Home List View Map View Technologies Companies Support Us Help Login Register
Theme

Storage (Duration 1h)

29 unique locations (257 components) - Page 1 of 2

Dinorwig Power Station, Llanberis, Caernarfon, LL55 4TY (74 components)
• BM unit T_DINO-1 at Dinorwig Power Station (Pumped Storage)
• BM unit T_DINO-2 at Dinorwig Power Station (Pumped Storage)
• BM unit T_DINO-3 at Dinorwig Power Station (Pumped Storage)
• ... and 2 more unique descriptions
Active • 2028-29 (T-4), 2027-28 (T-4) ...
3416.01 MW
Redditch Generation Station, Windsor Road, Redditch, B97 6HE (5 components)
• Gas reciprocating engines as the generating unit. (2)
• Battery Storage Station
• Open cycle gas turbine as the generating unit.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
68.21 MW
Ipswich Road, Cardiff, CF23 9AQ (10 components)
• New build two-hour duration battery storage (2)
• New build one-hour duration storage
Active • 2028-29 (T-4), 2026-27 (T-4) ...
25.98 MW
20.22 MW
Land at Greenfield Road, Clayhill Farm, Westoning, Bedford, MK45 5JD (9 components)

CMU comprising of battery storage and associated plant (7)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
17.94 MW
Bronze Cricket Club, Chapel Lane, Great Barr, Walsall, WS9 0QU (2 components)
• 2 hr duration Battery Energy Storage System located in England
• Energy Storage Facility
Active • 2028-29 (T-4), 2026-27 (T-4)
14.62 MW
Cowley Substation Blackberry Lane Garsington Oxfordshire OX44 9BD (8 components)
• The CMU is a electro-chemical Lithium-ion battery storage system connected to the transmission system at the National Grid Transmission Substation. (6)
• The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation. (2)
Active • 2028-29 (T-4), 2027-28 (T-4) ...
12.22 MW
Land To The South Of Kemsley Substation Ypres Drive Sittingbourne Kent ME10 2FB (6 components)
• The CMU is a electro-chemical Lithium-ion battery storage system connected to the transmission system at the National Grid Transmission Substation. (3)
• The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation. (2)
Active • 2028-29 (T-4), 2027-28 (T-4) ...
12.22 MW
Land To The South Of Rock Farm, Rocks Green, Ludlow, SY8 2DS (13 components)
• 17.315 MW installed capacity Battery Storage facility (2)
• 17.615 MW installed capacity Battery Storage facility (2)
• 19.791 MW installed capacity Battery Storage facility
Active • 2028-29 (T-4), 2027-28 (T-4) ...
5.09 MW
Sunrise House, Hulley Road, Macclesfield, Cheshire, SK10 2LP (7 components)
• Battery storage located at Sunrise House, Hulley Road, Macclesfield, Cheshire, SK10 2LP with a nameplate capacity of 20.000 MW. Connection … (3)
• 20.000MW of battery storage located at Sunrise House, Hulley Road, Macclesfield, Cheshire, SK10 2LP (2)
Active • 2028-29 (T-4), 2027-28 (T-4) ...
4.12 MW
Lascar Works, Tanpits Road, Bury, BL9 5BY (8 components)
• Battery storage located at Lascar Works, Tanpits Road, Bury, BL9 5BY with a nameplate capacity of 20.000 MW. Connection capacity … (3)
• 20.000MW of storage located at Lascar Works, Tanpits Road, Bury, BL9 5BY (2)
Active • 2028-29 (T-4), 2027-28 (T-4) ...
4.10 MW
Larport Farm, Larport Lane, Dormington, Hereford, HR1 4EP (7 components)
• Battery storage located at Larport Farm, Larport Lane, Dormington, Hereford, HR1 4EP with a nameplate capacity of 19.500 MW. Connection … (3)
• 19.500MW of battery storage located at Larport Farm, Larport Lane, Dormington, Hereford, HR1 4EP (2)
Active • 2028-29 (T-4), 2027-28 (T-4) ...
3.94 MW
Land adjacent to Nursling Substation Station Road Nursling Southampton SO16 0AH (10 components)
• battery storage unit (3)
• New build battery storage unit
• New build transmission connected battery storage unit comprising battery cells, DC switchgear, power conversion, AC voltage transformation and connection switchgear …
Active • 2028-29 (T-4), 2025-26 (T-1) ...
3.22 MW
Stockbridge Storage Farm, Land Adjacent to B3049, Stockbridge Road, Winchester.SO22 5FP (12 components)
• 10.0MW Battery Storage facility located at Stockbridge Road, Winchester, Hampshire (3)
• 8.179 MW Battery Storage facility located at Stockbridge Road, Winchester, Hampshire
• 8.436 MW Battery Storage facility located at Stockbridge Road, Winchester, Hampshire
Active • 2028-29 (T-4), 2027-28 (T-4) ...
2.69 MW
Unit 1b, Britannia Industrial Estate, Union Road, Bolton, BL2 2HP (5 components)
• Battery Storage Station (3)
• 3 x 2MW gas gen sets
Active • 2028-29 (T-4), 2027-28 (T-4) ...
1.88 MW
Land at Hall Farm, Northwold, Thetford, IP26 5LQ (2 components)

7.5MW, 1-hour duration battery energy storage system (BESS). BESS is being constructed alongside a co-located solar PV farm which it shares a grid connection with. (2)

Active • 2028-29 (T-4), 2025-26 (T-1)
1.81 MW
Mill Farm Caythorpe Heath Ln Caythorpe Grantham NG32 3ER (13 components)
• 7 MW of Battery Storage located at Grantham. (3)
• Battery Storage located at Grantham. (2)
Active • 2028-29 (T-4), 2027-28 (T-4) ...
1.71 MW
Dairy Lane Westhamnett Chichester PO20 2BG (7 components)

4MW battery co-located with a solar farm (5)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
1.10 MW
BRLR, land east of Redhouse electricity substation, Heatherywood Road, Kirkcaldy, Fife, KY1 3NW. (1 component)

Battery energy storage system (1c rating, NMC lithium ion) comprising eight inverters with nominal power output rating of 2.0MW each (16.0MW total). The connection capacity of the BESS has been …

Active • 2028-29 (T-4)
1.05 MW
Roundswell Business Park, Barnstaple, Devon EX31 3TD (4 components)

Front of the Meter battery storage asset located in Devon. (4)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
1.02 MW
Fell View Farm, Preston Road, Grimsargh, Preston, PR2 5SD (10 components)
• Battery storage located at Fell View Farm, Preston Road, Grimsargh, Preston, PR2 5SD with a nameplate capacity of 1.200 MW. … (3)
• 1.200MW of storage located at Fell View Farm, Preston Road, Grimsargh, Preston, PR2 5SD (2)
Active • 2028-29 (T-4), 2027-28 (T-4) ...
0.40 MW
Carlton, Stockton-on-Tees, TS21 1EA (5 components)
• Battery storage located at Carlton, Stockton-on-Tees, TS21 1EA with a nameplate capacity of 1.200 MW. Connection capacity is calculated as … (3)
• 1.200MW of storage located at Carlton, Stockton-on-Tees, TS21 1EA (2)
Active • 2028-29 (T-4), 2027-28 (T-4) ...
0.20 MW
Low Burntoft, Newton Bewley, Billingham, Durham, TS22 5PD (5 components)
• Battery storage located at Low Burntoft, Newton Bewley, Billingham, Durham, TS22 5PD with a nameplate capacity of 1.200 MW. Connection … (3)
• 1.200MW of storage located at Low Burntoft, Newton Bewley, Billingham, Durham, TS22 5PD (2)
Active • 2028-29 (T-4), 2027-28 (T-4) ...
0.20 MW
Hungerford Farm, Winchfield, Hook, RG27 8SW (5 components)
• Battery storage located at Hungerford Farm, Winchfield, Hook, RG27 8SW with a nameplate capacity of 1.200 MW. Connection capacity is … (3)
• 1.200MW of storage located at Hungerford Farm, Winchfield, Hook, RG27 8SW (2)
Active • 2028-29 (T-4), 2027-28 (T-4) ...
0.20 MW
Bluehouse Farm, Newton Bewley, Billingham, Durham, TS22 5PW (5 components)
• Battery storage located at Bluehouse Farm, Newton Bewley, Billingham, Durham, TS22 5PW with a nameplate capacity of 1.200 MW. Connection … (3)
• 1.200MW of storage located at Bluehouse Farm, Newton Bewley, Billingham, Durham, TS22 5PW (2)
Active • 2028-29 (T-4), 2027-28 (T-4) ...
0.20 MW
Loading map...
Showing 25 locations