5BY (2)
Active • 2028-29 (T-4), 2027-28 (T-4) ...
4.10 MW
Slamseys Farm, Blackley Lane, Great Notley, CM77 7QW (9 components)
• 5MW, 1 hour/5MWh lithium-ion battery (4)
• Slamseys is a 5MW (import and export) battery energy storage project. The project consists of containerised Inverters, containerised Li-Ion batteries, …
Active • 2024-25 (T-4), 2023-24 (T-1) ...
0.93 MW
Zone P, Asfordby Business Park, Welby Road, Melton Mowbray, Leicestershire, LE14 3JL (31 components)
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system. (2)
• The CMU will be formed of multiple individual reciprocating generating units controlled centrally and exporting to the distribution system. (2)
• The CMU will be formed of multiple individual reciprocating diesel generating units controlled centrally and exporting to the distribution system.
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Brotherton Weir, Knottingley West Yorkshire WF11 8HR (7 components)
• 1.200MW Battery Energy Storage System (3)
• 1.2 MW of demand reduction
• The CMU component at Knottingley is an energy storage system comprised of Lithium-ion batteries. The system will have a 1.2 …
Active • 2025-26 (T-4), 2024-25 (T-4) ...
Thrybergh Weir Kilnhurst Mexborough South Yorkshire S64 5TJ (7 components)
• 1.200MW Battery Energy Storage System (3)
• 1.200 MW of demand reduction
• The CMU component at Thrybergh is an energy storage system comprised of Lithium-ion batteries. The system will have a 1.2 …
Active • 2025-26 (T-4), 2024-25 (T-4) ...
Loading map...
Showing 5 locations