Storage (Duration 1h)

30 unique locations (175 components) - Page 1 of 2

Land off Sundridge Hill, Cuxton, Rochester, ME2 1LB. (9 components)
• The CMU component at Cuxton is an energy storage system comprised of batteries with an import and export capacity of … (4)
• The CMU component at Cuxton is an energy storage system comprised of batteries with an import and export capacity of …
Active • 2026-27 (T-4), 2025-26 (T-4) ...
4.55 MW
Pen-y-Cymoedd Wind Farm, Treherbert Road, Treherbert, Treorchy. Rhondda Cynon Taf. South Wales CF42 5SX (10 components)

A new build 22 MW battery storage facility. Comprising of five containerised battery units, ten inverter banks (2 per battery container), associated 33kV transformers, switchgear and cabling. (5)

Inactive • 2023-24 (T-1), 2022-23 (T-1) ...
1.30 MW
Slamseys Farm, Blackley Lane, Great Notley, CM77 7QW (9 components)
• 5MW, 1 hour/5MWh lithium-ion battery (4)
• Slamseys is a 5MW (import and export) battery energy storage project. The project consists of containerised Inverters, containerised Li-Ion batteries, …
Active • 2024-25 (T-4), 2023-24 (T-1) ...
0.93 MW
NORWICH ROAD INDUSTRIAL ESTATE, HALESWORTH, SUFFOLK, IP19 8QJ (5 components)
• The CMU component at Halesworth is an energy storage system comprised of batteries and will have an import and export … (3)
• The CMU component at Halesworth is an energy storage system comprised of batteries and will have an import capacity of … (2)
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Land at Boscar Grange Farm, Thirsk Road, Easingwold, York, YO61 3NQ (3 components)
• A 27MW (import and export) battery energy storage project. The project consists of containerised Inverters, containerised Li-Ion batteries, Transformers, Customer … (2)
• A 20MW (import and export) battery energy storage project. The project consists of containerised Inverters, containerised Li-Ion batteries, Transformers, Customer …
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Tamerton Road, Roborough, A386, Plymouth PL6 7BQ (5 components)

2MW BESS (5)

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Altcar Training Camp Grange Road Ince Blundell, L38 7JE (2 components)

Battery Energy Storage System (2)

Inactive • 2022-23 (T-4), 2019-20 (T-1)
Land to the North of Great Wheatley Road, Rayleigh, SS6 7AR (3 components)

The CMU component at the Rayleigh Battery Storage Facility will be an energy storage system comprised of batteries and will have import and export capacity of 10.800MW each. (3)

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Old Gloucester Rd, Alveston, Bristol, UK, BS37 9TU (4 components)

This CMU is formed of a battery bank and PCS capable of providing 10MW of power. The system is connected via switch gear and a transformer to the 132kV network … (4)

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Land to the west of Old Forge Dr, Redditch B98 7SY, UK (3 components)

The CMU component at the Ipsley Battery Storage Facility will be an energy storage system comprised of batteries and will have import and export capacity of 4MW each. (3)

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Land South of Main Road, Bilton, Hull, HU11 4DZ (2 components)

New build Battery Energy Storage with export up to 21MW. Refer to the Covering Letter for further details. (2)

Inactive • 2022-23 (T-4), 2019-20 (T-1)
Boundary Street, Wigan WN1 3AP (6 components)

The CMU will be formed of multiple individual storage units controlled centrally and exporting to the distribution system. (3)

Inactive • 2021-22 (T-4), 2019-20 (T-1) ...
Gateshead Local Environmental Services, Park Road, Gateshead, NE8 3HN (3 components)

Battery storage (3)

Inactive • 2021-22 (T-4), 2019-20 (T-1) ...
J3 Business Park Balby Carr End Doncaster DN4 8DE (3 components)
• 10 MW Storage facility located at Balby, Doncaster. (2)
• 10 MW Storage facility
Inactive • 2021-22 (T-4), 2019-20 (T-1) ...
Breck Road, Wallasey, Liverpool (2 components)

The Burbo Bank battery is a 2MW/2MWh Battery located near the Burbo Bank offshore wind farm, and near Scottish Power Energy Network's Wallasey substation. (2)

Inactive • 2021-22 (T-4), 2019-20 (T-1)
Land adjacent to Vauxhall Effluent Treatment Works, North Road, Ellesmere Port, Cheshire CH65 1AL (6 components)

The CMU will be formed of multiple individual storage units controlled centrally and exporting to the distribution system. (3)

Inactive • 2020-21 (T-4), 2019-20 (T-1) ...
Land at Burnley Road Simonstone BB12 7ND (4 components)

The CMU will be formed of multiple individual storage units controlled centrally and exporting to the distribution system.

Inactive • 2019-20 (T-1)
Cleveland Potash ICL UK Boulby Mine Loftus Saltburn TS13 4UZ (2 components)

6MW BESS (2)

Inactive • 2019-20 (T-1), 2018-19 (T-1)
Zone P, Asfordby Business Park, Welby Road, Melton Mowbray, Leicestershire, LE14 3JL (31 components)
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system. (2)
• The CMU will be formed of multiple individual reciprocating generating units controlled centrally and exporting to the distribution system. (2)
• The CMU will be formed of multiple individual reciprocating diesel generating units controlled centrally and exporting to the distribution system.
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Maidenhead Road, Windsor, SL4 5GD (8 components)
• Battery storage (2)
• Battery strorage unit (2)
• Battery Storage
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Brotherton Weir, Knottingley West Yorkshire WF11 8HR (7 components)
• 1.200MW Battery Energy Storage System (3)
• 1.2 MW of demand reduction
• The CMU component at Knottingley is an energy storage system comprised of Lithium-ion batteries. The system will have a 1.2 …
Active • 2025-26 (T-4), 2024-25 (T-4) ...
Thrybergh Weir Kilnhurst Mexborough South Yorkshire S64 5TJ (7 components)
• 1.200MW Battery Energy Storage System (3)
• 1.200 MW of demand reduction
• The CMU component at Thrybergh is an energy storage system comprised of Lithium-ion batteries. The system will have a 1.2 …
Active • 2025-26 (T-4), 2024-25 (T-4) ...
Church Hill Rd, Middleton-on-the-Wolds, Driffield YO25 9UG (6 components)
• 0.250MW Battery Energy Storage System (3)
• 0.25MW of Demand Reduction
• 5MW of demand reduction
Active • 2025-26 (T-4), 2024-25 (T-4) ...
Land West Of Mossbank Cottages, Drumcross, Bathgate, EH48 1JX (4 components)
• Erection of up to 16 shipping containers measuring around 16.2m x 3m x 3m electricity storage facility housing lithium-ion battery … (2)
• Erection of up to 16 shipping containers measuring around 16.2m x 3m x 3m electricity storage facility housing lithium-ion battery … (2)
Active • 2025-26 (T-4), 2022-23 (T-4) ...
Loading map...
Showing 25 locations