Home List View Map View Technologies Companies Support Us Help Login Register
Theme

Storage (Duration 1h)

11 unique locations (90 components)

Unit G, Algernon Industrial Estate, North Shields, Tyne And Wear, NE27 0NB, United Kingdom (13 components)
• Existing 25 MW storage site using Lithium Ion Batteries (3)
• 25 MW storage site using Lithium Ion Batteries (2)
Active • 2026-27 (T-4), 2025-26 (T-1) ...
7.29 MW
Land adjacent to Nursling Substation Station Road Nursling Southampton SO16 0AH (10 components)
• battery storage unit (3)
• New build battery storage unit
• New build transmission connected battery storage unit comprising battery cells, DC switchgear, power conversion, AC voltage transformation and connection switchgear …
Active • 2028-29 (T-4), 2025-26 (T-1) ...
3.22 MW
Stockbridge Storage Farm, Land Adjacent to B3049, Stockbridge Road, Winchester.SO22 5FP (12 components)
• 10.0MW Battery Storage facility located at Stockbridge Road, Winchester, Hampshire (3)
• 8.179 MW Battery Storage facility located at Stockbridge Road, Winchester, Hampshire
• 8.436 MW Battery Storage facility located at Stockbridge Road, Winchester, Hampshire
Active • 2028-29 (T-4), 2027-28 (T-4) ...
2.69 MW
Silver Spinney Farm, Wicken Road, Wicken, MK19 6BS (11 components)
• A 5MW - 7.5MWh containerised Energy Storage System to be installed on designated land adjacent to an existing 11kV distribution … (3)
• A 5MW - 5MWh containerised Energy Storage System to be installed on designated land adjacent to an existing 11kV distribution … (2)
Active • 2026-27 (T-4), 2024-25 (T-4) ...
1.46 MW
Pen-y-Cymoedd Wind Farm, Treherbert Road, Treherbert, Treorchy. Rhondda Cynon Taf. South Wales CF42 5SX (10 components)

A new build 22 MW battery storage facility. Comprising of five containerised battery units, ten inverter banks (2 per battery container), associated 33kV transformers, switchgear and cabling. (5)

Inactive • 2023-24 (T-1), 2022-23 (T-1) ...
1.30 MW
Land North of Clayhill Farm, Westoning, MK45 5JD (7 components)
• 6.000MW of storage located at Westoning (4)
• 6.000MW of battery storage located at Westoning.
Active • 2027-28 (T-4), 2026-27 (T-4) ...
1.11 MW
Tamerton Road, Roborough, A386, Plymouth PL6 7BQ (5 components)

2MW BESS (5)

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Battery Plant, Fideoak Mill, Fideoak, Taunton, TA4 1AF (5 components)

Battery Energy Storage System (4)

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Land To The South Of Kemsley Substation Ypres Drive Sittingbourne Kent ME10 2FB (3 components)

The CMU is a electro-chemical Lithium-ion battery storage system connected to the transmission system at the National Grid Transmission Substation. (3)

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Land Adjacent to Electricity Sub Station, Stonehill, Charlton, Malmesbury, Wiltshire, SN16 9DX (7 components)
• 49.9MW Battery Energy Storage System located in Malmesbury, Wiltshire (3)
• 49.900MW Battery Energy Storage System (2)
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Land adjacent to electricity sub station, Stonehill, Charlton, Wiltshire, SN16 9RP (7 components)
• Battery Energy Storge System located at Minety, providing Capacity Market alongside other grid and power services. (3)
• Battery Energy Storage System located at Minety (2)
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Loading map...
Showing 11 locations