Home List View Map View Technologies Companies Support Us Help Login Register
Theme

Storage (Duration 1h)

66 unique locations (330 components) - Page 1 of 3

Clay Tye Farm, Clay Tye Road, Upminster, RM14 3PL (10 components)

A new build 49.5MW battery energy storage system (3)

Active • 2025-26 (T-4), 2024-25 (T-4) ...
18.33 MW
Wearmaster House, Malthouse Lane, Hurstpierpoint, Hassocks, BN6 9LA (11 components)
• A new build 32MW battery energy storage system
• A new build 34MW battery energy storage system
• A new build 34MW battery energy storage system commissioned in July 2021
Active • 2024-25 (T-4), 2023-24 (T-1) ...
12.59 MW
Slamseys Farm, Blackley Lane, Great Notley, CM77 7QW (9 components)

5MW, 1 hour/5MWh lithium-ion battery (3)

Active • 2024-25 (T-4), 2023-24 (T-1) ...
0.93 MW
Thrybergh Weir Kilnhurst Mexborough South Yorkshire S64 5TJ (7 components)
• 1.200MW Battery Energy Storage System (2)
• 1.200 MW of demand reduction
Active • 2025-26 (T-4), 2024-25 (T-4) ...
Back Lane, Chesterfield, S44 5XQ (8 components)
• A Battery Energy Storage System. (2)
• 10 x 1mw Battery Storage units to be installed on designated land at Back Lane - Connection offer is for …
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Site 300 metres South West of Shilton Cottage, Old Greenock Road, Bishopton, PA7 5NS (2 components)

Erection of up to 16 shipping containers measuring around 16.2m x 3m x 3m electricity storage facility housing lithium-ion battery storage units, ancillary equipment and substation building. Substation building includes; … (2)

Active • 2025-26 (T-4), 2022-23 (T-4)
PROJECT SCENE ENERGY CENTRE, TRENT BASIN, TRENT LANE, SNEINTON, NOTTINGHAM, NOTTINGHAMSHIRE, NG2 4DS (4 components)
• 0.500MW Battery Energy Storage System (2)
• 0.5MW of demand reduction
Active • 2025-26 (T-4), 2024-25 (T-4) ...
Catsbrain Farm, Stratton St Margaret, Swindon, SN3 4TD (8 components)

The CMU component at Catsbrain Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 20 MW export capacity and an import capacity of 20 … (3)

Active • 2025-26 (T-4), 2024-25 (T-4) ...
The Common, Malmesbury, Wiltshire, SN16 9RJ (10 components)
• A Battery Energy Storage System. (2)
• 10 x 1mw Battery Storage units to be installed on designated land at Church Bottom - Connection offer is for …
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Hawthorne Road, Bootle, Merseyside, L20 5AG. (3 components)

The CMU comprises Lithium Ion batteries housed in ISO containers with additional containers used to house the converters. (3)

Active • 2024-25 (T-4), 2022-23 (T-4) ...
Land adjacent to electricity sub station Stonehill Charlton Wiltshire SN16 9RP (3 components)

Lithium Ion battery storage system capable of importing, storing and exporting electricity. (3)

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Land at Rhyd y Groes Rhosgoch Anglesey, Wales LL66 0AT (7 components)
• 1 x 49.99 MW distribution connected battery storage plant located on agricultural land on the island of Anglesey, north Wales. (2)
• 1 x 49.99 MW distribution connected photovoltaic plant located on agricultural land on the island of Anglesey, north Wales.
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Gipsy Lane, A664, Rochdale, OL11 3AE (4 components)
• 10 x 1mw Battery Storage units to be installed on designated land at Gipsy Lane - Connection offer is for …
• 8 x 1mw Battery Storage units to be installed on designated land at Gipsy Lane - Connection offer is for …
• A Battery Energy Storage System
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Russell Farm, Hursley, Winchester SO21 2UZ (8 components)

The CMU component at Russell Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 20 MW export capacity and an import capacity of 20 … (3)

Active • 2025-26 (T-4), 2024-25 (T-4) ...
Whitehouse Farm, Rhydd Road, Guarlford, WR13 6NZ (8 components)

The CMU component at Whitehouse Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 40 MW export capacity and an import capacity of 40 … (3)

Active • 2025-26 (T-4), 2024-25 (T-4) ...
Redscar Business Park, Longridge Road, Preston, UK, PR2 5NQ (6 components)
• A 34MW New Build Battery Storage Site.
• A 49MW New Build Battery Storage Site.
• A 49MW existing Battery Storage Site.
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Brotherton Weir, Knottingley West Yorkshire WF11 8HR (7 components)
• 1.200MW Battery Energy Storage System (2)
• 1.2 MW of demand reduction
Active • 2025-26 (T-4), 2024-25 (T-4) ...
LAND AT TOLLGATE FARM, WELHAM GREEN, AL4 0NY (5 components)
• The CMU component at Tollgate Farm is an energy storage system comprised of batteries with an import capacity if 49.5 … (2)
• The CMU component at Tollgate Farm is an energy storage system comprised of batteries with an import and export capacity …
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Plot C Land at Severn Road Avonmouth BS10 7SE (4 components)

The CMU will be formed of multiple individual Batteries. This site is to include a Battery Energy Storage System (BESS) that can either operate as import or export at will. … (2)

Inactive • 2023-24 (T-4), 2022-23 (T-4)
Battery Plant, Fideoak Mill, Fideoak, Taunton, TA4 1AF (5 components)

Battery Energy Storage System (3)

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Church Hill Rd, Middleton-on-the-Wolds, Driffield YO25 9UG (6 components)
• 0.250MW Battery Energy Storage System (2)
• 0.25MW of Demand Reduction
Active • 2025-26 (T-4), 2024-25 (T-4) ...
Land North of Heatherywood Road, Kirkcaldy, Fife, KY1 3NW (5 components)

New build storage facility (3)

Active • 2024-25 (T-4), 2023-24 (T-4) ...
Land at Weirs Drove, Cambridge, CB25 0BP (5 components)

49.900MW/49.900MWh battery storage asset, 1 hour duration (3)

Active • 2025-26 (T-4), 2024-25 (T-1) ...
Loading map...
Showing 25 locations