Home List View Map View Technologies Companies Support Us Help Login Register
Theme

Storage (Duration 1h)

24 unique locations (105 components)

Pen-y-Cymoedd Wind Farm, Treherbert Road, Treherbert, Treorchy. Rhondda Cynon Taf. South Wales CF42 5SX (10 components)

A new build 22 MW battery storage facility. Comprising of five containerised battery units, ten inverter banks (2 per battery container), associated 33kV transformers, switchgear and cabling. (3)

Inactive • 2023-24 (T-1), 2022-23 (T-1) ...
1.30 MW
Land at Burnley Road Simonstone BB12 7ND (4 components)

The CMU will be formed of multiple individual storage units controlled centrally and exporting to the distribution system.

Inactive • 2019-20 (T-1)
Church Hill Rd, Middleton-on-the-Wolds, Driffield YO25 9UG (6 components)
• 0.250MW Battery Energy Storage System (2)
• 0.25MW of Demand Reduction
Active • 2025-26 (T-4), 2024-25 (T-4) ...
PROJECT SCENE ENERGY CENTRE, TRENT BASIN, TRENT LANE, SNEINTON, NOTTINGHAM, NOTTINGHAMSHIRE, NG2 4DS (4 components)
• 0.500MW Battery Energy Storage System (2)
• 0.5MW of demand reduction
Active • 2025-26 (T-4), 2024-25 (T-4) ...
Gateshead Local Environmental Services, Park Road, Gateshead, NE8 3HN (3 components)

Battery storage (3)

Inactive • 2021-22 (T-4), 2019-20 (T-1) ...
Cleveland Potash ICL UK Boulby Mine Loftus Saltburn TS13 4UZ (2 components)

6MW BESS (2)

Inactive • 2019-20 (T-1), 2018-19 (T-1)
Land adjacent to Vauxhall Effluent Treatment Works, North Road, Ellesmere Port, Cheshire CH65 1AL (6 components)

The CMU will be formed of multiple individual storage units controlled centrally and exporting to the distribution system. (3)

Inactive • 2020-21 (T-4), 2019-20 (T-1) ...
J3 Business Park Balby Carr End Doncaster DN4 8DE (3 components)
• 10 MW Storage facility located at Balby, Doncaster. (2)
• 10 MW Storage facility
Inactive • 2021-22 (T-4), 2019-20 (T-1) ...
LAND AT TOLLGATE FARM, WELHAM GREEN, AL4 0NY (5 components)
• The CMU component at Tollgate Farm is an energy storage system comprised of batteries with an import capacity if 49.5 … (2)
• The CMU component at Tollgate Farm is an energy storage system comprised of batteries with an import and export capacity …
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Battery Plant, Fideoak Mill, Fideoak, Taunton, TA4 1AF (5 components)

Battery Energy Storage System (3)

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
NORWICH ROAD INDUSTRIAL ESTATE, HALESWORTH, SUFFOLK, IP19 8QJ (5 components)
• The CMU component at Halesworth is an energy storage system comprised of batteries and will have an import capacity of … (2)
• The CMU component at Halesworth is an energy storage system comprised of batteries and will have an import and export …
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Tamerton Road, Roborough, A386, Plymouth PL6 7BQ (5 components)

2MW BESS (3)

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Altcar Training Camp Grange Road Ince Blundell, L38 7JE (2 components)

Battery Energy Storage System (2)

Inactive • 2022-23 (T-4), 2019-20 (T-1)
Land West Of Mossbank Cottages, Drumcross, Bathgate, EH48 1JX (4 components)
• Erection of up to 16 shipping containers measuring around 16.2m x 3m x 3m electricity storage facility housing lithium-ion battery … (2)
• Erection of up to 16 shipping containers measuring around 16.2m x 3m x 3m electricity storage facility housing lithium-ion battery …
Active • 2025-26 (T-4), 2022-23 (T-4) ...
Land South of Main Road, Bilton, Hull, HU11 4DZ (2 components)

New build Battery Energy Storage with export up to 21MW. Refer to the Covering Letter for further details. (2)

Inactive • 2022-23 (T-4), 2019-20 (T-1)
Boundary Street, Wigan WN1 3AP (6 components)

The CMU will be formed of multiple individual storage units controlled centrally and exporting to the distribution system. (3)

Inactive • 2021-22 (T-4), 2019-20 (T-1) ...
Land to the North of Great Wheatley Road, Rayleigh, SS6 7AR (3 components)

The CMU component at the Rayleigh Battery Storage Facility will be an energy storage system comprised of batteries and will have import and export capacity of 10.800MW each. (3)

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Land to the west of Old Forge Dr, Redditch B98 7SY, UK (3 components)

The CMU component at the Ipsley Battery Storage Facility will be an energy storage system comprised of batteries and will have import and export capacity of 4MW each. (3)

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Land at Boscar Grange Farm, Thirsk Road, Easingwold, York, YO61 3NQ (3 components)
• A 27MW (import and export) battery energy storage project. The project consists of containerised Inverters, containerised Li-Ion batteries, Transformers, Customer … (2)
• A 20MW (import and export) battery energy storage project. The project consists of containerised Inverters, containerised Li-Ion batteries, Transformers, Customer …
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Breck Road, Wallasey, Liverpool (2 components)

The Burbo Bank battery is a 2MW/2MWh Battery located near the Burbo Bank offshore wind farm, and near Scottish Power Energy Network's Wallasey substation. (2)

Inactive • 2021-22 (T-4), 2019-20 (T-1)
Old Gloucester Rd, Alveston, Bristol, UK, BS37 9TU (4 components)

This CMU is formed of a battery bank and PCS capable of providing 10MW of power. The system is connected via switch gear and a transformer to the 132kV network … (3)

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Milton Court Farm, Dorking, RH4 3LY (6 components)
• 6MW battery energy storage facility at Milton Court Farm, Dorking (2)
• 5MW battery energy storage facility at Milton Court Farm, Dorking
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Maidenhead Road, Windsor, SL4 5GD (8 components)
• Battery storage (2)
• Battery strorage unit
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Sub station Percival Lane Runcorn Cheshire WA7 4DS (4 components)

The CMU will be formed of multiple individual storage units controlled centrally and exporting to the distribution system. (2)

Inactive • 2020-21 (T-4), 2019-20 (T-1)
Loading map...
Showing 24 locations