135 unique locations (712 components) - Page 1 of 6

Dinorwig Power Station, Llanberis, Caernarfon, LL55 4TY (74 components)
• BM unit T_DINO-1 at Dinorwig Power Station (Pumped Storage)
• BM unit T_DINO-2 at Dinorwig Power Station (Pumped Storage)
• BM unit T_DINO-3 at Dinorwig Power Station (Pumped Storage)
• ... and 2 more unique descriptions
Active • 2028-29 (T-4), 2027-28 (T-4) ...
3416.01 MW
Redditch Generation Station, Windsor Road, Redditch, B97 6HE (5 components)
• Gas reciprocating engines as the generating unit. (2)
• Battery Storage Station
• Open cycle gas turbine as the generating unit.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
68.21 MW
Royle Barn Road, Rochdale, OL11 3DX (5 components)

Battery Energy Storage Site (2)

Active • 2026-27 (T-4), 2025-26 (T-4) ...
28.13 MW
Ipswich Road, Cardiff, CF23 9AQ (10 components)
• New build two-hour duration battery storage (2)
• New build one-hour duration storage
Active • 2028-29 (T-4), 2026-27 (T-4) ...
25.98 MW
35-37 Sheffield Road, Newton, Hyde, SK14 2PU (5 components)
• Grid-scale energy storage system based on Lithium Ion, capable of exporting 42MW for a 1 hour duration installed on designated …
• Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours
• New Build 2 Hour Battery Storage Plant.
• ... and 1 more unique description
Active • 2026-27 (T-4), 2025-26 (T-4) ...
22.03 MW
20.22 MW
Clay Tye Farm, Clay Tye Road, Upminster, RM14 3PL (10 components)
• A new build 49.5MW battery energy storage system (4)
• A new build 48MW battery energy storage system
Active • 2025-26 (T-4), 2024-25 (T-4) ...
18.33 MW
Land at Greenfield Road, Clayhill Farm, Westoning, Bedford, MK45 5JD (9 components)

CMU comprising of battery storage and associated plant (7)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
17.94 MW
Land Off 9 Coal Pit Lane, Atherton, Manchester, M46 0RL (5 components)
• Grid-scale energy storage system based on Lithium Ion, capable of exporting 30MW for a 1 hour duration installed on designated …
• Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours
• New Build 2 hour battery storage system.
• ... and 1 more unique description
Active • 2026-27 (T-4), 2025-26 (T-4) ...
16.17 MW
Land at Slack Lane, Westhoughton, Bolton BL5 3LG (5 components)
• Grid-scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration.
• Grid-scale energy storage system based on Lithium Ion, capable of exporting 30MW for a 1 hour duration installed on designated …
• Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours
Active • 2027-28 (T-4), 2026-27 (T-4) ...
14.02 MW
Cowley Substation Blackberry Lane Garsington Oxfordshire OX44 9BD (8 components)
• The CMU is a electro-chemical Lithium-ion battery storage system connected to the transmission system at the National Grid Transmission Substation. (6)
• The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation. (2)
Active • 2028-29 (T-4), 2027-28 (T-4) ...
12.22 MW
Land To The South Of Kemsley Substation Ypres Drive Sittingbourne Kent ME10 2FB (6 components)
• The CMU is a electro-chemical Lithium-ion battery storage system connected to the transmission system at the National Grid Transmission Substation. (3)
• The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation. (2)
Active • 2028-29 (T-4), 2027-28 (T-4) ...
12.22 MW
Land off Stoke Lane, Norwich, NR14 8QD (3 components)
• Grid-scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration.
• Grid-scale energy storage system based on Lithium Ion, capable of exporting 50MW for a 1 hour duration installed on designated …
Active • 2027-28 (T-4), 2025-26 (T-4)
10.77 MW
Bristol Avenue, Blackpool, FY2 0JF (5 components)
• New Build CMU comprising of battery storage and associated plant (3)
• Existing CMU comprising of battery storage and associated plant (2)
Active • 2026-27 (T-4), 2025-26 (T-4) ...
9.61 MW
Camilla Farm, Auchtertool, Kirkcaldy, Fife, KY2 5XW (4 components)

49.9MW Lithium-ion Energy Storage System (4)

Active • 2026-27 (T-4), 2025-26 (T-4) ...
8.87 MW
Barton Hill Way, Torquay, TQ2 8JG (6 components)
• New Build CMU comprising of battery storage and associated plant (3)
• Existing CMU comprising of battery storage and associated plant (2)
Active • 2026-27 (T-4), 2025-26 (T-4) ...
8.72 MW
LAND ON THE SOUTH SIDE OF FAIRY LANE, SALE, M33 2JU. (7 components)

Battery Storage Plant (4)

Active • 2025-26 (T-4), 2024-25 (T-1) ...
8.56 MW
HOWICK HALL FARM HOWICK CROSS LANE, PENWORTHAM, PRESTON, PR1 0NS (13 components)
• Battery Storage Plant (4)
• Gas peaking reciprocating engines
Active • 2025-26 (T-4), 2024-25 (T-4) ...
8.56 MW
Stroud Green Lane Add Cap - Battery, Fareham PO14 2HS (6 components)
• 40MW OF BATTERY ENERGY STORAGE SYSTEMS (3)
• 30MW OF BATTERY ENERGY STORAGE SYSTEMS
• BATTERY ENERGY STORAGE SYSTEM
Active • 2026-27 (T-4), 2025-26 (T-4) ...
8.00 MW
Leafield Battery Site, Monks Lane, Corsham SN13 9PH (4 components)

electricity storage site comprising brand new batteries, inverters and associated connection plant (2)

Active • 2026-27 (T-4), 2025-26 (T-4)
7.09 MW