Home List View Map View Technologies Companies Support Us Help Login Register
Theme

Storage (Duration 1h)

9 unique locations (59 components)

Pen-y-Cymoedd Wind Farm, Treherbert Road, Treherbert, Treorchy. Rhondda Cynon Taf. South Wales CF42 5SX (10 components)

A new build 22 MW battery storage facility. Comprising of five containerised battery units, ten inverter banks (2 per battery container), associated 33kV transformers, switchgear and cabling. (3)

Inactive • 2023-24 (T-1), 2022-23 (T-1) ...
1.30 MW
Redscar Business Park, Longridge Road, Preston, UK, PR2 5NQ (6 components)
• A 34MW New Build Battery Storage Site.
• A 49MW New Build Battery Storage Site.
• A 49MW existing Battery Storage Site.
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Land to north of SPEN Drumcross GSP, Byers Brae, Bathgate EH54 8TB. See map. (6 components)

The facility consists of a lithium Ion battery storage system capable of importing, storing and exporting electricity. It connects to SPEN?s 33kV distribution network at 33kV (3)

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Ardochrig Substation, off Ardochrig Road, Whitelee Windfarm, South Lanarkshire, G75 0QN (4 components)
• 1 x 50MW Lithium-ion batteryw with duration of 1 hour (2)
• 1 x 50MW Lithium-ion battery with duration of 1 hour
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Land Adjacent to Electricity Sub Station, Stonehill, Charlton, Malmesbury, Wiltshire, SN16 9DX (7 components)
• 49.9MW Battery Energy Storage System located in Malmesbury, Wiltshire (2)
• 49.900MW Battery Energy Storage System
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
The Street, Hacheston, Woodbridge, Suffolk, UK, IP13 9ND (6 components)
• A 50MW New Build Battery Storage site (2)
• Existing 50MW Battery Storage site
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
STOR no.1 site, Ernesettle Road, PLymouth PL5 2TT (1 component)

Storage facility

Inactive • 2022-23 (T-1)
Land adjacent to electricity sub station, Stonehill, Charlton, Wiltshire, SN16 9RP (7 components)
• Battery Energy Storge System located at Minety, providing Capacity Market alongside other grid and power services. (2)
• Battery Energy Storage System located at Minety
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Green Ln, Thurcroft, Wickersley, Rotherham, UK, S66 9JD (12 components)
• A new Build Generating Storage CMU (2)
• Existing Generating Storage CMU
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Loading map...
Showing 9 locations